Entity File · The Public Record
Contractor
Armand Parllaku
46 permits
- Records on file
- 46
Built (as contractor)
46 entries
- Issued Aug 25, 2026
Addition and/or Alteration · Residential Service Equipment not exceeding a rating of 200 amps WITH NO INCREASE IN SERVICE SIZE as per Residential Service Equipment EZ Standard Rehab / new wiring through out
- Issued Aug 6, 2026
Addition and/or Alteration · Install 300 amp service, wiring throughout, smoke alarms ,em. lighting . Install automatic fire alarm system w/ smoke detection throughout nonresidential portion. ALL WORK IS TO BE DONE ACCORDING TO APPROVED DRAWINGS-2017 NEC,2016 NFPA-72.
- Issued Jul 29, 2026
Addition and/or Alteration · Residential Service Equipment not exceeding a rating of 200 amps WITH NO INCREASE IN SERVICE SIZE INCLUDING AN EMERGENCY DISCONNECT as per Residential Service Equipment EZ Standard Rehab / new wiring through out with new 200 amp service. Service size has not increased. Services will not exceed 200 amps
- Issued Jul 29, 2026
Addition and/or Alteration · Residential Service Equipment not exceeding a rating of 200 amps WITH NO INCREASE IN SERVICE SIZE INCLUDING AN EMERGENCY DISCONNECT as per Residential Service Equipment EZ Standard Rehab / new wiring through out with new 200 amp service. Service size has not increased. Services will not exceed 200 amps
- Issued Jul 29, 2026
Addition and/or Alteration · Residential Service Equipment not exceeding a rating of 200 amps WITH NO INCREASE IN SERVICE SIZE INCLUDING AN EMERGENCY DISCONNECT as per Residential Service Equipment EZ Standard Rehab / new wiring through out with new 200 amp service. Service size has not increased. Services will not exceed 200 amps
- Issued Jul 29, 2026
Addition and/or Alteration · Residential Service Equipment not exceeding a rating of 200 amps WITH NO INCREASE IN SERVICE SIZE INCLUDING AN EMERGENCY DISCONNECT as per Residential Service Equipment EZ Standard Rehab / new wiring through out with new 200 amp service. Service size has not increased. Services will not exceed 200 amps
- Issued Jul 23, 2026
Addition and/or Alteration · Electrical Permit for combo RP-2026-002009
- Issued Jul 17, 2026
Addition and/or Alteration · - Residential Service Equipment not exceeding a rating of 200 amps WITH NO INCREASE IN SERVICE SIZE as per Residential Service Equipment EZ Standard Interior Wiring
- Issued Mar 27, 2026
Addition and/or Alteration · Install 200amp service wiring throughout install light fixtures, outlets switches smoke detectors, grounding.
- Issued Mar 27, 2026
Addition and/or Alteration · Fishing new wiring from the existing panel to the bathroom only.
- Issued Mar 27, 2026
Addition and/or Alteration · New wiring from the existing panel to the bathroom only. Fishing from the existing electric panel.
- Issued Mar 25, 2026
Addition and/or Alteration · Rehab / new wiring through out with new 200 amp service
- Issued Mar 11, 2026
Addition and/or Alteration · Electrical Permit for combo RP-2026-001852 Install 200amp service wiring throughout install light fixtures, outlets switches smoke detectors, grounding
- Issued Jan 15, 2026
Addition and/or Alteration · Install 200 amp service wiring throughout install light fixtures, outlets switches smoke detectors, and grounding
- Issued Jan 15, 2026
Addition and/or Alteration · Install 200amp service wiring throughout install light fixtures, outlets switches smoke detectors, and grounding
- Issued Jan 15, 2026
Addition and/or Alteration · Install 200 amp service upgrade wiring throughout. Install light fixtures, outlets switches, smoke detectors, and grounding for 3 new bathrooms and rewire new kitchen.
- Issued Dec 9, 2025
Addition and/or Alteration · INSTALL 200 AMP ELECTRICAL SERVICE, METER SOCKET AND CIRCUIT BREAKER PANEL WITH PROPER GROUNDING AND BONDING. REWIRE HOUSE THROUGHOUT AND INSTALL LIGHTING, SWITCHES AND RECEPTACLE OUTLETS. INSTALL 120 VOLTS INTERCONNECTED SMOKE AND CO ALARMS. ALL WORK TO BE DONE ACCORDING TO THE 2017 NEC.
- Issued Oct 24, 2025
Addition and/or Alteration · INSTALL 200 AMP ELECTRICAL SERVICE AND THE MAIN CIRCUIT BREAKER PANEL WITH PROPER GROUNDING AND BONDING. REWIRE HOUSE THROUGHOUT. INSTALL LIGHTING, SWITCHES AND RECEPTACLES OUTLETS. INSTALL 120 VOLTS INTERCONNECTED SMOKE/CO ALARMS. ALL WORK TO BE DONEACCORDING TO THE 2017 NEC.
- Issued Sep 25, 2025
Addition and/or Alteration · Rehab / new wiring through out - Install 200amp service wiring throughout install light fixtures, outlets switches smoke detectors, grounding
- Issued Sep 25, 2025
Addition and/or Alteration · Rehab / new wiring through out -- Install 200amp service wiring throughout install light fixtures, outlets switches smoke detectors, grounding
- Issued Aug 15, 2025
Addition and/or Alteration · Rehab / new wiring through out with new 100 amp service
- Issued Aug 13, 2025
Addition and/or Alteration · Rehab / new wiring through out with new 200 amp service.
- Issued Jul 30, 2025
Addition and/or Alteration · Rehab / new wiring through out with new 200 amp service
- Issued Jul 18, 2025
Addition and/or Alteration · Install new electric throughout property and new service line 200amp
- Issued Jul 10, 2025
Addition and/or Alteration · Install 200amp service wiring throughout install light fixtures, outlets switches smoke detectors, grounding
Track this owner
We'll flag their next deal, permit, or filing — usually before the neighbors know.
Entities are grouped by a normalized name from the public record; a separate legal entity per building is common, so some portfolios span several related names. Sources: Phila. Dept. of Records (deeds), L&I (permits & violations), Dept. of Revenue (tax delinquencies), reflecting the record as of our last weekly ingest. Verify independently before relying on it.
Last generated September 16, 2026.