Entity File · The Public Record
Company / LLC
2000 Market LLC
1 property · $45.5M acquired · 33 permits · 4 violations
- Records on file
- 38
- Acquired
- $45.5M
Acquired
1 entry
Permits (as owner)
33 entries
- Issued Aug 27, 2026
Addition and/or Alterations · FOR THE INSTALLATION OF VAV BOXES, GRDs, AND ASSOCIATED DUCTWORK AS PER APPROVED PLANS AND IN ACCORDANCE WITH 2021 IMC. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK. SEE CP-2026-003712 FOR ASSOCIATED BUILDING PERMIT.
- Issued Aug 27, 2026
Addition and/or Alteration · Furnish and install 44 duplex, 17 quad, 3 GFI's, 3 floor cores, 1 hot water heater, 20 rings and strings. 77 2x2, 9 downlights, 5 wall washers, 3 pendants, 4 sconces and 2 exits as per 2017 NEC. Fire Alarm to be on separate permit.
- Issued Aug 18, 2026
Addition and/or Alteration · Install 87 light fixture, 5 exit, 2 switch, 7 receptacle as per 2017 NEC. Fire Alarm: Install 8 speaker/strobe, 9 smoke detector, 3 pull station, 1 NAC panel as per 2016 NFPA 72.
- Issued Aug 18, 2026
Addition and/or Alteration · Fire Alarm: Install 8 speaker/strobe, 1 strobe, 1 smoke detector, 1 relay 1 NAC Panel. PER APPROVED DRAWINGS-2017 NEC,2016 NFPA-72.
- Issued Aug 17, 2026
1 units
Addition and/or Alteration · FOR A LEVEL II INTERIOR ALTERATIONS (NO CHANGE IN OCCUPANCY ) TO A PORTION OF AN EXISTING STRUCTURE. ALL WORK TO BE DONE PER APPROVED PLANS.** IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK**IEBC 2021**EXISTING BUILDING FULLY SPRINKLERED** SEPARATE PERMITS REQUIRED FOR ALL OTHER WORK**
- Issued Aug 13, 2026
Addition and/or Alteration · Provide an interior electrical fit-out for a commercial office tenant space. Install fifty-six (56) light fixtures, three (3) exit signs, five (5) switches, ten (10) receptacle outlets, two (2) floor receptacles, and three (3) furniture power connections. Relocate eight (8) existing switches. All work to be perform according to the 2017 NEC and per approved plans.
- Issued Aug 12, 2026
Addition and/or Alteration · Install 385 light fixture, 24 exit, 133 switch, 197 receptacle, 25 furniture power, 12 floor receptacle, 12 equipment power, bus switch, 480/277 volt panel, 30 KVA transformer, 208/120 volt panel, meter. Fire Alarm: Install 56 speaker/strobe, 2 smoke detector, 6 relay, 2 NAC panel. ALL WORK IS TO BE DONE ACCORDING TO APPROVED DRAWINGS-2017 NEC,2016 NFPA-72
- Issued Aug 7, 2026
Addition and/or Alteration · Install telecommunication wiring for the work station in the Service Room. All work to be perform according to the 2020 NEC and per executed contract.
- Issued Jul 29, 2026
Addition and/or Alterations · EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the relocation of sprinkler heads as per attached standards. Deviations from these standards require submission of construction and site plans. RELOCATE (37) SPRINKLER HEADS, PER NFPA 13
- Issued Jul 29, 2026
Alterations · - Approved plumbing work associated with an (Addition or Alteration) per attached EZ Permit Standard for Plumbing
- Issued Jul 28, 2026
Alterations · - Approved plumbing work associated with an (Addition or Alteration) per attached EZ Permit Standard for Plumbing.
- Issued Jul 27, 2026
Addition and/or Alterations · FOR THE PARTIAL DEMOLITION AND INSTALLATION OF REGISTERS, DIFFUSERS, WITH ASSOCIATED DUCTWORK TO BE INSTALLED IN ACCORDANCE WITH THE MANUFACTURER’S SPECIFICATIONS. FOR USE AS PREVIOUSLY APPROVED. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK.
- Issued Jul 27, 2026
Addition and/or Alterations · FOR THE PARTIAL DEMOLITION AND INSTALLATION OF REGISTERS, DIFFUSERS, WITH ASSOCIATED DUCTWORK TO BE INSTALLED IN ACCORDANCE WITH THE MANUFACTURER’S SPECIFICATIONS. FOR USE AS PREVIOUSLY APPROVED. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK.
- Issued Jul 23, 2026
Addition and/or Alterations · FOR INSTALLATION OF HVAC APPLICANCE, EQUIPMENT, DUCTWORK AND REGISTERS/DIFFUSERS PER APPROVED PLANS AND MANUFACTURER'S SPECIFICATIONS.
- Issued Jul 23, 2026
Addition and/or Alterations · EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the relocation of sprinkler heads as per attached standards. Deviations from these standards require submission of construction and site plans. RELOCATE (10) SPRINKLER HEADS, PER NFPA 13
- Issued Jul 20, 2026
Addition and/or Alterations · EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES - For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. ALL WORK TO BE SELF-CONTAINED WITHIN ONE DWELLING UNIT. NO PENETRATIONS OF RATED ASSEMBLIES. Relocate (7) diffusers
- Issued Jul 6, 2026
1 units
Addition and/or Alteration · FOR LEVEL II ALTERATIONS TO AN EXISTING STRUCTURE ON 18 TH FLOOR. ALTERATIONS TO INCLUDE PARTIAL DEMOLITION AND THE ERECTION OF PARTITION WALLS, PROVIDE FINISHES/FURNISHINGS AND ACCESSIBILITY IMPROVEMENTS THROUGHOUT. FOR USE AS PREVIOUSLY APPROVED. ALL WORK TO BE DONE PER APPROVED PLANS. ***************** SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK. ******************************************
- Issued Jun 29, 2026
1 units
Addition and/or Alteration · FOR LEVEL II ALTERATIONS TO AN EXISTING STRUCTURE ON 28TH FLOOR. ALTERATIONS TO INCLUDE PARTIAL DEMOLITION AND THE ERECTION OF PARTITION WALLS, PROVIDE FINISHES/FURNISHINGS AND ACCESSIBILITY IMPROVEMENTS THROUGHOUT. FOR USE AS PREVIOUSLY APPROVED. ALL WORK TO BE DONE PER APPROVED PLANS. ***************** SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK. ******************************************
- Issued Jun 23, 2026
Addition and/or Alterations · EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the relocation of sprinkler heads as per attached standards. Deviations from these standards require submission of construction and site plans. RELOCATE (133) SPRINKLER HEADS, PER NFPA 13
- Issued Jun 23, 2026
Addition and/or Alterations · EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the relocation of sprinkler heads as per attached standards. Deviations from these standards require submission of construction and site plans. RELOCATE (18) SPRINKLER HEADS ON THE 5TH FLOOR, PER NFPA 13
- Issued Jun 18, 2026
Alterations · Remove and replace (15) plumbing fixtures, (6) lavatories, (7) water closets and (2) urinals, connecting to existing piping. *WITHOUT PIPING*
- Issued Jun 18, 2026
Alterations · Furnish and install (9) plumbing fixtures, (6) kitchen sinks and (3) hot water heaters, connecting to existing piping. *WITHOUT PIPING*
- Issued Jun 16, 2026
1 units
Addition and/or Alteration · FOR A LEVEL II INTERIOR ALTERATIONS TO THE 5TH FLOOR SPACE OF AN EXISTING STRUCTURE. ALTERATIONS TO INCLUDE PARTIAL DEMOLITION, COMMON SPACE UPGRADES INCLUDE ELEVATOR LOBBY, COMMON CORRIDOR, AND REMODELING OF RESTROOMS AND THE ERECTION OF PARTITION WALLS, PROVIDE FINISHES/FURNISHINGS THROUGHOUT. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN PROFESSIONAL PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK.
- Issued Jun 16, 2026
1 units
Addition and/or Alteration · FOR A LEVEL II INTERIOR ALTERATIONS TO THE 5TH AND 9TH FLOORS OF AN EXISTING STRUCTURE. ALTERATIONS TO INCLUDE PARTIAL DEMOLITION AND THE ERECTION OF PARTITION WALLS, PROVIDE FINISHES/FURNISHINGS THROUGHOUT. FOR USE AS PREVIOUSLY APPROVED. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN PROFESSIONAL PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK.
- Issued Apr 16, 2026
Alterations · Remove and replace fixtures to include 7-w/c, 6-Lavatories and 2-urinals. **WITHOUT PIPING**
- Issued Apr 15, 2026
Addition and/or Alteration · Perform alterations to the elevator lobby, corridors, and restroom areas. Work includes installation and/or modification of electrical wiring, lighting fixtures, lighting control systems, exit signs, and emergency lighting. Furnish and install fire alarm devices, including all required wiring, terminations, and connections to the existing fire alarm system. All work shall be performed in accordance with the 2017 NEC, 2016 NFPA 72 and per approved plans.
- Issued Mar 31, 2026
Addition and/or Alterations · FOR THE INSTALLATION OF REGISTERS, DIFFUSERS, AND APPLIANCES WITH ASSOCIATED DUCTWORK. APPLIANCES TO BE INSTALLED IN ACCORDANCE WITH MANUFACTURER'S SPECIFICATIONS. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS REQUIRED FOR ALL OTHER WORK.
- Issued Mar 24, 2026
Addition and/or Alterations · EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the relocation of sprinkler heads as per attached standards. Deviations from these standards require submission of construction and site plans. RELOCATE 20 SPRINKLER HEADS, PER NFPA 13
- Issued Mar 19, 2026
1 units
Addition and/or Alteration · FOR A LEVEL II INTERIOR ALTERATIONS TO THE 18TH FLOOR SPACE OF AN EXISTING STRUCTURE. ALTERATIONS TO INCLUDE PARTIAL DEMOLITION REMODELING OF RESTROOMS AND THE ERECTION OF PARTITION WALLS, PROVIDE FINISHES/FURNISHINGS THROUGHOUT. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN PROFESSIONAL PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK. 04/22/26 AMENDMENT: Amended Layout changes to the common corridor. The extent and length of c
- Issued Sep 5, 2025
Addition and/or Alteration · Modify existing fire alarm system as per 2016 NFPA 72. Provide new devices. Relocate and demo existing devices as show on drawings. All new wiring shall be Class B.
- Issued Jul 28, 2025
Addition and/or Alteration · Install receptacles, AV Boxes & box eliminators with pull strings . ALL WORK IS TO BE DONE ACCORDING TO APPROVED DRAWINGS-2017 NEC.
- Issued Jul 17, 2025
Addition and/or Alteration · Installation of (24) Cat-6 cables in accordance with NEC. Test and label existing cabling.
- Issued Jul 10, 2025
Addition and/or Alterations · EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES - For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. Furnish labor to relocate 9 existing diffusers, with no wall penetrations, within a single tenant space. NO PENETRATIONS OF RATED ASSEMBLIES.
Violations
4 entries
- Violation Jun 26, 2026OPEN
PERIODIC TESTING
- Violation Jun 26, 2026OPEN
INSPECTION, TESTING & MAINTENANCE
- Violation Jun 26, 2026OPEN
SUPPRESSION SYSTEM TESTING & MAINTENANCE
- Violation Nov 4, 2025OPEN
DAMPER CERTIFICATION REPORT
Track this owner
We'll flag their next deal, permit, or filing — usually before the neighbors know.
Entities are grouped by a normalized name from the public record; a separate legal entity per building is common, so some portfolios span several related names. Sources: Phila. Dept. of Records (deeds), L&I (permits & violations), Dept. of Revenue (tax delinquencies), reflecting the record as of our last weekly ingest. Verify independently before relying on it.
Last generated September 16, 2026.