Entity File · The Public Record
Contractor
Arthur Abraham
146 permits
- Records on file
- 146
Built (as contractor)
146 entries
- Issued Jun 26, 2026
EZ Bathroom & Kitchen Remodel · EZ tub to shower replacement.
- Issued Jun 26, 2026
EZ Bathroom & Kitchen Remodel · Residential - EZ Bathroom & Kitchen Remodel
- Issued Jun 10, 2026
Alterations · direct replacement of existing bathtub shower unit with a partial walk-in shower unit.
- Issued Jun 5, 2026
Alterations · Replace house trap and fresh air inlet. Replace main house drain from between the house trap and front foundation wall.
- Issued Jun 3, 2026
EZ Bathroom & Kitchen Remodel · EZ tub to shower replacement EZ toilet Replacement EZ Sink Replacement
- Issued Jun 2, 2026
EZ Bathroom & Kitchen Remodel · EZ tub to shower replacement EZ replacement of existing sink
- Issued Jun 2, 2026
EZ Bathroom & Kitchen Remodel · Ez tub to shower replacement Ez toilet replacement
- Issued May 22, 2026
EZ Bathroom & Kitchen Remodel · Bathroom adaptations: convert existing bathroom tub to a walk-in shower 2ND Floor
- Issued May 22, 2026
EZ Bathroom & Kitchen Remodel · Bathroom adaptations 2nd floor convert existing bathroom tub to a custom roll-in shower
- Issued May 18, 2026
Alterations · Where the existing refrigerator is in the kitchen, we will install a stacked washer and dryer unit. This will require us to make a supply and install 2-inch drain connections in the basement. install duct to exterior for dryer. "Other" is referring to the supply and drain installation for the "washer machine" as noted above. specifically, the installation of the 2-inch drain connections and the supply.
- Issued May 12, 2026
EZ Bathroom & Kitchen Remodel · Tub to Shower Replacement Replace Existing Sink
- Issued May 11, 2026
EZ Bathroom & Kitchen Remodel · Replace bathtub with 54 x 30 shower pan.
- Issued May 11, 2026
EZ Bathroom & Kitchen Remodel · Replace bathtub with walk-in shower
- Issued May 4, 2026
Alterations · INSTALLATION OF TOILET AND LAV FOR NEWLY CONSTRUCTED HALF BATH
- Issued Apr 30, 2026
Alterations · Plumbing Permit (Interior) for combo RP-2026-003692
- Issued Apr 30, 2026
Alterations · Plumbing Permit (Interior) for combo RP-2026-003717
- Issued Apr 30, 2026
Alterations · Replacing all three plumbing fixtures at this location, including the toilet, sink, and bathtub shower unit.
- Issued Apr 29, 2026
EZ Bathroom & Kitchen Remodel · REPLACE tub with shower & toilet with ADA compliant toilet. *WITHOUT PIPING*
- Issued Apr 29, 2026
Alterations · Plumbing Permit (Interior) for combo RP-2026-002088
- Issued Apr 13, 2026
Alterations · Plumbing Permit (Interior) for combo RP-2026-003149
- Issued Apr 9, 2026
EZ Bathroom & Kitchen Remodel · EZ Tub to Shower replacement Sink and toilet will need to be removed for this tub to shower replacement, but the same exact sink and toilet will be reinstalled after and not replaced with different fixtures.
- Issued Apr 9, 2026
Alterations · Replace laundry connections and machine, replace soil pipe with pvc
- Issued Apr 9, 2026
Alterations · Plumbing Permit (Interior) for combo RP-2026-003145
- Issued Apr 6, 2026
EZ Bathroom & Kitchen Remodel · REPLACE tub with shower ~ Thank you.
- Issued Mar 31, 2026
EZ Bathroom & Kitchen Remodel · PHDC WORK ORDER: 217607 - Expand Existing Wall by 1 foot and 6 inches requiring us to demo the existing bedroom closet. -replacement of bathtub shower unit with partial walk-in shower unit. -Direct replacement of Sink with shorter sink/vanity -Direct replacement toilet with ADA compliant toilet. -Retile floor -Widen Door -remove Radiator
- Issued Mar 31, 2026
EZ Bathroom & Kitchen Remodel · EZ tub to shower replacement the sink and toilet will be uninstalled to make room for the new fixture replacement but after the new fixture replacement of the shower is complete, we will reinstall the existing toilet and sink. just wanted to note this here for full transparency but the same sink and toilet coming out will go back in after the replacement of the shower
- Issued Mar 19, 2026
Alterations · Replace house trap and fresh air inlet. Replace main house drain from between house trap and front foundation wall.
- Issued Mar 10, 2026
Alterations · Plumbing Permit (Interior) for combo RP-2026-001716
- Issued Mar 4, 2026
Alterations · Plumbing Permit (Interior) for combo RP-2026-001365
- Issued Mar 4, 2026
EZ Bathroom & Kitchen Remodel · EZ replacement of existing bathtub shower unit with a partial walk-in shower unit. EZ replacement of existing toilet with an ADA compliant toilet EZ replacement of existing sink with shorter sink/vanity
- Issued Feb 26, 2026
EZ Bathroom & Kitchen Remodel · EZ direct replacement of existing bathtub shower unit with partial walk-in shower unit. -The toilet and sink will not be replaced with anything new. but as there is minimal space in the bathroom they will have to be removed and saved for reinstallation after the shower has been properly installed.
- Issued Feb 18, 2026
Alterations · REPAIR/REPLACE CT, FAI & MD FROM TRAP TO FOUNDATION WALL.
- Issued Feb 17, 2026
EZ Bathroom & Kitchen Remodel · EZ direct replacement of existing bathtub shower unit with partial walk-in shower unit. EZ Direct replacement of existing toilet with ADA compliant toilet.
- Issued Feb 17, 2026
EZ Bathroom & Kitchen Remodel · EZ 1:1 Direct replacement of existing bathtub shower unit with a partial walk in shower unit.
- Issued Feb 9, 2026
Alterations · Plumbing Permit (Interior) for combo RP-2025-012538
- Issued Jan 30, 2026
EZ Bathroom & Kitchen Remodel · Replacement of existing bathtub shower unit with partial walk-in shower unit.
- Issued Jan 30, 2026
Alterations · Plumbing Permit (Interior) for combo RP-2025-012755
- Issued Jan 30, 2026
Alterations · Plumbing Permit (Interior) for combo RP-2026-000335
- Issued Jan 30, 2026
EZ Bathroom & Kitchen Remodel · Replacement of existing toilet with an ADA compliant toilet.
- Issued Jan 30, 2026
EZ Bathroom & Kitchen Remodel · Replacement of existing bathtub shower unit with partial walk in shower unit. Remove sink and toilet to be reinstalled
- Issued Jan 22, 2026
EZ Bathroom & Kitchen Remodel · 1:1 EZ replacement of the existing bathtub shower unit with a partial walk-in shower unit. 1:1 EZ replacement of the existing sink/vanity with an ADA compliant sink/ vanity. 1:1 EZ replacement of the existing toilet/ water closet with an ADA compliant toilet.
- Issued Jan 16, 2026
EZ Bathroom & Kitchen Remodel · EZ 1:1 replacement of shower/tub with partial walk-in shower in second floor full bathroom. EZ 1:1 replacement of the toilet in the second floor full bathroom EZ 1:1 replacement of toilet in 1st floor half bathroom
- Issued Jan 14, 2026
Alterations · Replace house trap and fresh air inlet. Replace main house drain from between house trap and front foundation wall. Replace 3/4' water service.
- Issued Jan 14, 2026
Alterations · Plumbing Permit (Interior) for combo RP-2025-013027
- Issued Jan 6, 2026
Alterations · Plumbing Permit (Interior) for combo RP-2025-012549
- Issued Jan 6, 2026
EZ Bathroom & Kitchen Remodel · 1:1 Replacement of existing bathtub shower unit with partial walk-in shower. 1:1 EZ replacement of existing sink with our accessible sink/vanity 1:1 EZ replacement of existing water closet with our ADA compliant toilet.
- Issued Jan 6, 2026
EZ Bathroom & Kitchen Remodel · Replacement of existing bathtub shower unit with a partial walk-in shower.
- Issued Dec 26, 2025
Alterations · Plumbing Permit (Interior) for combo RP-2025-011583
- Issued Dec 23, 2025
EZ Bathroom & Kitchen Remodel · Replace existing bathtub/shower with a partial walk-in shower. Replace existing toilet with an ADA-compliant toilet.
- Issued Dec 23, 2025
Alterations · Plumbing Permit (Interior) for combo RP-2025-012751
- Issued Dec 16, 2025
Alterations · Installation of two floor drains, six floor sinks, one lavatory, two mop sinks, two water closets and one grease interceptor as per submitted plans
- Issued Dec 15, 2025
EZ Bathroom & Kitchen Remodel · AMENDMENT 12/18/2025 REPLACE PIPING SERVING TOILET AND LAVATORY. REPLACE TUB WITH PARTIAL WALK IN SHOWER.
- Issued Dec 15, 2025
EZ Bathroom & Kitchen Remodel · REPLACE TUB WITH PARTIAL WALK IN SHOWER.
- Issued Dec 11, 2025
EZ Bathroom & Kitchen Remodel · PHDC WORK ORDER: 213127 EZ 1:1 replacement of all three-bathroom fixtures. This includes the Tub/shower, the lavatory, as well as the sink/vanity.
- Issued Dec 10, 2025
EZ Bathroom & Kitchen Remodel · Replace the bathtub. *WITHOUT PIPING*
- Issued Nov 25, 2025
EZ Bathroom & Kitchen Remodel · Installation of three-piece bathroom group in basement
- Issued Nov 25, 2025
Alterations · INTERIOR ALTERATIONS TO EXISTING BUILDING. INSTALLATION OF DRAINAGE, WASTE, VENT, AND WATER SUPPLY FOR LISTED FIXTURES CONENCTING TO EXISTING METALLIC PIPING. ALL PIPING UTILIZED AND LOCATED IN COMMERCIAL SPACE TO BE METALLIC TO ROOF EXTENSION. VENTING TO BE DESIGNED AND INSTALLED IN ACCORDANCE WITH SECTION 919 PHILADELPHIA SINGLE STACK VENT SYSTEM. ALL WORK TO BE PERFORMED IN STRICT COMPLIANCE WITH 2018 PPC AND APPROVED PLANS.
- Issued Nov 24, 2025
EZ Bathroom & Kitchen Remodel · Replacement of the existing toilet with an ADA compliant toilet
- Issued Nov 14, 2025
EZ Bathroom & Kitchen Remodel · EZ Bathroom Alteration consisting of a 1:1 fixture replacement of the existing bathtub/shower unit, as well as the 1:1 EZ replacement of the existing toilet. No alterations will be made to the existing plumbing, drain, or trap size or location.
- Issued Nov 3, 2025
EZ Bathroom & Kitchen Remodel · EZ 1:1 Replacement of Toilet, Vanity/sink, and bathtub shower unit.
- Issued Nov 3, 2025
EZ Bathroom & Kitchen Remodel · 1:1 EZ replacement of bathtub shower/unit
Track this owner
We'll flag their next deal, permit, or filing — usually before the neighbors know.
Entities are grouped by a normalized name from the public record; a separate legal entity per building is common, so some portfolios span several related names. Sources: Phila. Dept. of Records (deeds), L&I (permits & violations), Dept. of Revenue (tax delinquencies), reflecting the record as of our last weekly ingest. Verify independently before relying on it.
Last generated July 17, 2026.