1033 North Second, Association
5 permits · 8 violations
- Records on file
- 13
Permits (as owner)
5 entries
- Issued Jun 1, 2026
Addition and/or Alteration · Electrical renovations to the 3rd and 4th floor of an apartment building. Turning the two floors into offices with all lighting ,receptacles and data. ALL WORK IS TO BE DONE ACCORDING TO APPROVED DRAWINGS-2017 NEC. **NO FIRE ALARM ON THIS PERMIT**
- Issued Apr 10, 2026
Addition and/or Alteration · Furnish and install a fire alarm system for the office fit-out on the third and fourth floors. Work includes installation of initiating devices, notification appliances, wiring, terminations, and system components required for each floor. Provide interconnection and wiring from the third and fourth floor systems to the existing main fire alarm control panel located on the first floor. All work shall be performed in accordance with 2016 NFPA 72, the 2017 NEC and per approved plans.
- Issued Mar 20, 2026
Addition and/or Alterations · EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the relocation of sprinkler heads as per attached standards. Deviations from these standards require submission of construction and site plans. Relocate 50 existing sprinkler heads to ensure the safety of the building, per NFPA 13
- Issued Mar 17, 2026
Alterations · Replace fixtures: 8 lavatories, 15 toilet/urinals. **WITHOUT PIPING**
- Issued Mar 13, 2026
1 units
Addition and/or Alteration · FOR LEVEL II ALTERATIONS FOR FITOUT OF 3RD & 4TH FLOORS TO INCLUDE NEW PARTITIONS, FIXTURES, FURNISHINGS, FINISHES AS PER APPROVED PLANS. SEPARATE PERMITS REQUIRED FOR MEP AND FIRE SUPRRESSION WORK. *2018 IEBC*
Violations
8 entries
- Violation Jun 8, 2026OPEN
PERIODIC TESTING
- Violation Jun 8, 2026OPEN
SUPPRESSION SYSTEM TESTING & MAINTENANCE
- Violation Jun 8, 2026OPEN
FIRE PROTECTION SYSTEMS
- Violation Jun 8, 2026OPEN
FIRE EXTINGUISHER HANGERS & BRACKETS
- Violation Jun 8, 2026OPEN
FIRE EXTINGUISHERS
- Violation Jun 8, 2026OPEN
WORKING SPACE & CLEARANCE
- Violation Jun 8, 2026OPEN
CLEARANCE FROM IGNITION SOURCES
- Violation Jun 8, 2026OPEN
ILLUMINATION REQUIRED
Track this owner
We'll flag their next deal, permit, or filing — usually before the neighbors know.
Entities are grouped by a normalized name from the public record; a separate legal entity per building is common, so some portfolios span several related names. Sources: Phila. Dept. of Records (deeds), L&I (permits & violations), Dept. of Revenue (tax delinquencies), reflecting the record as of our last weekly ingest. Verify independently before relying on it.