Entity File · The Public Record
Contractor
Besjana Arif
3 permits
- Records on file
- 3
Built (as contractor)
3 entries
- Issued Sep 11, 2025
Addition and/or Alteration · FOR INTERIOR ALTERATIONS TO AN EXISTING SINGLE-FAMILY STRUCTURE AS PER APPROVED PLAN. *SEPARATE PERMITS REQUIRED FOR ELECTRICAL, PLUMBING, AND MECHANICAL WORK*
- Issued Aug 8, 2025
1 units
Commercial Make Safe Permit · FOR THE REPAIR OF THE FRONT WALL AND THE INSTALLATION OF STARBOLTS TO RESOLVE CASE CF-2023-080558. ALL WORK TO BE DONE PER APPROVED PLANS AND ENGINEERING INSPECTION LETTER. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. A SEPARATE PERMIT IS REQUIRED FOR ANY ADDITIONAL ALTERATIONS THAT ARE NOT SPECIFICALLY ADDRESSED ON CASE CF-2023-080558. "IN ACCORDANCE WITH CODE BULLETIN PM-1801, A PA PROFESSIONAL ENGINEER IS REQUIRED TO MONITOR REPAIRS MADE UNDER THIS PERMIT.
- Issued Aug 5, 2025
Make Safe Permit For RP · MAKE SAFE PERMIT TO COMPLY WITH CF-2025-065150 TO INCLUDE REPAIRS/REPLACEMENT OF EXTERIOR WALLS AND FRAMING PER APPROVED PLANS AND IN ACCORDANCE WITH CODE BULLETIN PM-1801. LICENSED PA PROFESSIONAL ENGINEER IS REQUIRED TO MONITOR REPAIRS MADE UNDER THIS PERMIT. THE ENGINEER MUST SUBMIT A SEALED STATEMENT TO THE DEPARTMENT CONFIRMING THAT THE STRUCTURE IS IN SOUND CONDITION AT COMPLETION. SEPARATE PERMITS REQUIRED FOR ADDITIONAL ALTERATIONS NOT ADDRESSED IN APPROVED PLANS.
Track this owner
We'll flag their next deal, permit, or filing — usually before the neighbors know.
Entities are grouped by a normalized name from the public record; a separate legal entity per building is common, so some portfolios span several related names. Sources: Phila. Dept. of Records (deeds), L&I (permits & violations), Dept. of Revenue (tax delinquencies), reflecting the record as of our last weekly ingest. Verify independently before relying on it.
Last generated August 1, 2026.