- Issued May 27, 2026
Addition and/or Alterations · EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the relocation of sprinkler heads as per attached standards. Deviations from these standards require submission of construction and site plans. Relocate 16 existing heads to match new layout
- Issued Apr 16, 2026
Addition and/or Alterations · FOR THE RELOCATION OF EXISTING DIFFUSERS/ REGISTERS PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS REQUIRED FOR ALL OTHER WORK.
- Issued Apr 13, 2026
Addition and/or Alteration · Furnish and install 24 Category 6A cables from GCB-3 Rack to Server Room. Furnish and install 18 strands of fiber from GCB-3 Rack to Server Room. Furnish and install 36 OS2 LC Connectors. Furnish and install 12 SDI cables from GCb-3 Rack to Server Room. Furnish and install all necessary fiber enclosures and connectors. Furnish and install all necessary copper, and BNC patch panels and connectors.
- Issued Apr 10, 2026
Addition and/or Alteration · Install (1) fire alarm device per drawings as per 2016 NFPA 72.
- Issued Apr 7, 2026
Addition and/or Alterations · FOR THE INSTALLATION OF ONE (1) FAN COIL UNIT AND ASSOCIATED DUCTWORK AND PIPING AS PER APPROVED PLANS AND IN ACCORDANCE WITH 2018 IMC. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK. SEE CP-2026-000967 FOR ASSOCIATED BUILDING PERMIT.
- Issued Mar 31, 2026
Addition and/or Alteration · Furnish and install 15 duplex receptacles, 2 GFCI's, two quads. Furnish and install 48 lights and lighting controls, Furnish and install fire alarm .ALL WORK IS TO BE DONE ACCORDING TO APPROVED DRAWINGS-2017 NEC,2016 NFPA-72.
- Issued Mar 20, 2026
Addition and/or Alteration · Install receptacles, telecommunication wiring, and provide power to equipment as per 2017 NEC. ***NOT APPROVED FOR THE INSTALLATION OF FIRE ALARM***
- Issued Mar 17, 2026
Addition and/or Alterations · EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the relocation of sprinkler heads as per attached standards. Deviations from these standards require submission of construction and site plans. RELOCATE (8) SPRNKLER HEADS ON THE 4TH FLOOR AS PER NFPA
- Issued Mar 12, 2026
1 units
Addition and/or Alteration · FOR LEVEL II ALTERATIONS TO INCLUDE NEW PARTITIONS, FIXTURES, FURNISHINGS, FINISHES AS PER APPROVED PLANS. SEPARATE PERMITS REQUIRED FOR ANY MEP AND FIRE SUPRRESSION WORK. *2018 IEBC*
- Issued Feb 25, 2026
1 units
Addition and/or Alteration · FOR LEVEL II ALTERATIONS TO 4TH FLOOR IN AN EXISTING STRUCTURE. ALTERATIONS TO INCLUDE PARTIAL DEMOLITION AND THE ERECTION OF PARTITION WALLS, PROVIDE FINISHES/FURNISHINGS AND ACCESSIBILITY IMPROVEMENTS THROUGHOUT. FOR USE AS PREVIOUSLY APPROVED. ALL WORK TO BE DONE PER APPROVED PLANS. ***************** SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK. ******************************************
- Issued Dec 12, 2025
Addition and/or Alterations · EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the relocation of sprinkler heads as per attached standards. Deviations from these standards require submission of construction and site plans. Relocate 11 existing sprinkler heads to accommodate renovations of 4th floor office space
- Issued Nov 11, 2025
Addition and/or Alteration · Repair existing lighting installation of new lighting and controls, wiring of the office area according to plans. Installation of fire alarm as per drawings In accordance with NFPA72 2016 & The Philadelphia Fire Code 2018
- Issued Nov 6, 2025
Addition and/or Alterations · FOR THE INSTALLATION OF HVAC EQUIPMENT, DUCTWORK AND REGISTERS/DIFFUSERS PER APPROVED PLANS.
- Issued Oct 3, 2025
Alterations · INSTALLATION OF 2 NEW RESTROOMS IN EXISTING OFFFICE SPACE. INSTALLATION OF 6 NEW FIXTURES AS LISTED IN COMPLIANCE WITH PPC AND EZ STANDARD.
- Issued Sep 23, 2025
1 units
Addition and/or Alteration · FOR A LEVEL II INTERIOR ALTERATIONS FOR RENOVATIONS TO A PORTION OF THE FOURTH FLOOR OFFICE SPACE IN A EXITING STRUCTURE. WORK TO BE COMPLETED AS PER APPROVED PLANS. ** EXISTING BUILDING IS FULLY SPRINKLERED. **2018 IEBC REVIEW** **SEPARATE PERMITS REQUIRED FOR ANY MEP OR FIRE SUPPRESSION WORK**
- Issued Sep 16, 2025
1 units
Addition and/or Alteration · FOR LEVEL II ALTERATIONS TO SUITE 0510 IN AN EXISTING STRUCTURE. ALTERATIONS TO INCLUDE THE ERECTION OF PARTITION WALLS, PROVIDE FINISHES/FURNISHINGS AND ACCESSIBILITY IMPROVEMENTS THROUGHOUT. FOR USE AS PREVIOUSLY APPROVED. ALL WORK TO BE DONE PER APPROVED PLANS. ***************** SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK. ******************************************
- Issued Aug 8, 2025
Addition and/or Alteration · INSTALL WIRING, LIGHTING, LIGHTING CONTROLS, EXIT SIGNS, EMERGENCY LIGHTS AND RECEPTACLE OUTLETS. INSTALL FIRE ALARM SYSTEM. ALL WORK TO BE DONE ACCORDING TO THE 2017 NEC, 2016 NFPA 72 AND PER PLANS.
- Issued Aug 6, 2025
Sign · FOR THE INSTALLATION OF THREE (3) ACCESSORY, NON-ILLUMINATED WALL SIGNS.
- Issued Aug 4, 2025
Alterations · INTERIOR ALTERATIONS TO OFFICE SPACE IN COMPLIANCE WITH EZ PLUMBING STANDARD FOR COMMERCIAL. ONLY 6 FIXTURES PROPOSED. ALL WORK TO BE PERFORMED IN STRICT COMPLIANCE WITH 2018 PPC.
- Issued Aug 4, 2025
Addition and/or Alterations · Furnish and install 8 Coil Units, duct, air devices, Chiller and pump as per approved plans.
- Issued Jul 24, 2025
Addition and/or Alteration · Furnish and install plenum OS2 from Server room to multiple racks on the gaming floor. Average cable pull is 175 feet Furnish and install seventy-four (74) plenum Category 6A cables from the Server Room to various camera and wireless locations on the gaming floor. Average cable pull is 175 feet Furnish and install two-hundred-sixteen (216) plenum Category 6A cables from various racks on gaming floor to below raised floor. Average cable pull is 50 feet
- Issued Jul 21, 2025
Addition and/or Alterations · EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the Relocation of Sprinkler Heads as per attached standards. Deviations from these standards require submission of construction and site plans. ( CP-2025-003282 ) RELOCATE (61) SPRINKLER HEADS AS PER NFPA 13 (4th floor, suite 402)
Violations
5 entries
- Violation May 21, 2026OPEN
FOOD - SMALL ESTABLISHMENT LICENSE
- Violation May 21, 2026OPEN
CAL LICENSE OBTAIN
- Violation May 12, 2025OPEN
HIGH-RISE BUILDING
- Violation May 12, 2025OPEN
FIRE EVACUATION PLANS
- Violation May 12, 2025OPEN
PERIODIC TESTING
Track this owner
We'll flag their next deal, permit, or filing — usually before the neighbors know.
Entities are grouped by a normalized name from the public record; a separate legal entity per building is common, so some portfolios span several related names. Sources: Phila. Dept. of Records (deeds), L&I (permits & violations), Dept. of Revenue (tax delinquencies), reflecting the record as of our last weekly ingest. Verify independently before relying on it.
Last generated July 15, 2026.