The Philadelphia Index

Entity File · The Public Record

Company / LLC

200 West Washington Square LLC

18 permits · 9 violations

Records on file
27

Permits (as owner)

18 entries

  1. Issued Jul 7, 2026

    200 W Washington Sq

    Shelter/Platform · SHELTER PLATFORM PERMIT- Erection of sidewalk shelter platform 100 l.f. on Walnut St. with the deck at 300 P.S.I. each as per Engineered Plans. Streets Department permit is required for sidewalk closure prior to the start work. SR-2026-034855

  2. Issued May 26, 2026

    200 W Washington Sq

    Addition and/or Alterations · FOR THE REPLACEMENT OF EXISTING APPLIANCES. APPLIANCES TO BE INSTALLED IN ACCORDANCE WITH MANUFACTURER'S SPECIFICATIONS. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS REQUIRED FOR ALL OTHER WORK.

  3. Issued Apr 1, 2026

    200 W Washington Sq

    Addition and/or Alteration · Furnish and install fire alarm notification appliances, including horns and strobes, within the doctor’s office. Work includes all required wiring, device mounting, terminations, and connections to the existing or new fire alarm system. All devices shall be properly interconnected, tested, and coordinated to provide required occupant notification. All work shall be performed in accordance with 2016 NFPA 72, the 2017 NEC and per approved plans.

  4. Issued Mar 24, 2026

    200 W Washington Sq

    Rough-In · Rough-In Permit for EP-2026-002434 Dr's office located in mixed use office building. Install Horn/ Strobes per drawings.

  5. Issued Mar 2, 2026

    200 W Washington Sq

    Addition and/or Alteration · Rewire the doctor’s office suite, including exam rooms and lounge area. Work includes installation of new branch circuit wiring, lighting fixtures, switches, receptacles, and associated devices as required to serve the space. Provide proper grounding, bonding, terminations, and panel connections. All work shall be performed in accordance with the 2017 NEC and approved plans.

  6. Issued Feb 27, 2026

    200 W Washington Sq

    Addition and/or Alterations · EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the relocation of sprinkler heads as per attached standards. Deviations from these standards require submission of construction and site plans. Relocate 15 sprinkler heads

  7. Issued Feb 24, 2026

    200 W Washington Sq

    Addition and/or Alterations · FOR INSTALLATION OF HVAC EQUIPMENT, DUCTWORK AND REGISTERS/DIFFUSERS PER APPROVED PLANS.

  8. Issued Feb 24, 2026

    200 W Washington Sq

    Rough-In · Rough-In Permit for EP-2026-001475

  9. Issued Feb 18, 2026

    200 W Washington Sq

    Alterations · Furnish and install new domestic hot/ cold, sanitary piping for (2) sinks. also (1) drinking fountain.

  10. Issued Feb 12, 2026

    200 W Washington Sq

    Addition and/or Alteration · Install a new automatic and manual fire alarm system serving the doctor’s offices, exam rooms, and office lounge areas, including all required devices, wiring, notification appliances. All work to be done in accordance with 2016 NFPA 72 and per approved plans.

  11. Issued Feb 10, 2026

    200 W Washington Sq

    Addition and/or Alterations · FOR THE INSTALLATION OF HVAC APPLIANCES, EQUIPMENT, DUCTWORK AND REGISTERS/DIFFUSERS PER APPROVED PLANS AND MANUFACTURER'S SPECIFICATIONS. *2018 IMC REVIEW*

  12. Issued Feb 5, 2026

    200 W Washington Sq

    Rough-In · Rough-In Permit for EP-2026-000959 Add speakers and strobe to existing FACP

  13. Issued Feb 4, 2026

    1 units

    200 W Washington Sq

    Addition and/or Alteration · FOR LEVEL II INTERIOR ALTERATIONS TO AN EXISTING TENANT SPACE ON THE 2ND FLOOR FOR USE AS A BUSINESS OCCUPANCY, ALTERATIONS TO INCLUDE THE ERECTION OF PARTITION WALLS, PROVIDE FINISHES/ FURNISHINGS AND ACCESSIBILITY IMPROVMENTS THROUGHOUT. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK.

  14. Issued Feb 2, 2026

    200 W Washington Sq

    Addition and/or Alterations · EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the relocation of sprinkler heads as per attached standards. Deviations from these standards require submission of construction and site plans. Relocate 8 sprinkler heads on the first floor to accommodate new layout

  15. Issued Jan 28, 2026

    200 W Washington Sq

    Alterations · AMEND PERMIT 1/30/2026 TO CORRECT ADDRESS. Furnish an install (2) new sinks. and (1) drinking fountain

  16. Issued Jan 26, 2026

    200 W Washington Sq

    Addition and/or Alteration · Replace light fixtures with new LED's and low voltage controls and add receptacles in select offices. Circuits are to be re-used or shall originate from existing panel boards. Install raceway and back boxes for low voltage tele/data and security wiring as per 2017 NEC.***NOT APPROVED FOR THE INSTALLATION OF FIRE ALARM***

  17. Issued Jan 13, 2026

    200 W Washington Sq

    Rough-In · Rough-In Permit for EP-2026-000232 Replace light fixtures with new LED's and low voltage controls and add receptacles in select offices. Circuits are to be re-used or shall originate from existing panel boards. Install raceway and back boxes for low voltage tele/data and security wiring. Total cost of contract is $98,954.36- this electrical portion of work is $78,204.36, fire alarm portion of work is $20,750. We will be applying for the fire alarm permit at a later date.

  18. Issued Jan 8, 2026

    1 units

    200 W Washington Sq

    Addition and/or Alteration · FOR LEVEL II ALTERATIONS TO AN EXISTING TENANT SPACE FOR USE AS A BUSINESS OCCUPANCY, ALTERATIONS TO INCLUDE THE ERECTION OF PARTITION WALLS, PROVIDE FINISHES/ FURNISHINGS AND ACCESSIBILITY IMPROVMENTS THROUGHOUT. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK.

Violations

9 entries

  1. Violation May 15, 2026OPEN

    200 W Washington Sq

    DAMPER CERTIFICATION REPORT

  2. Violation May 15, 2026OPEN

    200 W Washington Sq

    SMOKE CONTROL SYSTEM RECORDS

  3. Violation May 15, 2026OPEN

    200 W Washington Sq

    UTILITY IDENTIFICATION

  4. Violation May 15, 2026OPEN

    200 W Washington Sq

    EQUIPMENT ROOMS

  5. Violation May 15, 2026OPEN

    200 W Washington Sq

    UNAPPROVED CONDITIONS

  6. Violation May 15, 2026OPEN

    200 W Washington Sq

    PENETRATIONS MAINTAINING PROTECTION

  7. Violation May 15, 2026OPEN

    200 W Washington Sq

    OBSTRUCTIONS

  8. Violation May 15, 2026OPEN

    200 W Washington Sq

    GENERAL ILLUMINATION

  9. Violation May 15, 2026OPEN

    200 W Washington Sq

    INSPECTION, TESTING & MAINTENANCE

Track this owner

We'll flag their next deal, permit, or filing — usually before the neighbors know.

Entities are grouped by a normalized name from the public record; a separate legal entity per building is common, so some portfolios span several related names. Sources: Phila. Dept. of Records (deeds), L&I (permits & violations), Dept. of Revenue (tax delinquencies), reflecting the record as of our last weekly ingest. Verify independently before relying on it.
Last generated July 16, 2026.