- Issued Jul 6, 2026
Addition and/or Alteration · ELECTRICAL WIRING FOR HVAC - Supply and install dedicated circuits for (2) outdoor condensers and (2) indoor air handlers located on 3rd floor and in basement.
- Issued Jun 24, 2026
Addition and/or Alteration · Relocate feeders and supply power to new chiller location. Remove and temporarily feed equipment as per trough demolition schedule. Supply and install new distribution panel PH as specified and fed from existing 208V / 3-phase / 125A feeder. Intercept existing branch circuits to remain fed from panel PH. Supply and install new branch circuits to feed new equipment from panel PH. All work to be perform according to the 2017 NEC and per approved plans.
- Issued Jun 4, 2026
Addition and/or Alteration · Fish wiring. Apply first coat of spackle. Finish spackle and paint not included and by homeowner. 200-amp Service Upgrade - Shut down power at the panel and remove the meter. - Disconnect taps and remove 100-amp service cable, meter socket. - Remove service cable from 100-amp main breaker panel. - Remove the 100-amp main breaker panel. - Supply and install 200-amp service cable, PVC weather head strap securely to the building to the new meter socket. - Supply and install a 200-amp aerial-fed me
- Issued May 19, 2026
Addition and/or Alteration · REPLACE WIRING BY FISHING WIRING THROUGHOUT MAKING NOTCHES AND HAND HOLES UNFINISHED BASEMENT AREA - Basement lighting and (3) receptacles BASEMENT HALLWAY - Hallway lighting and 3-gang switches BASEMENT LAUNDRY ROOM - 30-amp dryer receptacle - Laundry light and switch - (2) receptacles GARAGE - (2) lights and switch - Pool filtration system - Garage door receptacle KITCHEN - 3-way main kitchen lighting switch - 4-gang kitchen switches. Entry light/main lighting/sink (Fourth switch is unknown.
- Issued May 18, 2026
Addition and/or Alteration · REPLACE WIRING BY FISHING WIRING THROUGHOUT MAKING NOTCHES AND HAND HOLES UTILIZING EXISTING 100A SERVICE AND PANEL. BASEMENT - Supply and install new circuits for (4) basement lights and new switches and plates. - Supply and install new circuit and receptacle for washing machine. Supply and install new circuit and switch for gas boiler. FIRST FLOOR - Supply and install new circuit for (1) receptacle and plate for dining room. - Supply and install new circuit for (2) receptacles and plat
- Issued May 12, 2026
Addition and/or Alteration · FISHING WIRING WITHIN WALLS AND CEILINGS THROUGHOUT HOME FOYER HALL - Supply wiring to and install new LED recessed fixture and trim as specified. (1) - Install wiring, box, and device for 3-way dimming. (2) - Install Lutron Caseta dimming for new LED recessed light. (2) BEDROOM HALL - Supply wiring to and install new LED recessed fixtures and trims as specified. (2) - Install wiring, box, and device for 3-way dimming. (2) - Install Lutron Caseta dimming for new LED recessed lights. (2) LIVI
- Issued May 7, 2026
Addition and/or Alteration · REPLACE WIRING BY FISHING WIRING THROUGHOUT MAKING NOTCHES AND HAND HOLES First Floor Living Room - (1) ceiling light switch - (1) stairwell light 3-way switch - (1) ceiling light fixture. Dining Room - (1) ceiling light switch - (1) ceiling light fixture Kitchen - (1) ceiling light switch - (1) ceiling light fixture Second Floor Front Bedroom - (1) ceiling light switch - (1) ceiling light fixture Hallway - (1) hall light switch - (1) living room 3-way switch - (1) hall light fixture Middle Bedr
- Issued Apr 29, 2026
Addition and/or Alterations · EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES- For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. Location of rooftop equipment as shown in uploaded doc in File Notes tab (from previous, cancelled permit for proposed work). Mechanical equipment is being installed on roof out of public view, replacing current equipment and new equipment is being insta
- Issued Apr 10, 2026
Addition and/or Alteration · EZ PERMIT STANDARDS ALTERATIONS- For alterations to an Existing One Family Dwelling as per attached standard. Deviations from this standard will result in permit revocation and require submission of construction plans. Separate permits are required for plumbing and electrical work and the installation of heating/cooling appliances. STRUCTURAL ALTERATION OR REPAIR IS EXPRESSLY PROHIBITED UNDER THIS PERMIT. PROHIBITED STRUCTURAL WORK INCLUDES ANY MODIFICATION TO EXTERIOR WALLS, PARTY WALLS, FLOOR/
- Issued Mar 13, 2026
Addition and/or Alteration · SERVICE UPGRADE - Shut down power at panel and remove meter. - Disconnect taps and remove 100 amp service cable, meter socket. - Remove service cable from 100A main breaker panel. - Remove 100A main breaker panel. - Supply and install 200 Amp service cable, PVC weather head strap securely to building and to new disconnect and meter socket. - Supply and install a 200 Amp aerial fed meter socket with weather-proof hub. - Supply and install a 200 amp, 40 space, main breaker load center - Supply wir
- Issued Feb 26, 2026
Addition and/or Alteration · Install all wiring for bedrooms, bedroom hall & laundry, (3) bathrooms, 2nd floor stairway & landing, family room, front bedroom/hall/closet, front bedroom bath, front exterior & entry, living room, dining room, kitchen, stairs & landing, powder room, rear hallway & laundry, bedroom, bedroom bath, garage, car charger receptacle, rear exterior, dumbwaiter, cat6 & fiber optic cable ,2 feeder panels (all from existing 400A 2phase system). PER APPROVED DRAWINGS-2017 NEC. **Any change in service fro
- Issued Jan 30, 2026
Addition and/or Alteration · >>>ALL WIRING VIA FISHING/SURFACE MOUNT<<< MAIN SERVICE - Shut down power at panel and remove meter. - Disconnect taps from utility company and remove 60 amp service cable and conduit. - Remove main breaker panel and load-side service cable from meter to panel. - Supply and install new 100 Amp service cable and PVC weather head. - Sleeve wire in PVC conduit the last 10' until wire enters house. - Supply and install a 100 Amp aerial fed meter socket. - Supply and install a 100 amp, 20 space/40 c
- Issued Dec 8, 2025
Addition and/or Alteration · Supply and install all wiring, circuit breaker, and disconnect for a dedicated 30A/220V mini-split unit located on the exterior of the building at the specified location. Wiring shall be fished, properly terminated, energized, and tested. ALL WORK TO BE DONE ACCORDING TO THE 2017 NEC.
- Issued Nov 26, 2025
Addition and/or Alterations · EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES - For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. Replace high velocity system for 1st, 2nd, and 3rd floors. Install (2) outdoor units on side of home. (1) 54,500/ 56,000 BTU's/ 5 ton and (1) 34,200/ 34,600 BTU's/ 3 ton.
- Issued Nov 7, 2025
Addition and/or Alterations · EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES - For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. Mechanical equipment is being installed on roof out of public view, replacing current equipment and new equipment is being installed in the same location as existing. A representative of contractor confirmed the location as seen in image uploaded to File
- Issued Oct 21, 2025
Addition and/or Alterations · EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES- For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. EACH HVAC UNIT TO BE SELF-CONTAINED WITHIN EACH DWELLING UNIT. NO PENETRATIONS OF RATED ASSEMBLIES. Install high velocity system for 1st, 2nd, and 3rd floor and install Mitsubishi system. Outdoor units located on the side of the house. Outdoor units: 36,
- Issued Sep 17, 2025
Addition and/or Alterations · EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES- For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. Install a 4-1 Mitsubishi ductless mini-split system. Outdoor unit installed in back of the house. ANY DUCTWORK WILL REQUIRE A VALID BUILDING PERMIT. OUTDOOR UNIT MUST BE INSTALLED ON GROUND LEVEL.
Track this owner
We'll flag their next deal, permit, or filing — usually before the neighbors know.
Entities are grouped by a normalized name from the public record; a separate legal entity per building is common, so some portfolios span several related names. Sources: Phila. Dept. of Records (deeds), L&I (permits & violations), Dept. of Revenue (tax delinquencies), reflecting the record as of our last weekly ingest. Verify independently before relying on it.
Last generated August 1, 2026.