Entity File · The Public Record
Company / LLC
Abc Construction CO., INC
18 permits
- Records on file
- 18
Built (as contractor)
18 entries
- Issued Jun 18, 2026
Excavation · Site / Utility Permit for RP-2025-010052, AND RP-2025-010056 to include underpinning.
- Issued May 20, 2026
Excavation · Site / Utility Permit for RP-2025-010011, RP-2025-010012, RP-2025-010013
- Issued May 12, 2026
Excavation · FOR EXCAVATION WORK ASSOCIATED WITH NEW CONSTRUCTION OF THIRTEEN (13) TOWNHOUSE BUILDINGS AS PER APPROVED PLANS. WORK TO INCLUDE TEMPORARY EXCAVATION SUPPORT SYSTEM AND UNDERPINNING. NO BUILDING CONSTRUCTION APPROVED ON THIS PERMIT. *2018 IBC REVIEW* **SEPARATE PERMITS REQUIRED FOR BUILDING CONSTRUCTION**
- Issued May 12, 2026
Excavation · Site / Utility Permit for RP-2025-010032, RP-2025-010044, RP-2025-010046, RP-2025-010048, RP-2025-010049, RP-2025-010050.
- Issued May 12, 2026
Excavation · Site / Utility Permit for RP-2025-010078 and RP-2025-010075
- Issued May 12, 2026
Excavation · Site / Utility Permit for RP-2025-010058, RP-2025-010059, AND RP-2025-010060.
- Issued May 12, 2026
Excavation · Site / Utility Permit for RP-2025-010083 AND RP-2025-010084
- Issued May 12, 2026
Excavation · Site / Utility Permit for RP-2025-010079, RP-2025-010081, AND RP-2025-010082 (To include Underpinning on RP-2025-010082)
- Issued Mar 16, 2026
Excavation · FOR THE EARTHWORK EXCAVATION AND SITE IMPROVEMENTS TO INCLUDE SITE DEMOLITION, GRADING, UNDERGROUND STORM AND SANITARY UTILITY INSTALLATION INCLUDING STORMWATER MANAGEMENT SYSTEM, RAIN GARDENS, CLEANOUTS, PRECAST STRUCTURES, AND TIE-INS TO EXISTING CITY MAIN PER APPROVED PLANS.
- Issued Feb 3, 2026
Minor Demolition · FOR THE COMPLETE DEMOLITION OF THE ATTACHED THREE-STORY STRUCTURE BY HAND AND HAND HOLD DEVICES. PEDESTRIAN PROTECTION TO BE IN PLACE PRIOR TO START OF WORK AND TO BE MAINTAINED DURING ALL DEMOLITION ACTIVITIES. *SEPERATE STREETS DEPARTMENT PERMIT REQUIRE FOR CLOSURE OF RIGHT OF WAY. *21 DAY POSING AND NOTICE WAIVED PER A-303.2.
- Issued Jan 5, 2026
Sitework with Onsite Utility Services · FOR SELECT SITE CLEARING AND THE INSTALLATION OF NEW LANDSCAPING/PAVEMENT ACCESSORY TO AN EXISTING BUILDING, THE INSTALLATION OF UNDERGROUND UTILITIES AND RELATED APPURTENANCES, FOR THE ERECTION OF PLAY AREAS CONTAINING PLAY COMPONENTS DESIGNED AND CONSTRUCTED FOR CHILDREN AND LOCATED ON AN ACCESSIBLE ROUTE. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS REQUIRED FOR ALL OTHER WORK. ** SEPERATE PERMITS REQ
- Issued Nov 24, 2025
Excavation · Site / Utility Permit for CP-2025-000270 02/27/2026 AMENDMENT: AMENEDMENT TO THE SITE / UTILITY PERMIT TO ADD THE FOLLOWING PERMITS: CP-2025-000271, CP-2025-000272, CP-2025-000273, CP-2025-000274 AND CP-2025-001139.
- Issued Oct 16, 2025
Sitework with Onsite Utility Services · FOR GENERAL EARTH DISTURBANCE, EXCAVATION, AND SITE GRADING AS PER APPROVED PLANS IN ASSOCIATION WITH INSTALLATION OF UNDERGROUND UTILITIES (STORMWATER LOT DRAINAGE). SEPARATE PERMIT REQUIRED FOR PLUMBING WORK.
Track this owner
We'll flag their next deal, permit, or filing — usually before the neighbors know.
Entities are grouped by a normalized name from the public record; a separate legal entity per building is common, so some portfolios span several related names. Sources: Phila. Dept. of Records (deeds), L&I (permits & violations), Dept. of Revenue (tax delinquencies), reflecting the record as of our last weekly ingest. Verify independently before relying on it.
Last generated August 1, 2026.