16 entries
- Issued Apr 27, 2026
Addition and/or Alteration · Demo, install receptacles, lights, lighting controls, and subpanel as per 2017 NEC.
- Issued Apr 27, 2026
Addition and/or Alteration · Demo, install receptacles, lights & lighting controls as per drawing. All work per approved plans. ***NO FIRE ALARM ON THIS PERMIT***
- Issued Apr 10, 2026
Addition and/or Alterations · FOR A MECHANICAL SYSTEM UPGRADE. **ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. **
- Issued Apr 3, 2026
Addition and/or Alteration · Demo, install receptacles, lights & lighting controls as per APPROVED DRAWINGS -2017 NEC .
- Issued Apr 1, 2026
Addition and/or Alterations · EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the relocation of sprinkler heads as per attached standards. Deviations from these standards require submission of construction and site plans. RELOCATE 3 HEADS
- Issued Mar 30, 2026
Addition and/or Alterations · FOR THE INSTALLATION OF ONE (1) SPLIT-SYSTEM HVAC APPLIANCE, RELOCATED AND NEW GRDs, AND ASSOCIATED DUCTWORK. ALL WORK TO BE DONE PER APPROVED PLANS AND IN ACCORDANCE WITH PHC AND PA DOH APPROVALS. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK. SEE CP-2026-000663 FOR ASSOCIATED BUILDING PERMIT.
- Issued Mar 25, 2026
Addition and/or Alterations · EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the relocation of sprinkler heads as per attached standards. Deviations from these standards require submission of construction and site plans. RELOCATE 4 HEADS
- Issued Mar 24, 2026
Addition and/or Alterations · FOR THE REMOVAL AND REPLACEMENT OF TWO (2) HVAC APPLIANCES (PTAC UNITS) AND THE RELOCATION OF ONE (1) DIFFUSER AS PER APPROVED PLANS AND IN ACCORDANCE WITH 2018 IMC AND PHC AND PA DOH APPROVALS. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK. SEE CP-2026-000622 FOR ASSOCIATED BUILDING PERMIT.
- Issued Mar 23, 2026
1 units
Addition and/or Alteration · FOR LEVEL I INTERIOR ALTERATIONS ON THE 4TH FLOOR OF AN EXISTING HOSPITAL (WITHIN TOWER BLDG. AND LIFTER BLDG.) PER APPROVED PLANS AND PA DOH APPROVAL. ALTERATIONS TO INCLUDE THE ERECTION OF PARTITION WALLS, PROVIDE FINISHES/ FURNISHINGS AND ACCESSIBILITY IMPROVMENTS THROUGHOUT. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK.
- Issued Mar 20, 2026
Addition and/or Alterations · EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the relocation of sprinkler heads as per attached standards. Deviations from these standards require submission of construction and site plans. Relocate 12 sprinkler heads
- Issued Mar 19, 2026
1 units
Addition and/or Alteration · FOR LEVEL II ALTERATIONS TO AN EXISTING STRUCTURE. ALTERATIONS TO INCLUDE THE ERECTION OF PARTITION WALLS, PROVIDE FINISHES/FURNISHINGS AND ACCESSIBILITY IMPROVMENTS THROUGHOUT. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK. PA DOH APPROVAL UNDER ID #270601-01 AND DWG INDEX # H-25-1315.
- Issued Feb 25, 2026
1 units
Addition and/or Alteration · FOR LEVEL II ALTERATIONS TO AN EXISTING HOSPITAL, ALTERATIONS TO INCLUDE THE ERECTION OF PARTITION WALLS, PROVIDE FINISHES/FURNISHINGS AND ACCESSIBILITY IMPROVEMENTS THROUGHOUT. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK. *ASBESTOS REMEDIATION REQUIRED*
- Issued Nov 6, 2025
Addition and/or Alteration · Renovate an old X-Ray Room to accept new X-Ray equipment and a new X-Ray machine as per 2017 NEC.
- Issued Aug 22, 2025
Addition and/or Alteration · Provide and install a new 400A CB and hardware for existing Panel. Provide and install a new 400A ATS, New 400A Panel and associated feeders as per 2017 NEC.
- Issued Jul 28, 2025
1 units
Addition and/or Alteration · FOR LEVEL II ALTERATIONS TO INCLUDE NEW PARTITIONS, FIXTURES, FURNISHINGS, FINISHES, DOORS AS PER APPROVED PLANS. SEPARATE PERMITS REQUIRED FOR MEP AND FIRE SUPPRESSION WORK. *2018 IEBC*
- Issued Jul 24, 2025
1 units
Addition and/or Alteration · FOR LEVEL II ALTERATIONS TO INCLUDE NEW PARTITIONS, FIXTURES, FURNISHINGS, DOORS, FINISHES AS PER APPROVED PLANS. SEPARATE PERMITS REQUIRED FOR MEP AND FIRE SUPPRESSION WORK. *2018 IEBC*
Track this owner
We'll flag their next deal, permit, or filing — usually before the neighbors know.
Entities are grouped by a normalized name from the public record; a separate legal entity per building is common, so some portfolios span several related names. Sources: Phila. Dept. of Records (deeds), L&I (permits & violations), Dept. of Revenue (tax delinquencies), reflecting the record as of our last weekly ingest. Verify independently before relying on it.
Last generated July 15, 2026.