- Issued Dec 15, 2025
Addition and/or Alteration · Provide selective demolition of (4) to allow for open cubicle area expansion. Provide new lighting fixtures and controls utilizing existing branch circuit wiring. Provide new receptacles utilizing existing branch circuit wiring. Provide new branch circuit wiring for additional cubicle furniture. Provide in-wall telecommunication sleeves for wiring done by others. Relocate (1) existing fire alarm notification appliance.-2017 NEC,2016 NFPA-72.
- Issued Nov 27, 2025
Addition and/or Alterations · EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES - For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. Relocate 5 existing diffusers within a single office space on the 4th floor. No penetrations of rated assemblies.
- Issued Nov 19, 2025
Addition and/or Alterations · EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the relocation of sprinkler heads as per attached standards. Deviations from these standards require submission of construction and site plans. RELOCATE 7 SPRINKLER HEADS TO ACCOMODATE NEW ARCHITECTURAL LAYOUT
- Issued Oct 30, 2025
Temporary Tents and Canopies · ASSEMBLY USE TENT - LAWFUL OCCUPANCY SHALL BE AS POSTED - REMOVAL DATE ELECTRICAL PERMIT REQUIRED, UNLESS POWER IS PROVIDED THROUGH EXISTING EXTERIOR GROUND FAULT PROTECTED RECEPTACLES AND POWER CORDS ARE RATED EXTRA HEAVY DUTY WITH U. L. LABEL STATING SUCH RATING. NO COOKING OR HEATING PERMITTED WITH THIS APPROVAL. IF TENT IS NOT READY FOR INSPECTION TO INCLUDE ELECTRICAL COMPONENTS, AN ADDITIONAL WILL BE APPLIED FOR ANY AFTER HOURS INSPECTION WITH POSSIBLE ISSUANCE OF CODE VIOLATION NOTICES.
- Issued Oct 9, 2025
1 units
Addition and/or Alteration · FOR A LEVEL II ALTERATIONS TO A PORTION OF THE 4TH FLOOR OF AN EXISTING STRUCTURE. ALTERATIONS TO INCLUDE THE SELECTIVE DEMOLITION OF EXISTING PARTITIONS AND ERECTION OF PARTITION WALLS, PROVIDE FINISHES/FURNISHINGS, AND ACCESSIBILITY IMPROVEMENTS THROUGHOUT. BUILDING IS FULLY SPRINKLERED. **ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN PROFESSIONAL PRIOR TO THE START OF ANY WORK. **SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK.**
- Issued Aug 27, 2025
Addition and/or Alteration · Horizontal CAT6 Cabling – Furnish labor for the following: - 6 each Single (1x Cat6 per) wall mounted EOs. - 1 each Single (1x Cat6 per) furniture-mounted EOs (floor poke-through pathway feeder devices provided By Others – BO). - 5 each Dual (2x Cat6 per) wall mounted EOs. - 4 each Dual (2x Cat6 per) furniture-mounted EOs (floor poke-through pathway feeder devices provided By Others – BO). - 1 each Triplex (3x Cat6 per) EOs mounted at ceilings. - 4 each Single Wireless Access Point (1x Cat
- Issued Aug 1, 2025
Addition and/or Alteration · INSTALL DEDICATED BRANCH CIRCUITS FOR THE COPIERS, 2 CARD READERS FOR THE DOORS AND PULL STRINGS FOR DATA AT NEW DESK ROOM. ALL WORK TO BE DONE ACCORDING TO THE 2017 NEC AND PER PLANS.
- Issued Jul 22, 2025
Alterations · WATER, WASTE & VENT PIPING & Install pantry sink basin, faucet, supplies, and trap under sink.
Track this owner
We'll flag their next deal, permit, or filing — usually before the neighbors know.
Entities are grouped by a normalized name from the public record; a separate legal entity per building is common, so some portfolios span several related names. Sources: Phila. Dept. of Records (deeds), L&I (permits & violations), Dept. of Revenue (tax delinquencies), reflecting the record as of our last weekly ingest. Verify independently before relying on it.
Last generated August 1, 2026.