23 permits · 1 violation
- Records on file
- 24
Permits (as owner)
23 entries
- Issued Jul 9, 2026
Addition and/or Alterations · FOR MECHANICAL SYSTEM ALTERATION. ** ALL WORK TO BE DONE PER APPROVED PLANS.** IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK.** SEPARATE PERMITS REQUIRED FOR ALL OTHER WORK.**
- Issued Jul 8, 2026
Addition and/or Alterations · FORA MECHANICAL SYSTEM UPGRADE TO ACCOMMODATE A PORTION OF THE 15TH FLOOR OF AN EXISTING STRUCTURE. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK.
- Issued Jun 12, 2026
Addition and/or Alteration · Install 86 light fixture, 6 exit, 29 switch, 60 receptacle, 6 furniture power, 3 floor receptacle, 15 equipment power. Relocate 1 208/120 volt panel. Fire Alarm: Install 6 speaker/strobe, 4 strobes, 1 relay. ALL WORK IS TO BE DONE ACCORDING TO APPROVED DRAWINGS-2017 NEC,2016 NFPA-72.
- Issued Jun 11, 2026
Addition and/or Alteration · Install (28) Category 6, Plenum data cables
- Issued Jun 10, 2026
Addition and/or Alteration · Install light fixtures, switch. Relocate exit lights. Install receptacles, equipment, and power. Fire Alarm: Install 2 speaker/strobe, 10 strobe, 1 relay. ALL WORK PER APPROVED PLANS
- Issued Jun 1, 2026
Alterations · Furnish and install (23) plumbing fixtures, (7) water closets, (2) urinals, (6) lavatories, (3) kitchen sinks, (3) hot water heaters and (2) electric water coolers, connecting to existing piping.
- Issued Jun 1, 2026
Alterations · Furnish and install (3) plumbing fixtures, (2) kitchen sinks and (1) hot water heater with piping, connecting to existing rough-in.
- Issued May 18, 2026
Addition and/or Alterations · EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the relocation of sprinkler heads as per attached standards. Deviations from these standards require submission of construction and site plans. RELOCATE (86) SPRINKLER HEADS ON THE 15TH FLOOR, PER NFPA 13
- Issued May 14, 2026
Addition and/or Alterations · EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the relocation of sprinkler heads as per attached standards. Deviations from these standards require submission of construction and site plans. RELOCATE (20) SPRINKLER HEADS, PER NFPA 13 AND LOCAL CODES
- Issued May 13, 2026
1 units
Addition and/or Alteration · FOR A LEVEL II INTERIOR ALTERATIONS TO A PORTION OF AN EXISTING STRUCTURE. BUILDING IS FULLY SPRINKLERED. ALL WORK TO BE DONE PER APPROVED PLANS. ** IF FIELD CONDITIONS VARY CONTACT DESIGN PROFESSIONAL PRIOR TO THE START OF ANY WORK.** SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK.**
- Issued May 12, 2026
Alterations · Remove and replace (2) plumbing fixtures, (1) kitchen sink and (1) hand sink with faucets, connecting to existing piping. *WITHOUT PIPING*
- Issued May 12, 2026
Addition and/or Alteration · Furnish and install seventy-two (72) Category 6 plenum rated cables to workstations.
- Issued May 7, 2026
1 units
Addition and/or Alteration · LEVEL II INTERIOR ALTERATIONS (NO CHANGE IN OCCUPANCY) FOR RENOVATIONS TO EXISTING OFFICE SPACE ON THE 16TH FLOOR OF AN EXISTING HIGH-RISE BUILDING AS PER APPROVED PLANS. EXISTING BUILDING IS FULLY SPRINKLERED. **IEBC2018**SEPARATE PERMITS REQUIRED FOR ANY MEP OR FIRE SUPPRESSION WORK**
- Issued May 5, 2026
Addition and/or Alterations · EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the relocation of sprinkler heads as per attached standards. Deviations from these standards require submission of construction and site plans. RELOCATE (36) SPRINKLER HEADS, PER NFPA 13
- Issued Apr 29, 2026
1 units
Addition and/or Alteration · LEVEL II INTERIOR ALTERATIONS (NO CHANGE OF OCCUPANCY) ALTERATIONS TO INCLUDE PARTIAL DEMOLITION AND LEVEL II ALTERATIONS TO INCLUDE THE ERECTION OF PARTITION WALLS, PROVIDE FINISHES/FURNISHINGS AND ACCESSIBILITY IMPROVEMENTS THROUGHOUT THE 15th FLOOR SUITE 1500 IN AN EXISTING HIGH-RISE BUILDING AS PER APPROVED PLANS. EXISTING BUILDING FULLY SPRINKLERED. *2018 IEBC REVIEW* *************************SEPARATE PERMITS REQUIRED FOR ANY ELECTRICAL, MECHANICAL OR FIRE SUPPRESSION WORK***************
- Issued Dec 8, 2025
Addition and/or Alteration · Fire Alarm: Install 20 speaker/strobe, 1 relay, 1 power supply as per 2016 NFPA 72.
- Issued Dec 3, 2025
Addition and/or Alteration · Install 186 light fixture, 12 exit, 62 switch, 114 receptacles, 6 floor receptacles, 13 equipment power.
- Issued Nov 17, 2025
Addition and/or Alterations · FOR A NEW MECHANICAL WORK TO ACCOMMODATE A PORTION OF The 3RD FLOOR LEVEL OF AN EXISTING STRUCTURE. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS REQUIRED FOR ALL OTHER WORK.
- Issued Nov 13, 2025
Addition and/or Alterations · EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the relocation of sprinkler heads as per attached standards. Deviations from these standards require submission of construction and site plans. Relocate 108 Sprinkler Heads
- Issued Nov 13, 2025
Alterations · F&I Sanitary & Domestic Water Piping F&I (2) New SInks F&I (2) Instahot Water Heaters F&I (2) Water Filters ALL WORK PERFORMED IN ACCORDANCE WITH 2018 PPC AND EZ STANDARD
- Issued Nov 10, 2025
Addition and/or Alteration · -Furnish & Install (87) Category 6/6A Plenum Cables for Data -Furnish & Install A/V HDMI & USB Cabling -Furnish & Install Composite Plenum Cables for Access Control Systems / Install System -Furnish & Install Category 5e Plenum Cables for Sound Masking System / Install Speakers
- Issued Nov 6, 2025
Addition and/or Alteration · Additions to existing fire alarm system for existing elevator according to plans. 1 Heat detector 1 shut trip In accordance with NFPA 2016 & The Philadelphia Fire code 2016
- Issued Nov 6, 2025
1 units
Addition and/or Alteration · FOR A LEVEL II INTERIOR ALTERATIONS TO A PORTION OF THE 3RD FLOOR LEVEL OF AN EXISTING STRUCTURE. ALTERATIONS TO INCLUDE SELECTIVE DEMOLITION AND THE ERECTION OF PARTITION WALLS, PROVIDE FINISHES/FURNISHINGS, AND ACCESSIBILITY IMPROVEMENTS THROUGHOUT.** BUILDING IS FULLY SPRINKLERED. **ALL WORK TO BE DONE PER APPROVED PLANS.** IF FIELD CONDITIONS VARY CONTACT DESIGN PROFESSIONAL PRIOR TO THE START OF ANY WORK.** SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK.**
Violations
1 entry
- Violation Mar 24, 2026OPEN
SUPPRESSION SYSTEM TESTING & MAINTENANCE
Track this owner
We'll flag their next deal, permit, or filing — usually before the neighbors know.
Entities are grouped by a normalized name from the public record; a separate legal entity per building is common, so some portfolios span several related names. Sources: Phila. Dept. of Records (deeds), L&I (permits & violations), Dept. of Revenue (tax delinquencies), reflecting the record as of our last weekly ingest. Verify independently before relying on it.
Last generated July 15, 2026.