Entity File · The Public Record
Contractor
Arif B Tas
3 permits
- Records on file
- 3
Built (as contractor)
3 entries
- Issued Mar 10, 2026
18 units
New Construction · FOR THE ERECTION OF AN ATTACHED STRUCTURE WITH ROOF DECK ACCESSED BY A PILOTHOUSE AS PER APPROVED PLANS. FOR USE AS A VACANT COMMERCIAL SPACE ON THE GROUND FLOOR FRONT (SEPARATE USE REGISTRATION IS REQUIRED) WITH MULTI-FAMILY (A TOTAL OF 18 DWELLING UNITS, INCLUDING 4 AFFORDABLE HOUSING UNITS PROVIDED) HOUSEHOLD LIVING. BUILDING TO BE FULLY SPRINKLERED PER NFPA 13. SEPARATE PERMITS REQUIRED FOR MEP & FP WORK.
- Issued Oct 28, 2025
4 units
New Construction · NEW CONSTRUCTION OF A THREE (3) STORY BUILDING WITH BASEMENT, PRIVATE ROOF DECK AND PILOT HOUSE FOR USE AS FOUR (4) DWELLING UNITS AS PER APPROVED PLANS. BUILDING TO BE FULLY SPRINKLERED PER NFPA 13. WORK TO INCLUDE UNDERPINNING TO BE MONITORED BY A PA LICENSED PE AT ALL TIMES. *2018 IBC REVIEW* **SEPARATE PERMITS REQUIRED FOR MEP & FIRE SUPPRESSION WORK**
- Issued Jul 31, 2025
4 units
New Construction · FOR THE ERECTION OF AN ATTACHED STRUCTURE WITH ROOF DECK, TWO (2) ROOF DECK ACCESS STRUCTURES ABOVE, AND BALCONIES AT THE FRONT (POPLAR ST. AND N. 2ND ST. FRONTAGES) AS PER APPROVED PLANS CONTAINING FOUR (4) DWELLING UNITS ON THE SECOND, THIRD, FOURTH, AND FIFTH FLOORS AND VACANT COMMERCIAL SPACE ON THE FIRST FLOOR.(SEPARATE USE REGISTRATION AND FIT-OUT REQUIRED PRIOR TO OCCUPANCY). SEPARATE PERMITS REQUIRED FOR MEP & FP WORKS. SEPARATE APPROVAL REQUIRED FROM PA L&I FOR ELEVATOR INSTALLATION.
Track this owner
We'll flag their next deal, permit, or filing — usually before the neighbors know.
Entities are grouped by a normalized name from the public record; a separate legal entity per building is common, so some portfolios span several related names. Sources: Phila. Dept. of Records (deeds), L&I (permits & violations), Dept. of Revenue (tax delinquencies), reflecting the record as of our last weekly ingest. Verify independently before relying on it.
Last generated August 1, 2026.