Entity File · The Public Record
Company / LLC
Best Friends Philly LLC
10 permits
- Records on file
- 10
Permits (as owner)
10 entries
- Issued Jul 7, 2026
Sign · FOR ERECTION OF ONE (1) ILLUMINATED ACCESSORY FLAT WALL SIGN ON EXISTING STRUCTURE. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS REQUIRED FOR ALL OTHER WORK, INCLUDING ALL ELECTRICAL WORK.
- Issued Jun 16, 2026
Signs (Accessory / Non-Accessory) · FOR ERECTION OF ONE (1) ILLUMINATED ACCESSORY FLAT WALL SIGN ON EXISTING STRUCTURE. SIZE AND LOCATION AS SHOWN ON THE APPLICATION / PLAN.
- Issued Jun 2, 2026
Shelter/Platform · Scaffold shall not be anchored to building façade in any way(As per PHC conditions).
- Issued Dec 31, 2025
Addition and/or Alteration · Install wiring for restaurants , make equipment connections of outlets, lights, fans, and HVAC units ,from existing service. ALL WORK IS TO BE DONE ACCORDING TO APPROVED DRAWINGS-2017 NEC. **NO FIRE ALARM ON THIS PERMIT**
- Issued Nov 13, 2025
Addition and/or Alterations · EZ KITCHEN FIRE SUPPRESSION- For the installation of New Wet Chemical Kitchen Fire Suppression System as per attached standard. Deviations from these standards require submission of construction and site plans. To install a wet chemical kitchen fire suppression system for 15'-0" hood
- Issued Nov 6, 2025
Addition and/or Alterations · FOR INSTALLATION OF TYPE-1 COMMERCIAL KITCHEN EXHAUST HOOD AND HVAC APPLIANCES, EQUIPMENT, DUCTWORK AND REGISTERS/DIFFUSER PER APPROVED PLANS AND MANUFACTURER'S SPECIFICATIONS.
- Issued Oct 21, 2025
Addition and/or Alterations · EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the relocation of sprinkler heads as per attached standards. Deviations from these standards require submission of construction and site plans. Relocate 10 existing sprinkler heads for the renovation of a restaurant.
- Issued Sep 10, 2025
Addition and/or Alterations · EZ KITCHEN FIRE SUPPRESSION- For the installation of New Wet Chemical Kitchen Fire Suppression System as per attached standard. Deviations from these standards require submission of construction and site plans. To install a wet chemical kitchen fire suppression system for a 6'-0" hood
- Issued Sep 9, 2025
Addition and/or Alterations · FOR THE INSTALLATION OF ONE (1) TYPE 1 COMMERCIAL KITCHEN EXHAUST HOOD AT THE 3RD FLOOR WITH ASSOCIATED EXHAUST FAN, MAKEUP AIR SYSTEM, AND DUCTWORK. ALL WORK TO BE DONE PER APPROVED PLANS AND IN ACCORDANCE WITH 2018 IMC AND MANUFACTURER SPECIFICATIONS. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK.
- Issued Aug 11, 2025
1 units
Addition and/or Alteration · LEVEL II ALTERATIONS WITH PARTIAL CHANGE OF OCCUPANCY (PHASES 2 & 3 - SEE CP-2024-002786 FOR PHASE 1) TO CREATE A SIT-DOWN RESTAURANT ON THE BASEMENT THROUGH THIRD FLOORS OF AN EXISTING BUILDING AS PER APPROVED PLANS. WORK TO ALSO INCLUDE ALTERATIONS AT ROOF LEVEL. BUILDING FULLY SPRINKLERED. *2018 IEBC REVIEW* **SEPARATE PERMITS REQUIRED FOR MEP & FIRE SUPPRESSION WORK**
Track this owner
We'll flag their next deal, permit, or filing — usually before the neighbors know.
Entities are grouped by a normalized name from the public record; a separate legal entity per building is common, so some portfolios span several related names. Sources: Phila. Dept. of Records (deeds), L&I (permits & violations), Dept. of Revenue (tax delinquencies), reflecting the record as of our last weekly ingest. Verify independently before relying on it.
Last generated July 15, 2026.