THE INDEX: 64 17 · week of Jun 29permits soft, openings quiet, deal ledger quiet

The Philadelphia Index

Entity File · The Public Record

Company / LLC

10 Bethlehem Pike Property Owner LLC

8 permits

Records on file
8

Permits (as owner)

8 entries

  1. Issued Jul 7, 2026

    10 Bethlehem Pike

    New Construction · INSTALLATION OF HVAC SYSTEM FOR NEW CONSTRUCTION MIXED USE BUILDING AS PER APPROVED PLANS. *2018 IMC REVIEW*

  2. Issued Apr 20, 2026

    10 Bethlehem Pike

    New Construction · INSTALL NEW FIRE SUPPRESSION SYSTEM COMPLYING WITH NFPA 13 THROUGHOUT THE BUILDING TO INCLUDE 4" MAIN FIRE SERVICE LINE WITH A 4" WILKINS 350 BACKFLOW PREVENTION ASSEMBLY, UL LISTED PEERLESS 4PVF8G FIRE PUMP & JOCKEY PUMP COMPLYING WITH NFPA 20 AND TWO (2) STANDPIPE RISERS COMPLYING WITH NFPA 14 AS PER APPROVED PLANS. ALL WORK SHALL BE PERFORMED BY A FIRE SUPPRESSION CONTRACTOR LICENSED BY THE CITY OF PHILADELPHIA.

  3. Issued Jan 27, 2026

    10 Bethlehem Pike

    New Construction or Additions · NEW CONSTRUCTION OF MIXED USE APARTMENT BUILDING. INTERIOR INSTALLATION OF DRAINAGE, WASTE, VENT, AND WATER SUPPLY FOR LISTED FIXTURES. ALL PIPING LOCATED IN AND INSTALLED FOR USE OF COMMERCIAL SPACE SHALL BE METALLIC INCLUDING ALL VENTING. VENTING TO BE DESIGNED AND INSTALLED IN ACCORDANCE WITH SECTION 919 PHILADELPHIA SINGLE STACK VENT SYSTEM. A 6" VENT SHALL BE PROVIDED AS CONTINUATION OF THE BUILDING SEWER IN COMPLIANCE WITH SECTION P-919.3.5. ALL WORK TO BE PERRFORMED IN STRICT COMPLIANCE W

  4. Issued Nov 25, 2025

    10 Bethlehem Pike

    New Construction · INSTALL SEVICE EQUIPMENT , FIRE PUMP, ELEVATOR, HOUSE PANEL, WIRE THROUGHOUT. INSTALL OUTLETS, SWITCHES, LIGHT FIXTURES, SMOKE ALARMS,EMERGENCY LIGHTS, EXIT SIGNS, SHOW-WINDOW RECEPTACLES AND GROUNDING. INSTALL FIRE ALARM SYSTEM, RESCUE ASSISTANCE SYSTEM. . ALL WORK IS TO BE DONE ACCORDING TO APPROVED DRAWINGS-2017 NEC,2018 NFPA-72.

  5. Issued Nov 14, 2025

    10 Bethlehem Pike

    New Construction or Additions · INSTALL SANITARY AND STORM CTs, FAIs, MDs & 2" WDP.

  6. Issued Sep 24, 2025

    10 Bethlehem Pike

    New Construction or Additions · Plumbing Permit for combo SP-2025-001050 Extension of storm sewer main as specified in plans. Work performed in strict compliance with 2018 PPC and approved plans. Lateral connection to be made in correspondence with approved utility plan

  7. Issued Sep 22, 2025

    10 Bethlehem Pike

    Sitework with Onsite Utility Services · FOR EARTH DISTURBANCE AND SITE WORK IN ASSOCIATION WITH THE EXTENSION OF A PRIVATE SEWER MAIN AS PER APPROVED PLANS. SEPARATE PERMIT REQUIRED FOR PLUMBING WORK.

  8. Issued Sep 17, 2025

    10 Bethlehem Pike

    Tank Install/Removal · TANK REMOVAL PERMIT - REMOVE TWO (2) UNDERGROUND STORAGE TANKS (UST). THE REMOVAL MUST COMPLY WITH THE REGULATIONS OF THE PENNSYLVANIA DEPARTMENT OF ENVIRONMENTAL PROTECTION (PADEP).

Track this owner

We'll flag their next deal, permit, or filing — usually before the neighbors know.

Entities are grouped by a normalized name from the public record; a separate legal entity per building is common, so some portfolios span several related names. Sources: Phila. Dept. of Records (deeds), L&I (permits & violations), Dept. of Revenue (tax delinquencies), reflecting the record as of our last weekly ingest. Verify independently before relying on it.
Last generated August 2, 2026.