Entity File · The Public Record
Company / LLC
Altus Development INC
11 permits
- Records on file
- 11
Built (as contractor)
11 entries
- Issued Jul 22, 2026
1 units
New Construction · NEW CONSTRUCTION OF AN ATTACHED STRUCTURE TO INCLUDE PILOT HOUSE AND ROOF DECK FOR USE AS SINGLE-FAMILY HOUSEHOLD LIVING. SHEETING AND SHORING AS PRESCRIBED IN GEOTECH REPORT. SEPARATE PERMITS REQUIRED FOR SPRINKLER (13D) WORK. ENERGY CODE COMPLIANCE IN ACCORDANCE WITH 2018 IECC. PRIOR TO ISSUANCE OF C/O SUBMITTAL OF AIR BARRIER CHECKLIST AND ENVELOPE TESTING CERTIFICATE IS REQUIRED. TO BE COMPLETED BY AN APPROVED PARTY. **NO UNDERPINNING OR EXCAVATION BELOW THE ADJACENT FOUNDATIONS**
- Issued Jul 15, 2026
New construction, addition, GFA change · For the erection of an attached structure with a roof deck and access structure. Size and location as shown in plans.
- Issued Jul 15, 2026
1 units
New Construction · FOR THE NEW CONSTRUCTION OF A THREE (3) STORY BUILDING WITH A ROOF DECK AND ROOF DECK ACCESS STRUCTURE FOR THE USE OF SINGLE FAMILY DWELLING. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. **A COVERED WALKWAY OR SIDEWALK CLOSURE SHALL BE REQUIRED WITHIN THE BUILDING FACADE IN ACCORDANCE WITH SECTION 3306 OF THE 2018 IBC.
- Issued May 15, 2026
New construction, addition, GFA change · FOR THE ERECTION OF AN ATTACHED STRUCTURE TO INCLUDE A ROOF DECK AND ROOF DECK ACCESS STRUCTURE. SIZE AND LOCATION AS SHOWN IN PLANS.
- Issued Mar 19, 2026
New Construction · Mechanical / Fuel Gas Permit for combo RP-2025-010733
- Issued Mar 17, 2026
New Construction · Mechanical / Fuel Gas Permit for combo RP-2025-009834
- Issued Jan 21, 2026
1 units
New Construction · FOR THE NEW CONSTRUCTION OF AN ATTACHED THREE (3) STORY BUILDING WITH A ROOF DECK AND ROOF DECK ACCESS STRUCTURE FOR THE USE OF SINGLE FAMILY DWELLING. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK.
- Issued Dec 29, 2025
1 units
New Construction · OR THE ERECTION OF AN ATTACHED STRUCTURE, ROOF DECK AND ROOF DECK ACCESS STRUCTURE. FOR USE AS A SINGLE FAMILY HOUSEHOLD LIVING. BUILDING TO BE FULLY SPRINKLERED PER NFPA 13D. SEPARATE PERMITS REQUIRED FOR MEP & FP WORK.
- Issued Dec 10, 2025
New construction, addition, GFA change · FOR THE ERECTION OF AN ATTACHED NEW STRUCTURE WITH A CELLAR AND AN ACCESSORY ROOF DECK (FOR RESIDENTIAL USE ONLY) WITH ROOF ACCESS STRUCTURE. SIZE AND LOCATION AS SHOWN IN THE APPLICATION / PLAN.
- Issued Oct 11, 2025
New Construction · FOR INSTALLATION OF HVAC SYSTEM AS PER APPROVED PLANS.
- Issued Sep 23, 2025
New Construction · EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES - For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. MINI-SPLIT SYSTEM. 1 OUTDOOR AC CONDENSER, 5 INDOOR AC FAN COILS
Track this owner
We'll flag their next deal, permit, or filing — usually before the neighbors know.
Entities are grouped by a normalized name from the public record; a separate legal entity per building is common, so some portfolios span several related names. Sources: Phila. Dept. of Records (deeds), L&I (permits & violations), Dept. of Revenue (tax delinquencies), reflecting the record as of our last weekly ingest. Verify independently before relying on it.
Last generated September 16, 2026.