34 permits
- Records on file
- 34
Built (as contractor)
34 entries
- Issued May 27, 2026
Addition and/or Alteration · Wiring throughout of this building with incoming 800A 120/240V service 300A 120/240V disconnect for the commercial area with 300A MLO panel inside the unit 400 A 120/240 V MCB or fused disconnect for the apartments and house meter 3 apartments with 30 space 125A MLO panels and 1 apartment with 150A MLO panel according to the plans 100 A MLO panel for the common areas as house meter Wiring throughout according to 2017 NEC with ceiling mounted LED lights provided by the owner, installed by
- Issued May 8, 2026
Addition and/or Alteration · -Remove existing 100 amp service -Install -1- 200 amp service with approx. 30’ se cable -ONE 200 amp meter socket disconnect combo -ONE 200 amp main lug 40 circuit panel -ONE ground rods -Feed existing 100 amp panel as sub panel
- Issued May 5, 2026
New Construction · - Install Wiring throughout this building,600A incoming service - aerial - 600A single phase main breaker or fused disconnect with 7 meters rated 125A each will be supplied and installed on the side of the building where plans show. - 125A MLO panels, 30 circuit on each apartment - 100 A panel for the house panel - 4-inch or 6-inch disc lights throughout, that we supply, 3000 K . - Decora switches and outlets, white. -hard wired smoke alarms - All electric appliances - Wiring for cable TV i
- Issued Mar 27, 2026
Addition and/or Alteration · INSTALL 400 AMP ELECTRICAL SERVICE AND 4 METER PACKS WITH PROPER GROUNDING AND BONDING. INSTALL ONE 100 AMP SUBPANELS FOR HOUSE AND ONE 150 AMP SUBPANEL FOR EACH OF THE 3 DWELLING UNITS. INSTALL WIRING, LIGHTING, SWITCHES AND RECEPTACLE OUTLETS. INSTALL INTERCONNECTED SMOKE AND CO ALARMS. INSTALL FIRE ALARM SYSTEM. ALL WORK TO BE DONE ACCORDING TO THE 2017 NEC, 2016 NFPA 72 AND PER PLANS.
- Issued Mar 20, 2026
Addition and/or Alteration · Single family home - rehab. Existing 100AMP service is already in place. New 30 ct main breaker panel. Wiring throughout by 2017 NEC.
- Issued Mar 19, 2026
Addition and/or Alteration · 200 amp incoming service House and unit meters. 125A panels in each unit. 100 A house panel. Wiring throughout per 2017 NEC. Installation of all owner supplied electrical appliances. Decora switches and outlets throughout. Hard wired smoke detectors We will supply and install 4 inch disc lights in all hallways including the common hallway . 4 inch LED disc lights throughout the units. Permits & inspection included
- Issued Mar 19, 2026
Addition and/or Alteration · -200A incoming service - House and unit meters. -125A panels in each unit. -100 A house panel. - Wiring throughout per 2017 NEC. - Installation of all owner supplied electrical appliances. -Decora switches and outlets throughout. -Hard wired smoke detectors -We will supply and install 4 inch disc lights in all hallways including the common hallway . -4 inch LED disc lights throughout the units.
- Issued Feb 4, 2026
New Construction · Install - New 300Amp Service, 1PH. - Wiring throughout, according to plans. - 4 meter box, 125A per unit (3), 100A house meter, as per plans. - Wiring for doorbells, doorbells included. - Will supply and install 4" LED disc lights for common areas. - Fire Alarm as per NAC. - Service Inspection. - Permit Included. - Installation of decorative light fixtures, .ALL WORK IS TO BE DONE ACCORDING TO APPROVED DRAWINGS-2017 NEC,2016 NFPA-72.
- Issued Feb 2, 2026
New Construction · Wiring throughout, 400A 240/120V incoming service, 125A panels for each unit, 100A house panel, 6" disc lights throughout, switches & outlets, 110v hard wired smoke alarms , bath fans, 50cfm, new fire alarm system . ALL WORK IS TO BE DONE ACCORDING TO APPROVED DRAWINGS-2017 NEC,2016 NFPA-72.
- Issued Jan 28, 2026
Addition and/or Alteration · Wiring of small addition to existing upstairs unit. 4-6 recessed lights and 8 outlets.
- Issued Dec 29, 2025
New Construction · AMEND PERMIT 2/2/2026 - CHANNGE OF AGENCY Wiring throughout of this 2 family dwelling with led disc lights and hard wired smoke detectors.
- Issued Dec 22, 2025
Addition and/or Alteration · Install 300A service, new house panel ,wire throughout 2nd & 3rd fls for two residential units (1st fl & basement are existing) ,EM.LIGHTING,SMOKE ALARMS AND FIRE ALARM. ALL WORK IS TO BE DONE ACCORDING TO APPROVED DRAWINGS-2017 NEC,2016 NFPA-72 .
- Issued Dec 18, 2025
Addition and/or Alteration · Instalation of a 600 amp service Wiring through out Vacant commercial space three dwellings Fire alarm installed through out In Accordance with NFPA 72 2016 & The Philadelphia Fire code 2018 **ELECTRICAL PERMIT REQ'D FOR FITOUT OF COMMERCIAL SPACES -A SERVICE CALC WAS NOT SUPPLIED FOR COMMERCIAL SPACES (VACANT CALC ONLY) A NEW SERVICE CALC WILL BE NEEDED FOR FUTURE USES**
- Issued Dec 17, 2025
New Construction · Installation of 400 amp service Interior wiring of 4 apartments and common areas fire alarm installation
- Issued Dec 9, 2025
Addition and/or Alteration · Electrical Permit for combo CP-2025-003935
- Issued Nov 3, 2025
Addition and/or Alteration · Repair wiring in and out of the facade of the building from 1st to 3rd floor.
- Issued Oct 16, 2025
New Construction · INSTALL 200 AMP ELECTRICAL SERVICE, METER SOCKET AND MAIN CIRCUIT BREAKER PANEL WITH PROPER GROUNDING AND BONDING. INSTALL WIRING, LIGHTING, SWITCHES AND RECEPTACLE OUTLETS. INSTALL INTERCONNECTED 120 VOLT SMOKE AND CO ALARMS. ALL WORK TO BE DONE ACCORDING TO THE 2017 NEC.
- Issued Oct 15, 2025
Addition and/or Alteration · 200AMP incoming service, 125 AMP panel on each unit 60 amp panel for the garage. 4 inch led lights throughout electric appliances wire and installation hardwire smoke detectors cable tv outlets in each bedroom and living room five outdoor lights on second floor builder grade bathroom fans
- Issued Oct 10, 2025
New Construction · - Wiring throughout, per plans. 200AMP Incoming service. - 4" LED Disc Lights throughout - 30 Circuit MLO panels in each unit - All electric appliances - Decora switches and outlets throughout. - Hard wired smoke detectors - Builder grade bath fans supplied and installed by us.
- Issued Oct 6, 2025
New Construction · Installation of electrical wiring, fixtures and outlets. ALL WORK IS TO BE DONE ACCORDING TO APPROVED DRAWINGS-2017 NEC. **NO FIRE ALARM ON THIS PERMIT**
- Issued Aug 21, 2025
Addition and/or Alteration · - Wiring of this 36-unit apartment building, per 2017 NEC plans provided - We will install the owner provided main breaker, 1200A, 3-phase, and 36-meter sockets for the apartments; house panel, as shown on the plans. - 150A MLO electric panels for each apartment - Electrical service materials are installed by us - All electrical appliances - Hardwired smoke detectors - Builder grade bath fans installed by us, supplied by the builder - Decora switched and outlets - We will install all light fi
- Issued Aug 13, 2025
New Construction · INSTALL ONE 800 AMP ELECTRICAL SERVICE, TWO 400 AMP AND ONE 200 AMP ELECTRICAL PANELS WITH PROPER GROUNDING AND BONDING. INSTALL DEDICATED BRANCH CIRCUITS FOR THE HVAC, CHAIRLIFT, HOT WATER HEATER, INSTALL WIRING, LIGHTING, LIGHTING CONTROLS, EMEGENCY LIGHTING AND RECEPTACLE OUTLETS. INSTALL FIRE ALARM SYSTEM. ALL WORK TO BE DONE ACCORDING TO THE 2017 NEC, 2016 NFPA 72 AND PER PLANS.
- Issued Aug 11, 2025
New Construction · - All work done by 2017 NEC - 200A incoming service - LED Disc lights throughout - Decora Switches and outlets. - Hardwire smoke detectors. - All gas appliances - Builder grade bath fans installed, and supplied by owner - All decorative light fixtures to be supplied by homeowner.
- Issued Aug 11, 2025
New Construction · - All work done by 2017 NEC - 200A incoming service - LED Disc lights throughout - Decora Switches and outlets. - Hardwire smoke detectors. - All gas appliances - Builder grade bath fans installed, and supplied by owner - All decorative light fixtures to be supplied by homeowner.
- Issued Aug 11, 2025
New Construction · - All work done by 2017 NEC - 200A incoming service - LED Disc lights throughout - Decora Switches and outlets. - Hardwire smoke detectors. - All gas appliances - Builder grade bath fans installed, and supplied by owner - All decorative light fixtures to be supplied by homeowner.
- Issued Jul 30, 2025
New Construction · INSTALL 800 AMP ELECTRICAL SERVICE AND 10 METER PACKS WITH PROPER GROUNDING AND BONDING. INSTALL ONE 100 AMP SUBPANELS FOR HOUSE AND ONE 125 AMP SUBPANEL FOR EACH OF THE 9 DWELLING UNITS. INSTALL WIRING, LIGHTING, SWITCHES AND RECEPTACLE OUTLETS. INSTALL INTERCONNECTED SMOKE AND CO ALARMS. INSTALL FIRE ALARM SYSTEM. ALL WORK TO BE DONE ACCORDING TO THE 2017 NEC, 2016 NFPA 72 AND PER PLANS.
- Issued Jul 25, 2025
New Construction · - Wiring throughout per NEC 2017 - 3 gang meter socket outside - 4"-disc lights throughout - Decora receptacles and switches - All electric appliances - Hardwired smoke detectors - Builder’s grade bathroom fans
Track this owner
We'll flag their next deal, permit, or filing — usually before the neighbors know.
Entities are grouped by a normalized name from the public record; a separate legal entity per building is common, so some portfolios span several related names. Sources: Phila. Dept. of Records (deeds), L&I (permits & violations), Dept. of Revenue (tax delinquencies), reflecting the record as of our last weekly ingest. Verify independently before relying on it.
Last generated August 1, 2026.