THE INDEX: 161 ▲53 · week of Oct 26 — permits steady, openings soft, deal ledger running hot

The Philadelphia Index

Entity File · The Public Record

Company / LLC

30 Rittenhouse LLC

28 permits · 74 violations

Records on file
102

Permits (as owner)

28 entries

  1. Issued Jun 24, 2026

    30 E Rittenhouse St

    New Construction · FOR THE INSTALLATION OF A NEW FIRE SUPPRESSION SYSTEM AND 1” COMBINED SERVICE IN ACCORDANCE WITH NFPA 13D THROUGHOUT THE ENTIRE BUILDING. ALL WORK SHALL COMPLY WITH THE APPROVED PLANS. ALL WORK SHALL BE PERFORMED BY A FIRE SUPPRESSION CONTRACTOR LICENSED BY THE CITY OF PHILADELPHIA.

  2. Issued Sep 15, 2025

    30 E Rittenhouse St

    New Construction or Additions · INSTALL SANITARY & STORM CT, FAI, MD & 1" WDP. Install drains, vent & water lines to 10 fixtures to include 2 toilets, 2 lavs, 2 tubs, 1 kitchen sink, 1 laundry sink, 1 hot water heater & 1 hose bib.

  3. Issued Sep 15, 2025

    30 E Rittenhouse St

    New Construction or Additions · Install vents, drains, water lines, 2 toilets, 2 lavs, 2 tubs, 1 kitchen sink, 1 laundry sink, 1 hot water heater, 1 hose bib, 1 house drain, 1 fresh air inlet, 1 house trap, and a 1" water line

  4. Issued Sep 15, 2025

    30 E Rittenhouse St

    New Construction or Additions · Install vents, drains, water lines, 2 toilets, 2 lavs, 2 tubs, 1 kitchen sink, 1 laundry sink, 1 hot water heater, 1 hose bib, 1 house drain, 1 fresh air inlet, 1 house trap, and a 1" water line

  5. Issued Sep 15, 2025

    30 E Rittenhouse St

    New Construction or Additions · INSTALL SANITARY & STORM CT, FAI, MD & 1" WDP. Install drains, vent & water lines to 10 fixtures to include 2 toilets, 2 lavs, 2 tubs, 1 kitchen sink, 1 laundry sink, 1 hot water heater & 1 hose bib.

  6. Issued Sep 15, 2025

    30 E Rittenhouse St

    New Construction or Additions · INSTALL SANITARY & STORM CT, FAI, MD & 1" WDP. Install drains, vent & water lines to 10 fixtures to include 2 toilets, 2 lavs, 2 tubs, 1 kitchen sink, 1 laundry sink, 1 hot water heater & 1 hose bib.

  7. Issued Sep 15, 2025

    30 E Rittenhouse St

    New Construction or Additions · Install vents, drains, water lines, 2 toilets, 2 lavs, 2 tubs, 1 kitchen sink, 1 laundry sink, 1 hot water heater, 1 hose bib, 1 house drain, 1 fresh air inlet, 1 house trap, and a 1" water line

  8. Issued Sep 15, 2025

    30 E Rittenhouse St

    New Construction or Additions · INSTALL SANITARY & STORM CT, FAI, MD & 1" WDP. Install drains, vent & water lines to 10 fixtures to include 2 toilets, 2 lavs, 2 tubs, 1 kitchen sink, 1 laundry sink, 1 hot water heater & 1 hose bib.

  9. Issued Sep 15, 2025

    30 E Rittenhouse St

    New Construction or Additions · Install vents, drains, water lines, 2 toilets, 2 lavs, 2 tubs, 1 kitchen sink, 1 laundry sink, 1 hot water heater, 1 hose bib, 1 house drain, 1 fresh air inlet, 1 house trap, and a 1" water line

  10. Issued Aug 6, 2025

    30 E Rittenhouse St

    New Construction · Install 200a, 1ph, 120/240v main service. Install all new wiring throughout new construction SFD. Install all the lighting throughout. Install 120v smokes detectors throughout. Install cable tv wiring

  11. Issued Aug 6, 2025

    30 E Rittenhouse St

    New Construction · Install 200a, 1ph, 120/240v main service. Install all new wiring throughout new construction SFD. Install all the lighting throughout. Install 120v smokes detectors throughout. Install cable tv wiring

  12. Issued Aug 6, 2025

    30 E Rittenhouse St

    New Construction · Install 200a, 1ph, 120/240v main service. Install all new wiring throughout new construction SFD. Install all the lighting throughout. Install 120v smokes detectors throughout. Install cable tv wiring

  13. Issued Aug 6, 2025

    30 E Rittenhouse St

    New Construction · Install 200a, 1ph, 120/240v main service. Install all new wiring throughout new construction SFD. Install all the lighting throughout. Install 120v smokes detectors throughout. Install cable tv wiring

  14. Issued Aug 6, 2025

    30 E Rittenhouse St

    New Construction · Install 200a, 1ph, 120/240v main service. Install all new wiring throughout new construction SFD. Install all the lighting throughout. Install 120v smokes detectors throughout. Install cable tv wiring

  15. Issued Aug 6, 2025

    30 E Rittenhouse St

    New Construction · Install 200a, 1ph, 120/240v main service. Install all new wiring throughout new construction SFD. Install all the lighting throughout. Install 120v smokes detectors throughout. Install cable tv wiring

  16. Issued Aug 6, 2025

    30 E Rittenhouse St

    New Construction · Install 200a, 1ph, 120/240v main service. Install all new wiring throughout new construction SFD. Install all lighting throughout. Install 120v smokes detectors throughout. Install cable tv wiring

  17. Issued Aug 6, 2025

    30 E Rittenhouse St

    New Construction · Install 200a, 1ph, 120/240v main service. Install all new wiring throughout new construction SFD. Install all the lighting throughout. Install 120v smokes detectors throughout. Install cable tv wiring

  18. Issued Aug 6, 2025

    30 E Rittenhouse St

    New Construction · Install 200a, 1ph, 120/240v main service. Install all new wiring throughout new construction SFD. Install all the lighting throughout. Install 120v smokes detectors throughout. Install cable tv wiring

  19. Issued Aug 1, 2025

    30 E Rittenhouse St

    New Construction · ERECTION OF AN ATTACHED STRUCTURE FOR USE AS SINGLE FAMILY HOUSEHOLD LIVING. SHEETING AND SHORING AS PRESCRIBED IN GEO TECH REPORT. SEPARATE PERMITS REQUIRED FOR SPRINKLER (13D) WORK. (UNDERPINNNING IS NOT PART OF THIS PERMIT, DEPTH TO BOTTOM OF FOOTING MINIMUM 8'). ENERGY CODE COMPLIANCE IN ACCORDANCE WITH 2015 IECC. PRIOR TO ISSUANCE OF C.O SUBMITTAL OF AIR BARRIER CHECKLIST AND ENVELOPE TESTING CERTIFICATE IS REQUIRED. BOTH TO BE COMPLETED BY AN APPROVED PARTY.

  20. Issued Aug 1, 2025

    30 E Rittenhouse St

    New Construction · ERECTION OF AN ATTACHED STRUCTURE FOR USE AS SINGLE FAMILY HOUSEHOLD LIVING. SHEETING AND SHORING AS PRESCRIBED IN GEO TECH REPORT. SEPARATE PERMITS REQUIRED FOR SPRINKLER (13D) WORK. (UNDERPINNNING IS NOT PART OF THIS PERMIT, DEPTH TO BOTTOM OF FOOTING MINIMUM 8'). ENERGY CODE COMPLIANCE IN ACCORDANCE WITH 2015 IECC. PRIOR TO ISSUANCE OF C.O SUBMITTAL OF AIR BARRIER CHECKLIST AND ENVELOPE TESTING CERTIFICATE IS REQUIRED. BOTH TO BE COMPLETED BY AN APPROVED PARTY.

  21. Issued Aug 1, 2025

    30 E Rittenhouse St

    New Construction · ERECTION OF AN ATTACHED STRUCTURE FOR USE AS SINGLE FAMILY HOUSEHOLD LIVING. SHEETING AND SHORING AS PRESCRIBED IN GEO TECH REPORT. SEPARATE PERMITS REQUIRED FOR SPRINKLER (13D) WORK. (UNDERPINNNING IS NOT PART OF THIS PERMIT, DEPTH TO BOTTOM OF FOOTING MINIMUM 8'). ENERGY CODE COMPLIANCE IN ACCORDANCE WITH 2015 IECC. PRIOR TO ISSUANCE OF C.O SUBMITTAL OF AIR BARRIER CHECKLIST AND ENVELOPE TESTING CERTIFICATE IS REQUIRED. BOTH TO BE COMPLETED BY AN APPROVED PARTY.

  22. Issued Aug 1, 2025

    30 E Rittenhouse St

    New Construction · ERECTION OF AN ATTACHED STRUCTURE FOR USE AS SINGLE FAMILY HOUSEHOLD LIVING. SHEETING AND SHORING AS PRESCRIBED IN GEO TECH REPORT. SEPARATE PERMITS REQUIRED FOR SPRINKLER (13D) WORK. (UNDERPINNNING IS NOT PART OF THIS PERMIT, DEPTH TO BOTTOM OF FOOTING MINIMUM 8'). ENERGY CODE COMPLIANCE IN ACCORDANCE WITH 2015 IECC. PRIOR TO ISSUANCE OF C.O SUBMITTAL OF AIR BARRIER CHECKLIST AND ENVELOPE TESTING CERTIFICATE IS REQUIRED. BOTH TO BE COMPLETED BY AN APPROVED PARTY.

  23. Issued Aug 1, 2025

    30 E Rittenhouse St

    New Construction · ERECTION OF AN ATTACHED STRUCTURE FOR USE AS SINGLE FAMILY HOUSEHOLD LIVING. SHEETING AND SHORING AS PRESCRIBED IN GEO TECH REPORT. SEPARATE PERMITS REQUIRED FOR SPRINKLER (13D) WORK. (UNDERPINNNING IS NOT PART OF THIS PERMIT, DEPTH TO BOTTOM OF FOOTING MINIMUM 8'). ENERGY CODE COMPLIANCE IN ACCORDANCE WITH 2015 IECC. PRIOR TO ISSUANCE OF C.O SUBMITTAL OF AIR BARRIER CHECKLIST AND ENVELOPE TESTING CERTIFICATE IS REQUIRED. BOTH TO BE COMPLETED BY AN APPROVED PARTY.

  24. Issued Aug 1, 2025

    30 E Rittenhouse St

    New Construction · ERECTION OF AN ATTACHED STRUCTURE FOR USE AS SINGLE FAMILY HOUSEHOLD LIVING. SHEETING AND SHORING AS PRESCRIBED IN GEO TECH REPORT. SEPARATE PERMITS REQUIRED FOR SPRINKLER (13D) WORK. (UNDERPINNNING IS NOT PART OF THIS PERMIT, DEPTH TO BOTTOM OF FOOTING MINIMUM 8'). ENERGY CODE COMPLIANCE IN ACCORDANCE WITH 2015 IECC. PRIOR TO ISSUANCE OF C.O SUBMITTAL OF AIR BARRIER CHECKLIST AND ENVELOPE TESTING CERTIFICATE IS REQUIRED. BOTH TO BE COMPLETED BY AN APPROVED PARTY.

  25. Issued Jul 15, 2025

    30 E Rittenhouse St

    New Construction · ERECTION OF AN ATTACHED STRUCTURE FOR USE AS SINGLE FAMILY HOUSEHOLD LIVING. SHEETING AND SHORING AS PRESCRIBED IN GEO TECH REPORT. SEPARATE PERMITS REQUIRED FOR SPRINKLER (13D) WORK. (UNDERPINNNING IS NOT PART OF THIS PERMIT, DEPTH TO BOTTOM OF FOOTING MINIMUM 8'). ENERGY CODE COMPLIANCE IN ACCORDANCE WITH 2015 IECC. PRIOR TO ISSUANCE OF C.O SUBMITTAL OF AIR BARRIER CHECKLIST AND ENVELOPE TESTING CERTIFICATE IS REQUIRED. BOTH TO BE COMPLETED BY AN APPROVED PARTY.

  26. Issued Jul 15, 2025

    30 E Rittenhouse St

    New Construction or Additions · Install vents, drains, water lines, 2 toilets, 2 lavs, 2 tubs, 1 kitchen sink, 1 laundry sink, 1 hot water heater, 1 hose bib, 1 house drain, 1 fresh air inlet, 1 house trap, and a 1" water line

  27. Issued Jul 15, 2025

    30 E Rittenhouse St

    New Construction · https://form.jotform.com/202324995687165

  28. Issued Jul 15, 2025

    30 E Rittenhouse St

    New Construction · ERECTION OF AN ATTACHED STRUCTURE FOR USE AS SINGLE FAMILY HOUSEHOLD LIVING. SHEETING AND SHORING AS PRESCRIBED IN GEO TECH REPORT. SEPARATE PERMITS REQUIRED FOR SPRINKLER (13D) WORK. (UNDERPINNNING IS NOT PART OF THIS PERMIT, DEPTH TO BOTTOM OF FOOTING MINIMUM 8'). ENERGY CODE COMPLIANCE IN ACCORDANCE WITH 2015 IECC. PRIOR TO ISSUANCE OF C.O SUBMITTAL OF AIR BARRIER CHECKLIST AND ENVELOPE TESTING CERTIFICATE IS REQUIRED. BOTH TO BE COMPLETED BY AN APPROVED PARTY.

Violations

74 entries

  1. Violation Aug 19, 2026OPEN

    30 E Rittenhouse St

    NEW PLUMBING

  2. Violation Aug 19, 2026OPEN

    30 E Rittenhouse St

    INSTALL FIRE SUPPRESSION SYSTEM

  3. Violation Aug 19, 2026OPEN

    30 E Rittenhouse St

    DUCTWORK

  4. Violation Aug 19, 2026OPEN

    30 E Rittenhouse St

    NEW PLUMBING

  5. Violation Aug 19, 2026OPEN

    30 E Rittenhouse St

    FAILURE TO PROVIDE REPORTS

  6. Violation Aug 19, 2026OPEN

    30 E Rittenhouse St

    NEW STRUCTURE

  7. Violation Aug 19, 2026OPEN

    30 E Rittenhouse St

    NEW ELECTRICAL SERVICE

  8. Violation Aug 19, 2026OPEN

    30 E Rittenhouse St

    INSTALL FIRE SUPPRESSION SYSTEM

  9. Violation Aug 19, 2026OPEN

    30 E Rittenhouse St

    DUCTWORK

  10. Violation Aug 19, 2026OPEN

    30 E Rittenhouse St

    NEW PLUMBING

  11. Violation Aug 19, 2026OPEN

    30 E Rittenhouse St

    FAILURE TO PROVIDE REPORTS

  12. Violation Aug 19, 2026OPEN

    30 E Rittenhouse St

    NEW ELECTRICAL SERVICE

  13. Violation Aug 19, 2026OPEN

    30 E Rittenhouse St

    INSTALL FIRE SUPPRESSION SYSTEM

  14. Violation Aug 19, 2026OPEN

    30 E Rittenhouse St

    DUCTWORK

  15. Violation Aug 19, 2026OPEN

    30 E Rittenhouse St

    NEW PLUMBING

  16. Violation Aug 19, 2026OPEN

    30 E Rittenhouse St

    NEW STRUCTURE

  17. Violation Aug 19, 2026OPEN

    30 E Rittenhouse St

    FAILURE TO PROVIDE REPORTS

  18. Violation Aug 19, 2026OPEN

    30 E Rittenhouse St

    NEW ELECTRICAL SERVICE

  19. Violation Aug 19, 2026OPEN

    30 E Rittenhouse St

    INSTALL FIRE SUPPRESSION SYSTEM

  20. Violation Aug 19, 2026OPEN

    30 E Rittenhouse St

    NEW ELECTRICAL SERVICE

  21. Violation Aug 19, 2026OPEN

    30 E Rittenhouse St

    INSTALL FIRE SUPPRESSION SYSTEM

  22. Violation Aug 19, 2026OPEN

    30 E Rittenhouse St

    DUCTWORK

  23. Violation Aug 19, 2026OPEN

    30 E Rittenhouse St

    FAILURE TO PROVIDE REPORTS

  24. Violation Aug 19, 2026OPEN

    30 E Rittenhouse St

    NEW ELECTRICAL SERVICE

  25. Violation Aug 19, 2026OPEN

    30 E Rittenhouse St

    INSTALL FIRE SUPPRESSION SYSTEM

  26. Violation Aug 19, 2026OPEN

    30 E Rittenhouse St

    DUCTWORK

  27. Violation Aug 19, 2026OPEN

    30 E Rittenhouse St

    NEW PLUMBING

  28. Violation Aug 19, 2026OPEN

    30 E Rittenhouse St

    FAILURE TO PROVIDE REPORTS

  29. Violation Aug 19, 2026OPEN

    30 E Rittenhouse St

    NEW STRUCTURE

  30. Violation Aug 19, 2026OPEN

    30 E Rittenhouse St

    DUCTWORK

  31. Violation Aug 19, 2026OPEN

    30 E Rittenhouse St

    NEW STRUCTURE

  32. Violation Aug 19, 2026OPEN

    30 E Rittenhouse St

    NEW ELECTRICAL SERVICE

  33. Violation Aug 19, 2026OPEN

    30 E Rittenhouse St

    INSTALL FIRE SUPPRESSION SYSTEM

  34. Violation Aug 19, 2026OPEN

    30 E Rittenhouse St

    DUCTWORK

  35. Violation Aug 19, 2026OPEN

    30 E Rittenhouse St

    NEW PLUMBING

  36. Violation Aug 19, 2026OPEN

    30 E Rittenhouse St

    NEW STRUCTURE

  37. Violation Aug 19, 2026OPEN

    30 E Rittenhouse St

    DUCTWORK

  38. Violation Aug 19, 2026OPEN

    30 E Rittenhouse St

    NEW PLUMBING

  39. Violation Aug 19, 2026OPEN

    30 E Rittenhouse St

    NEW STRUCTURE

  40. Violation Aug 19, 2026OPEN

    30 E Rittenhouse St

    FAILURE TO PROVIDE REPORTS

  41. Violation Aug 19, 2026OPEN

    30 E Rittenhouse St

    FAILURE TO PROVIDE REPORTS

  42. Violation Aug 19, 2026OPEN

    30 E Rittenhouse St

    NEW STRUCTURE

  43. Violation Aug 19, 2026OPEN

    30 E Rittenhouse St

    INSTALL FIRE SUPPRESSION SYSTEM

  44. Violation Aug 19, 2026OPEN

    30 E Rittenhouse St

    DUCTWORK

  45. Violation Aug 19, 2026OPEN

    30 E Rittenhouse St

    NEW PLUMBING

  46. Violation Aug 19, 2026OPEN

    30 E Rittenhouse St

    FAILURE TO PROVIDE REPORTS

  47. Violation Aug 19, 2026OPEN

    30 E Rittenhouse St

    NEW STRUCTURE

  48. Violation Aug 19, 2026OPEN

    30 E Rittenhouse St

    INSTALL FIRE SUPPRESSION SYSTEM

  49. Violation Aug 19, 2026OPEN

    30 E Rittenhouse St

    NEW PLUMBING

  50. Violation Aug 19, 2026OPEN

    30 E Rittenhouse St

    NEW ELECTRICAL SERVICE

  51. Violation Aug 19, 2026OPEN

    30 E Rittenhouse St

    FAILURE TO PROVIDE REPORTS

  52. Violation Aug 19, 2026OPEN

    30 E Rittenhouse St

    NEW STRUCTURE

  53. Violation Aug 19, 2026OPEN

    30 E Rittenhouse St

    NEW ELECTRICAL SERVICE

  54. Violation Jul 14, 2026OPEN

    30 E Rittenhouse St

    FAILURE TO PROVIDE REPORTS

  55. Violation Jul 14, 2026OPEN

    30 E Rittenhouse St

    FAILURE TO PROVIDE REPORTS

  56. Violation Jul 14, 2026OPEN

    30 E Rittenhouse St

    NEW STRUCTURE

  57. Violation Jul 14, 2026OPEN

    30 E Rittenhouse St

    FAILURE TO PROVIDE REPORTS

  58. Violation Jul 14, 2026OPEN

    30 E Rittenhouse St

    NEW STRUCTURE

  59. Violation Jul 14, 2026OPEN

    30 E Rittenhouse St

    FAILURE TO PROVIDE REPORTS

  60. Violation Jul 14, 2026OPEN

    30 E Rittenhouse St

    NEW STRUCTURE

  61. Violation Jul 14, 2026OPEN

    30 E Rittenhouse St

    FAILURE TO PROVIDE REPORTS

  62. Violation Jul 14, 2026OPEN

    30 E Rittenhouse St

    NEW STRUCTURE

  63. Violation Jul 14, 2026OPEN

    30 E Rittenhouse St

    NEW STRUCTURE

  64. Violation Jul 14, 2026OPEN

    30 E Rittenhouse St

    FAILURE TO PROVIDE REPORTS

  65. Violation Jul 14, 2026OPEN

    30 E Rittenhouse St

    NEW STRUCTURE

  66. Violation Jul 14, 2026OPEN

    30 E Rittenhouse St

    FAILURE TO PROVIDE REPORTS

  67. Violation Jul 14, 2026OPEN

    30 E Rittenhouse St

    NEW STRUCTURE

  68. Violation Jul 14, 2026OPEN

    30 E Rittenhouse St

    FAILURE TO PROVIDE REPORTS

  69. Violation Jul 14, 2026OPEN

    30 E Rittenhouse St

    NEW STRUCTURE

  70. Violation Jul 14, 2026OPEN

    30 E Rittenhouse St

    FAILURE TO PROVIDE REPORTS

  71. Violation Jul 14, 2026OPEN

    30 E Rittenhouse St

    NEW STRUCTURE

  72. Violation Jul 14, 2026OPEN

    30 E Rittenhouse St

    FAILURE TO PROVIDE REPORTS

  73. Violation Jul 14, 2026OPEN

    30 E Rittenhouse St

    NEW STRUCTURE

  74. Violation May 8, 2025OPEN

    30 E Rittenhouse St

    NEW STRUCTURE

Track this owner

We'll flag their next deal, permit, or filing — usually before the neighbors know.

Entities are grouped by a normalized name from the public record; a separate legal entity per building is common, so some portfolios span several related names. Sources: Phila. Dept. of Records (deeds), L&I (permits & violations), Dept. of Revenue (tax delinquencies), reflecting the record as of our last weekly ingest. Verify independently before relying on it.
Last generated November 10, 2026.