58 permits
- Records on file
- 58
Built (as contractor)
58 entries
- Issued Jul 3, 2026
Alterations · ALTERATIONS TO RESTAURANT. INTERIOR INSTALLATION OF DRAINAGE, WASTE, VENT, AND WATER SUPPLY FOR LISTED FIXTURES. ALL MATERIALS SHALL BE METALLIC TO ROOF EXTENSION. VENTING TO BE DESIGNED AND INSTALLED IN ACCORDANCE WITH SECTION 919 PHILADELPHIA SINGLE STACK VENT SYSTEM. ALL WORK TO BE INSTALLED IN STRICT COMPLIANCE WITH 2018 PPC AND APPROVED PLANS
- Issued Jun 25, 2026
New Construction or Additions · Install yard drain S-19 and connect to City main
- Issued Jun 5, 2026
New Construction or Additions · ALTERATIONS TO EXISTING ROOFTOP RESTAURANT. INTERIOR INSTALLATION OF DRAINAGE, WASTE, VENT, AND WATER SUPPLY FOR LISTED FIXTURES. ALL MATERIALS SHALL BE METALLIC TO ROOF EXTENSION. VENTING TO BE DESIGNED AND INSTALLED IN ACCORDANCE WITH SECTION 919 PHILADELPHIA SINGLE STACK VENT SYSTEM. ALL WORK TO BE INSTALLED IN STRICT COMPLIANCE WITH 2018 PPC AND APPROVED PLANS
- Issued May 29, 2026
New Construction or Additions · Install 2-sump pumps; 3- area drains; 29- floor drains; 1- trench drain(other); 26- hot water heaters; 26- water closets; 26- lavatories; 26-tub/showers; 6- hose bibs; 1- booster pump(other); 26- laundry; 10- roof drains; 26-kitchen sinks to include all necessary piping as per plans
- Issued May 26, 2026
New Construction or Additions · NEW CONSTRUCTION OF 3 STORY MULTI UNIT BUILDING. INTERIOR INSTALLATION OF DRAINAGE, WASTE, VENT, AND WATER SUPPLY FOR LISTED FIXTURES. ALL MATERIALS SHALL BE METALLIC TO ROOF EXTENSION FOR FIXTURES AND PIPING SERVING COMMERCIAL SPACE.. VENTING TO BE DESIGNED AND INSTALLED IN ACCORDANCE WITH SECTION 919 PHILADELPHIA SINGLE STACK VENT SYSTEM. ALL WORK TO BE INSTALLED IN STRICT COMPLIANCE WITH 2018 PPC AND APPROVED PLANS Install 44- water closets; 46-lavatories; 44- tub/shower; 45- floor drains;
- Issued May 12, 2026
New Construction or Additions · NEW CONSTRUCTION OF MULTI UNIT BUILDING. INTERIOR INSTALLATION OF DRAINAGE, WASTE, VENT, AND WATER SUPPLY FOR LISTED FIXTURES. VENTING TO BE DESIGNED AND INSTALLED IN ACCORDANCE WITH CHAPTER 7 BASE VENTING SYSTEM. ALL WORK TO BE INSTALLED IN STRICT COMPLIANCE WITH 2018 PPC AND APPROVED PLANS
- Issued May 11, 2026
Alterations · ALTERATIONS TO RESTAURANT. INTERIOR INSTALLATION OF DRAINAGE, WASTE, VENT, AND WATER SUPPLY FOR LISTED FIXTURES. ALL MATERIALS SHALL BE METALLIC TO ROOF EXTENSION. VENTING TO BE DESIGNED AND INSTALLED IN ACCORDANCE WITH SECTION 919 PHILADELPHIA SINGLE STACK VENT SYSTEM. ALL WORK TO BE INSTALLED IN STRICT COMPLIANCE WITH 2018 PPC AND APPROVED PLANS
- Issued May 6, 2026
Addition and/or Alterations · Mechanical / Fuel Gas Permit for combo RP-2026-002143
- Issued May 4, 2026
New Construction or Additions · AMENDMENT 6/8/2026 REVISIONS TO MATERIAL SCHEDULE. NEW CONSTRUCTION OF MIXED USE BUILDING. INTERIOR INSTALLATION OF DRAINAGE, WASTE, VENT, AND WATER SUPPLY FOR LISTED FIXTURES. ALL MATERIALS SHALL BE METALLIC TO ROOF EXTENSION FOR PIPING SERVING COMMERCIAL SPACE. VENTING TO BE DESIGNED AND INSTALLED IN ACCORDANCE WITH SECTION 919 PHILADELPHIA SINGLE STACK VENT SYSTEM. ALL WORK TO BE INSTALLED IN STRICT COMPLIANCE WITH 2018 PPC AND APPROVED PLANS
- Issued Apr 16, 2026
New Construction or Additions · NEW CONSTRUCTION OF MIXED USE BUILDING.. INTERIOR INSTALLATION OF DRAINAGE, WASTE, VENT, AND WATER SUPPLY FOR LISTED FIXTURES. ALL MATERIALS SHALL BE METALLIC TO ROOF EXTENSION FOR COMMERCIAL SPACE. VENTING TO BE DESIGNED AND INSTALLED IN ACCORDANCE WITH SECTION 919 PHILADELPHIA SINGLE STACK VENT SYSTEM. ALL WORK TO BE INSTALLED IN STRICT COMPLIANCE WITH 2018 PPC AND APPROVED PLANS
- Issued Apr 13, 2026
Alterations · ALTERATIONS TO DENTAL OFFICE. INTERIOR INSTALLATION OF DRAINAGE, WASTE, VENT, AND WATER SUPPLY FOR LISTED FIXTURES. MEDICAL GAS SHALL BE INSTALLED IN ACCORDANCE WITH NFPA 99 AND BY THE INSTALLED PROVIDED ON PERMIT. ALL MATERIALS SHALL BE METALLIC TO ROOF EXTENSION. VENTING TO BE DESIGNED AND INSTALLED IN ACCORDANCE WITH SECTION 919 PHILADELPHIA SINGLE STACK VENT SYSTEM. ALL WORK TO BE INSTALLED IN STRICT COMPLIANCE WITH 2018 PPC AND APPROVED PLANS.
- Issued Mar 31, 2026
New Construction or Additions · INSTALL SANITARY AND STORM CT, FAI, MD, 4" WDP & 4" BACKFLOW DEVICE.
- Issued Mar 19, 2026
Alterations · Plumbing Permit (Exterior Building Drainage) for combo CP-2025-005291
- Issued Mar 17, 2026
New Construction or Additions · For minor construction work at the subject property in accordance with all applicable provisions of the Philadelphia Code, all references codes and standards, and the attached EZ Standard, where included. Deviation from this standard shall result in permit revocation. A separate permit from the Philadelphia Department of Streets is required for any sidewalk and street closures. All means of pedestrian protection required at the site in accordance with the Philadelphia Building Code Chapter 33 sh
- Issued Mar 17, 2026
New Construction or Additions · Install 2- trench drain(other); 1- booster pump(other); 3- hose bibs; 7- floor drains; 58- water closets; 66- lavatories; 58- tub/shower; 46- kitchen sinks; 46- laundry; 46-hot water heaters; - sump pumps; 5-area drains; 63- hub drains; 2- backflow devices and to include all necessary piping as per plans **********Fixture count is the same – pipe routing on first floor is just changing as per attached plans************************************
- Issued Mar 12, 2026
Alterations · Install 1- standing utility sink(other); 2- floor drains; 3- water closets; 1- janitor sink(other); and 2- lavatories with all necessary piping as per plans
- Issued Mar 8, 2026
Alterations · INSTALLATION OF 1 1/2" WATER SERVICE AND ONSITE STORMWATER LOT DRAINAGE IN ACCORDANCE WITH APPROVED PLANS. ALL WORK PERFORMED IN STRICT COMPLIANCE WITH 2018 PPC AND APPROVED PLANS.
- Issued Feb 23, 2026
New Construction or Additions · Install 8- water closets; 8- lavatories; 8- tub/shower; 4- kitchen sinks; 4- laundry boxes; 4- hot water heater; 1- sewage ejector; 1- sump pump; 6- area drains; 4- hub drains; 1- floor drain; and 3- roof drains to include necessary piping as per plans
- Issued Feb 9, 2026
New Construction or Additions · Install 2" domestic service, storm and sanitary curb traps complete with fresh air inlets and main house drains
- Issued Jan 30, 2026
New Construction or Additions · Install 1 1/2" domestic water service, storm and sanitary curb traps complete with fresh air inlets and main house drains. (Exterior Work Only)
- Issued Jan 28, 2026
New Construction or Additions · INSTALL SANITARY AND STORM CT's, FAI's, MD's, 4" WDP & 4" BACKFLOW DEVICE.
- Issued Jan 28, 2026
New Construction or Additions · Install 4" domestic water service, backflow, storm and sanitary curb traps complete with fresh air inlets and main house drains. Install (5)- 8x8 yard drains as per plans
- Issued Jan 21, 2026
New Construction or Additions · Install 4" domestic water service, storm and sanitary curb traps complete with fresh air inlets and main house drains, install backflow as per plans
- Issued Jan 13, 2026
Alterations · For minor construction work at the subject property in accordance with all applicable provisions of the Philadelphia Code, all references codes and standards, and the attached EZ Standard, where included. Deviation from this standard shall result in permit revocation. A separate permit from the Philadelphia Department of Streets is required for any sidewalk and street closures. All means of pedestrian protection required at the site in accordance with the Philadelphia Building Code Chapter 33 sh
- Issued Jan 6, 2026
New Construction or Additions · Install 4" domestic water service, storm and sanitary curb traps complete with fresh air inlets and main house drains as per plans
- Issued Jan 6, 2026
Alterations · AMEND 01-28-2026 1" water service Replace/ Install 3/4" water service, storm and sanitary curb traps complete with fresh air inlets and main house drains
- Issued Dec 4, 2025
Alterations · Install 4- roof top drains; 1- floor drain; 1- backflow device as per plans, Amendment ,Below slab rough in for bathroom and lavatory sink.
- Issued Dec 4, 2025
Alterations · INSTALL SANITARY & STORM CT's, FAI's, MD's AND 2" WDP.
- Issued Dec 2, 2025
New Construction or Additions · AMENDMENT 6/4/2026 REVISION TO MATERIALS SCHEDULE AND JOINING METHODS. NEW CONSTRUCTION OF APARTMENT BUILDING. INTERIOR INSTALLATION OF DRAINAGE, WASTE, VENT, AND WATER SUPPLY FOR LISTED FIXTURES. ALL WORK TO BE PERFORMED IN STRICT COMPLIANCE WITH 2018 PPC AND APPROVED PLANS.
- Issued Nov 21, 2025
New Construction or Additions · NEW CONSTRUCTION OF MULTI UNIT APARTMENT BUILDING WITH VACANT COMMERCIAL SPACE AND ROOF DECK. INTERIOR INSTALLATION OF DRAINAGE, WASTE, VENT, AND WATER SUPPLY FOR LISTED FIXTURES. VENTING TO BE DEISGNED AND INSTALLED IN ACCORDANCE WITH THE BASE CODE. MATERIALS LOCATED IN AND TO BE SERVING COMMERCIAL SPACE WILL BE METALLIC TO ROOF EXTENSION. ALL WORK WILL BE PERFORMED IN STRICT COMPLIANCE WITH 2018 PPC AND APPROVED PLANS.
- Issued Oct 22, 2025
Alterations · For minor construction work at the subject property in accordance with all applicable provisions of the Philadelphia Code, all references codes and standards, and the attached EZ Standard, where included. Deviation from this standard shall result in permit revocation. A separate permit from the Philadelphia Department of Streets is required for any sidewalk and street closures. All means of pedestrian protection required at the site in accordance with the Philadelphia Building Code Chapter 33 sh
- Issued Oct 21, 2025
New Construction or Additions · AMENDMENT 12/11/2025 REVISED MATERIAL SCHEDULE AS SPECIFIED ON PLANS. ALL MATERIALS USED FOR ANY COMMERCIAL SPACES SHALL BE METALLIC TO ROOF EXTENSION. ALL WORK TO BE PERFORMED IN STRICT COMPLIANCE WITH 2018 PPC AND APROVED PLANS. NEW CONSTRUCTION OF 94 DWELLING BUILDING. EXTERIOR INSTALLATION OF CURB TRAP, FAI, MAIN DRAIN, AND 4" WATER DISTRIBUTION PIPE. INTERIRO INSTALLATION OF DRAINAGE, WASTE, VENT, AND WATER SUPPLY FOR LISTED FIXTURES. VENTING TO BE DESIGNED AND INSTALLED IN ACCORDANCE WITH
- Issued Oct 9, 2025
Addition and/or Alterations · Mechanical / Fuel Gas Permit for combo RP-2025-003145
- Issued Oct 9, 2025
Alterations · Amend Permit 3/24/2026 - Revisions to Foundation due to location of plumbing stack pipes within pockets Plumbing Permit (Water Distribution) for combo RP-2025-003145
- Issued Oct 9, 2025
Alterations · Plumbing Permit (Exterior Building Drainage) for combo RP-2025-003145
- Issued Oct 8, 2025
Addition and/or Alterations · Mechanical / Fuel Gas Permit for combo RP-2025-006615
- Issued Oct 8, 2025
Alterations · Plumbing Permit (Exterior Building Drainage) for combo RP-2025-006615
- Issued Oct 8, 2025
Alterations · Plumbing Permit (Water Distribution) for combo RP-2025-006615
- Issued Sep 11, 2025
Alterations · Plumbing Permit (Interior) for combo CP-2025-003789
- Issued Sep 5, 2025
Rough-In · Rough-In Permit for PP-2025-011150 Install 70 water closets; 70 lavatories; 55 kitchen sinks; 70 tub/shower; 55 water heaters; 55 water boxes/laundry; 3 floor drains; 1 floor sink(other) to include necessary piping as per plans
- Issued Aug 28, 2025
New Construction or Additions · INSTALL SANITARY & STORM CT's, FAI's, MD's & 2" WDP.
- Issued Aug 7, 2025
Alterations · INTERIOR ALTERATIONS TO EXISTING BUILDING AS SPECIFIED: The scope of work for this project is for the installation of all subgrade sanitary waste & vent piping, installation of the stormwater system, and the delivery of a domestic water service to the building. A plumbing fixture schedule has been added to the plans for the floor drains, cleanouts, and rainwater conductors to be installed under this phase of the work. No domestic water piping, water heaters, insulation, or penetrations of fire r
- Issued Jul 31, 2025
Alterations · Install 1- lavatory; 1- water closet; 1- floor drain; 1- instant water heater to include piping as per plans
- Issued Jul 17, 2025
Alterations · INTERIOR ALTERATIONS TO EXISTING CLINIC. INSTALLATION OF DRAINAGE, WASTE, VENT, AND WATER SUPPLY FOR LISTED FIXTURES. INSTALLATION OF MEDICAL GAS PIPING, OUTLETS AND EQUIPMENT IN ACCORDANCE WITH NFPA 99. VENTING TO BE DESIGNED AND INSTALLED IN ACCORDANCE WITH SECTION 919 PHILADELPHIA SINGLE STACK VENT SYSTEM. ALL MATERIALS TO BE METALLIC. ALL WORK TO BE PERFORMED IN STRICT COMPLIANCE WITH 2018 PPC AND APPROVED PLANS.
Track this owner
We'll flag their next deal, permit, or filing — usually before the neighbors know.
Entities are grouped by a normalized name from the public record; a separate legal entity per building is common, so some portfolios span several related names. Sources: Phila. Dept. of Records (deeds), L&I (permits & violations), Dept. of Revenue (tax delinquencies), reflecting the record as of our last weekly ingest. Verify independently before relying on it.
Last generated August 1, 2026.