THE INDEX: 64 17 · week of Jun 29permits soft, openings quiet, deal ledger quiet

The Philadelphia Index

Entity File · The Public Record

Company / LLC

Angel Oak Construction LLC

11 permits

Records on file
11

Built (as contractor)

11 entries

  1. Issued May 21, 2026

    1 units

    2447 N 6th St

    New Construction · FOR THE ERECTION OF AN ATTACHED TWO (2) STORY BUILDING FOR THE USE OF SINGLE FAMILY DWELLING. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. **A COVERED WALKWAY OR SIDEWALK CLOSURE SHALL BE REQUIRED WITHIN THE BUILDING FACADE IN ACCORDANCE WITH SECTION 3306 OF THE 2018 IBC.

  2. Issued May 21, 2026

    1 units

    2415 N 6th St

    New Construction · FOR THE ERECTION OF A TWO (2) STORY ATTACHED STRUCTURE WITH BASEMENT FOR USE AS A SINGLE-FAMILY DWELLING (GROUP R-3). BUILDING TO BE FULLY SPRINKLERED PER NFPA 13D. ALL WORK TO BE DONE PER APPROVED PLANS AND IN ACCORDANCE WITH 2018 IRC. SEPARATE PERMITS REQUIRED FOR MECHANICAL, ELECTRICAL, PLUMBING, FIRE SUPPRESSION, AND EXCAVATION WORK. ENERGY CODE COMPLIANCE IN ACCORDANCE WITH 2018 IECC. PRIOR TO ISSUANCE OF C.O., SUBMITTAL OF AIR BARRIER CHECKLIST AND ENVELOPE TESTING CERTIFICATE IS REQUIRED.

  3. Issued May 21, 2026

    1 units

    2411 N 6th St

    New Construction · FOR THE ERECTION OF A TWO (2) STORY ATTACHED STRUCTURE WITH BASEMENT FOR USE AS A SINGLE-FAMILY DWELLING (GROUP R-3). BUILDING TO BE FULLY SPRINKLERED PER NFPA 13D. ALL WORK TO BE DONE PER APPROVED PLANS AND IN ACCORDANCE WITH 2018 IRC. SEPARATE PERMITS REQUIRED FOR MECHANICAL, ELECTRICAL, PLUMBING, FIRE SUPPRESSION, AND EXCAVATION WORK. ENERGY CODE COMPLIANCE IN ACCORDANCE WITH 2018 IECC. PRIOR TO ISSUANCE OF C.O., SUBMITTAL OF AIR BARRIER CHECKLIST AND ENVELOPE TESTING CERTIFICATE IS REQUIRED.

  4. Issued May 21, 2026

    1 units

    2409 N 6th St

    New Construction · FOR THE ERECTION OF A TWO (2) STORY ATTACHED STRUCTURE WITH BASEMENT FOR USE AS A SINGLE-FAMILY DWELLING (GROUP R-3). BUILDING TO BE FULLY SPRINKLERED PER NFPA 13D. ALL WORK TO BE DONE PER APPROVED PLANS AND IN ACCORDANCE WITH 2018 IRC. SEPARATE PERMITS REQUIRED FOR MECHANICAL, ELECTRICAL, PLUMBING, FIRE SUPPRESSION, AND EXCAVATION WORK. ENERGY CODE COMPLIANCE IN ACCORDANCE WITH 2018 IECC. PRIOR TO ISSUANCE OF C.O., SUBMITTAL OF AIR BARRIER CHECKLIST AND ENVELOPE TESTING CERTIFICATE IS REQUIRED.

  5. Issued May 21, 2026

    1 units

    2407 N 6th St

    New Construction · FOR THE ERECTION OF A TWO (2) STORY ATTACHED STRUCTURE WITH BASEMENT FOR USE AS A SINGLE-FAMILY DWELLING (GROUP R-3). BUILDING TO BE FULLY SPRINKLERED PER NFPA 13D. ALL WORK TO BE DONE PER APPROVED PLANS AND IN ACCORDANCE WITH 2018 IRC. SEPARATE PERMITS REQUIRED FOR MECHANICAL, ELECTRICAL, PLUMBING, FIRE SUPPRESSION, AND EXCAVATION WORK. ENERGY CODE COMPLIANCE IN ACCORDANCE WITH 2018 IECC. PRIOR TO ISSUANCE OF C.O., SUBMITTAL OF AIR BARRIER CHECKLIST AND ENVELOPE TESTING CERTIFICATE IS REQUIRED.

  6. Issued May 21, 2026

    1 units

    2445 N 6th St

    New Construction · FOR THE ERECTION OF AN ATTACHED TWO (2) STORY BUILDING FOR THE USE OF SINGLE FAMILY DWELLING. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. **A COVERED WALKWAY OR SIDEWALK CLOSURE SHALL BE REQUIRED WITHIN THE BUILDING FACADE IN ACCORDANCE WITH SECTION 3306 OF THE 2018 IBC. ***DEED MUST BE RECORDED PRIOR TO THE ISSUANCE OF CO****

  7. Issued May 21, 2026

    1 units

    2413 N 6th St

    New Construction · FOR THE ERECTION OF A TWO (2) STORY ATTACHED STRUCTURE WITH BASEMENT FOR USE AS A SINGLE-FAMILY DWELLING (GROUP R-3). BUILDING TO BE FULLY SPRINKLERED PER NFPA 13D. ALL WORK TO BE DONE PER APPROVED PLANS AND IN ACCORDANCE WITH 2018 IRC. SEPARATE PERMITS REQUIRED FOR MECHANICAL, ELECTRICAL, PLUMBING, FIRE SUPPRESSION, AND EXCAVATION WORK. ENERGY CODE COMPLIANCE IN ACCORDANCE WITH 2018 IECC. PRIOR TO ISSUANCE OF C.O., SUBMITTAL OF AIR BARRIER CHECKLIST AND ENVELOPE TESTING CERTIFICATE IS REQUIRED.

  8. Issued May 4, 2026

    1 units

    201 Rex Ave

    New Construction · FOR THE CONSTRUCTION OF A DETACHED STRUCTURE WITH CELLAR. FOR USE AS A SINGLE-FAMILY HOUSEHOLD LIVING. AS PER APPROVED PLANS. ********************SEPARATE PERMITS FOR ELECTRICAL, PLUMBING, OR MECHANICAL WORK. ************************************

  9. Issued Apr 27, 2026

    1 units

    2439 N 6th St

    New Construction · FOR THE ERECTION OF AN ATTACHED TWO (2) STORY BUILDING FOR THE USE OF SINGLE FAMILY DWELLING. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. **A COVERED WALKWAY OR SIDEWALK CLOSURE SHALL BE REQUIRED WITHIN THE BUILDING FACADE IN ACCORDANCE WITH SECTION 3306 OF THE 2018 IBC.

  10. Issued Apr 27, 2026

    1 units

    2443 N 6th St

    New Construction · FOR THE ERECTION OF AN ATTACHED TWO (2) STORY BUILDING FOR THE USE OF SINGLE FAMILY DWELLING. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. **A COVERED WALKWAY OR SIDEWALK CLOSURE SHALL BE REQUIRED WITHIN THE BUILDING FACADE IN ACCORDANCE WITH SECTION 3306 OF THE 2018 IBC.

  11. Issued Apr 27, 2026

    1 units

    2441 N 6th St

    New Construction · FOR THE ERECTION OF AN ATTACHED TWO (2) STORY BUILDING FOR THE USE OF SINGLE FAMILY DWELLING. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. **A COVERED WALKWAY OR SIDEWALK CLOSURE SHALL BE REQUIRED WITHIN THE BUILDING FACADE IN ACCORDANCE WITH SECTION 3306 OF THE 2018 IBC.

Track this owner

We'll flag their next deal, permit, or filing — usually before the neighbors know.

Entities are grouped by a normalized name from the public record; a separate legal entity per building is common, so some portfolios span several related names. Sources: Phila. Dept. of Records (deeds), L&I (permits & violations), Dept. of Revenue (tax delinquencies), reflecting the record as of our last weekly ingest. Verify independently before relying on it.
Last generated August 1, 2026.