Built (as contractor)
55 entries
- Issued Jun 23, 2026
Addition and/or Alteration · INSTALLING FOUR STROBES AND MANUAL PULL STATION FOR GYM FITOUT AS PER 2016 NFPA 72. TIED TO EXISTING SYSTEM.
- Issued Jun 18, 2026
Addition and/or Alteration · INSTALLATION FOR NON-REQUIRED FIRE ALARM SYSTEM FOR R-3 OCCUPANCY ,CARBON MONOXIDE ALARMS, AS REQUESTED BY CLIENT. ALL SMOKE DETECTORS IN BED ROOMS WILL HAVE LOW FREQUENCY SOUNDER BASES WIRED AS SINGLE STATION. PER APPROVED DRAWINGS-2017 NEC,2016 NFPA-72. If you wish to use this other than a R-3 you will need approved zoning as you were denied PER: ZP-2023-010174: Refused (Residential - Change of Use) Proposing to change the use of an existing Single-Family Residence into a PERSONAL CARE HOME
- Issued Jun 16, 2026
Addition and/or Alteration · Install fire alarm system to eye doctor's office. All work to be performed according to the 2017 NEC, 2016 NFPA 72 and per approved plans.
- Issued Jun 10, 2026
Addition and/or Alteration · Furnish and install a fire alarm system for a tenant fit out for a sit down restaurant. Work includes installation of the fire alarm control panel (FACP), annunciator(s), initiating devices, notification appliances, control modules, monitoring equipment, and all associated wiring, All work to be done according to the 2017 NEC, 2016 NFPA 72 and per approved plans.
- Issued May 26, 2026
Addition and/or Alteration · Furnish and install fire alarm system. All work to be perform according to the 2017 NEC, 2016 NFPA 72 and per approved plans.
- Issued May 26, 2026
Addition and/or Alteration · INSTALLATION OF WALL-MOUNTED SPEAKERS IN NEW THIRD-FLOOR APARTMENTS, 2 SPEAKER/STROBES AND STROBE IN 1 ADA APT. ALL INTEGRATED INTO THE EXISTING FIRE ALARM. ALL WORK PER APPROVED PLANS
- Issued May 7, 2026
Addition and/or Alteration · INSTALLATION OF FIRE ALARM SYSTEM IN THE BASEMENT AND FIRST FLOOR .ALL WORK IS TO BE DONE ACCORDING TO APPROVED DRAWINGS-2017 NEC,2016 NFPA-72.
- Issued May 7, 2026
Addition and/or Alteration · INSTALLATION OF FIRE ALARM SYSTEM AS PER 2016 NFPA 72.
- Issued May 5, 2026
Addition and/or Alteration · REPLACE EXISTING CONVENTIONAL FACP WHICH IS END-OF-LIFE AND IS NO LONGER SUPPORTED BY MANUFACTURER, INCLUDING ANNUNCIATOR AND INITIATING DEVICES, TO BE REPLACED WITH ADDRESSABLE SYSTEM. PURPOSE OF REPLACEMENT IS TO ACCOMMODATE ELEVATOR MODERNIZATION FOR FIRE SERVICE RECALL. RELAY MODULES TO BE ADDED FOR ELEVATOR RECALL AS PER CODE REQUIREMENTS. **NO WORK BEING DONE IN EXISTING RESIDENTIAL UNITS, ALL NOTIFICATION DEVICES THROUGHOUT TO REMAIN AS-IS/WHERE-IS** ALL EXISTING WORK IS TO BE DONE ACCORD
- Issued May 4, 2026
Addition and/or Alteration · INSTALLATION OF FIRE ALARM SYSTEM. All work per approved plans
- Issued May 4, 2026
Addition and/or Alteration · Install a fire alarm for the restaurant. All work per approved plans
- Issued Apr 28, 2026
Addition and/or Alteration · INSTALLATION OF FIRE ALARM SYSTEM AS PER 2016 NFPA 72. ALL REQUIRED HARDWIRE SMOKE ALARMS TO BE INSTALLED BY ELECTRICIAN.
- Issued Apr 23, 2026
Addition and/or Alteration · INSTALLATION FOR FIRE ALARM SYSTEM AS PER 2016 NFPA 72.
- Issued Apr 20, 2026
Addition and/or Alteration · Furnish and install a fire alarm system, including all required fire alarm control equipment, initiating devices, notification appliances, wiring, terminations, programming, and testing. All devices shall be properly interconnected to provide required detection, notification, and system monitoring. All work shall be performed in accordance with the 2016 NFPA 72, the 2017 NEC and per approved plans.
- Issued Apr 20, 2026
Addition and/or Alteration · INSTALLATION FOR FIRE ALARM SYSTEM FOR MIXED OCCUPANCY AS PER 2016 NFPA 72.
- Issued Apr 10, 2026
Addition and/or Alteration · Furnish and install a fire alarm system for the office fit-out on the third and fourth floors. Work includes installation of initiating devices, notification appliances, wiring, terminations, and system components required for each floor. Provide interconnection and wiring from the third and fourth floor systems to the existing main fire alarm control panel located on the first floor. All work shall be performed in accordance with 2016 NFPA 72, the 2017 NEC and per approved plans.
- Issued Apr 8, 2026
Addition and/or Alteration · INSTALL FIRE ALARM FITOUT FOR NEW ENTERTAINMENT VENUE ,INSTALL RELAY TO SHUTDOWN SOUND EQUIPMENT & GAME LIGHTS UPON ALARM CONDITION, BASED ON APPROVED PLANS-2017 NEC,2016 NFPA-72.
- Issued Mar 31, 2026
Addition and/or Alteration · INSTALLATION OF AUTOMATIC FIRE ALARM SYSTEM W/ LOW FREQUENCY SOUNDERS IN LIVING RMS AND BEDROOMS. -2017 NEC,2016 NFPA-72, **SEPARATE ELECTRICAL PERMIT REQ'D TO COMPLY FOR THE OTHER ELECTRICAL WORK AND REQ'D MULTIPLE STATION SMOKE/CO ALARMS IN THE RESIDENTIAL UNIT**
- Issued Mar 31, 2026
Addition and/or Alteration · RELOCATING MANUAL PULL STATION AND HORN/STROBE. INSTALLING TWO NEW HORN/STROBE TO AN EXISTING FIRE ALARM SYSTEM. ALL WORK PER APPROVED PLANS
- Issued Mar 18, 2026
Addition and/or Alteration · Install fire alarm system as per 2016 NFPA 72.
- Issued Mar 10, 2026
Addition and/or Alteration · INSTALLATION OF NEW FIRE ALARM SYSTEM PER APPROVED DRAWINGS-2017 NEC , 2016 NFPA-72.
- Issued Mar 9, 2026
Addition and/or Alteration · INSTALLING A/V DEVICES AND SK-RELAY TO AN EXISTING FIRE ALARM SYSTEM AS PER 2016 NFPA 72. SK-RELAY TO SHUT OFF A/V DEVICES INCASE OF FIRE. SK-5820XL PANEL LOCATED IN THE BASEMENT OF THE BUILDING.
- Issued Mar 5, 2026
Addition and/or Alteration · INSTALLATION OF FIRE ALARM SYSTEM. MONITOR MODULE TO MONITOR THE KITCHEN SUPPRESSION SYSTEM. ALL WORK IS TO BE DONE ACCORDING TO APPROVED DRAWINGS-2017 NEC,2016 NFPA-72.
- Issued Feb 26, 2026
Addition and/or Alteration · INSTALLATION OF FIRE ALARM SYSTEM FOR MIXED OCCUPANCY. ALL WORK IS TO BE DONE ACCORDING TO APPROVED DRAWINGS-2017 NEC,2016 NFPA-72. -NOTED: ADDED HEAT DETECTOR TO COMMERCIAL BATHROOM-
- Issued Feb 19, 2026
Addition and/or Alteration · Installation of a new fire alarm system for a mixed-occupancy building. System to include all required control equipment, initiating devices, notification appliances, and associated wiring. Tie-in to existing sprinkler system tamper switches and waterflow switch. Provide a weatherproof horn/strobe connected to the waterflow switch for exterior notification. All work to be done according to the 2017 NEC, 2016 NFPA 72 and per approved plans.
- Issued Feb 18, 2026
Addition and/or Alteration · INSTALLATION OF NEW FIRE ALARM DEVICES IN BUILDING B WHICH WAS DESTROYED BY FIRE IN RELATION TO CP-2025-004908. REPLACE EXISTING CONVENTIONAL FACU WHICH IS END-OF-LIFE AND IS NO LONGER SUPPORTED BY MANUFACTUER, INCLUDING ANNUNCIATOR AND CELLULAR, TO BE REPLACED WITH ADDRESSABLE SYSTEM WITH IDC-6 ZONE CARDS COMPATIBLE WITH EXISTING CONVENTIONAL DEVICES. **NO WORK BEING DONE IN EXISTING RESIDENTIAL UNITS OR HALLWAYS, ALL DEVICES TO REMAIN AS-IS/WHERE-IS** ALL EXISTING WORK IS TO BE DONE ACCORDING
- Issued Feb 17, 2026
Addition and/or Alteration · INSTALLATION OF FIRE ALARM SYSTEM AS PER 2016 NFPA 72.
- Issued Feb 17, 2026
Addition and/or Alteration · INSTALLATION OF FIRE ALARM SYSTEM FOR MIXED OCCUPANCY AS PER 2016 NFPA 72
- Issued Feb 10, 2026
Addition and/or Alteration · Installation of fire alarm In accordance with NFPA 72, 2016 & The Philadelphia Fire Code 2018
- Issued Jan 29, 2026
Addition and/or Alteration · Replace existing failed FACU ,in existing location , w/ addressable FACU . annunciator, cellular communicator, initiating devices for elevator & fire pump . ALL WORK IS TO BE DONE ACCORDING TO APPROVED DRAWINGS-2017 NEC,'18 IEBC. **NO WORK BEING DONE IN ANY OF THE RESIDENTIAL UNITS**
- Issued Jan 28, 2026
Rough-In · Rough-In Permit for EP-2026-000657 INSTALLATION OF NEW FIRE ALARM DEVICES IN B BUILDING WHICH WAS DESTROYED BY FIRE IN RELATION TO CP-2025-004908. REPLACE EXISTING CONVENTIONAL FACU WHICH IS END-OF-LIFE AND IS NO LONGER SUPPORTED BY MANUFACTUER, INCLUDING ANNUNCIATOR AND CELLULAR, TO BE REPLACED WITH ADDRESSABLE SYSTEM WITH IDC-6 ZONE CARDS COMPATIBLE WITH EXISTING CONVENTIONAL DEVICES. **NO WORK BEING DONE IN EXISTING RESIDENTIAL UNITS OR HALLWAYS, ALL DEVICES TO REMAIN AS-IS/WHERE-IS** ALL EX
- Issued Jan 22, 2026
Addition and/or Alteration · INSTALL COMPLETE FIRE ALARM SYSTEM W/ LOW FREQUENCY SOUNDERS IN ALL LIVING RMS AND BEDROOMS. ALL WORK IS TO BE DONE ACCORDING TO APPROVED DRAWINGS-2017 NEC,2016 NFPA-72.
- Issued Jan 7, 2026
Addition and/or Alteration · Install fire alarm system in a multi-family dwelling unit. All work to be done according to the 2017 NEC and per approved plans.
- Issued Jan 7, 2026
Addition and/or Alteration · INSTALLATION OF STROBES FOR FITOUT PER PLANS. IN ACCORDANCE WITH NFPA 72 2016 & THE PHILADELPHIA FIRE CODE 2018
- Issued Dec 17, 2025
Addition and/or Alteration · INSTALLING A NEW FIRE ALARM SYSTEM AS PER 2016 NFPA 72. INSTALL MONITOR MODULES FOR SYSTEM, INTERCONNECTIONS TO FIRE PUMP, TAMPER AND WATER FLOW ON EACH FLOOR. RELAY MODULES FOR FAN AND FIRE DAMPERS SHUT DOWN. FIRE DAMPERS TO BE INSTALLED AND POWERED BY OTHERS.
- Issued Dec 10, 2025
Addition and/or Alteration · Installation of fire alarm system. ALL WORK IS TO BE DONE ACCORDING TO APPROVED DRAWINGS-2017 NEC,2016 NFPA-72.
- Issued Dec 2, 2025
Addition and/or Alteration · INSTALLING NAPCO COMMUNICATOR TO MONITOR EXISTING FIRELITE PANEL AS PER 2016 NFPA 72. EXISTING FIRELITE PANEL WIRED TO EXISTING EDWARDS RELAY MODULES. EXISTING RELAY MODULES ARE WIRED TO MAIN FIRE ALARM PANEL.
- Issued Nov 4, 2025
New Construction · Install complete fire alarm system .ALL WORK IS TO BE DONE ACCORDING TO APPROVED DRAWINGS-2017 NEC,2016 NFPA-72.
- Issued Oct 30, 2025
Addition and/or Alteration · INSTALLATION OF FIRE ALARM SYSTEM FOR MIXED OCCUPANCY. ALL WORK TO BE DONE ACCORDING TO THE 2017 NEC, 2016 NFPA 72 AND PER PLANS. ******************* A SEPARATE ELECTRICAL AND BUILDING PERMIT IS REQUIRE TO RESOLVE THE CASE (CF-2024-108551). *************
- Issued Oct 30, 2025
Addition and/or Alteration · INSTALL FIRE ALARM SYSTEM AND 120 VOLTS INTERCONNECTED SMOKE/CO ALARMS WITH BATTERY BACKUP FOR MIXED USED BUILDING. ALL WORK TO BE DONE ACCORDING TO THE 2017 NEC, 2016 NFPA 72 AND PER PLANS.
- Issued Oct 16, 2025
Addition and/or Alteration · Install new manual pull station and new notification devices using existing IFP-75 FACP as per 2016 NFPA 72.
- Issued Oct 7, 2025
Addition and/or Alteration · INSTALLATION OF FIRE ALARM SYSTEM FOR MIXED OCCUPANCY - NOTED: Heated detector in commercial bathroom Heated weather poof enclosure for annunciator panel According to NFPA 2016, Philadelphia Fire code 2018
- Issued Oct 2, 2025
Addition and/or Alteration · INSTALLATION OF FIRE ALARM SYSTEM AS PER 2016 NFPA 72. TWO RELAY MODULE TO SHUT DOWN NEW FANS. FOUR RELAYS FOR ELEVATORS INTERFACE FOR RECALLS AS PER CODE. TWO MONITOR MODULES FOR WATERFLOW AND TAMPER SWITCH. WEATHER PROOF HORN/STROBE TIE THROUGH FLOW SWITCH.
- Issued Sep 26, 2025
Addition and/or Alteration · INSTALLATION OF FIRE ALARM SYSTEM FOR I-1 OCCUPANCY. DUAL MONITOR MODULE TO BE WIRED TO THE SPRINKLER SYSTEM AND THE SINGLE MONITOR MODULE TO BE WIRED TO THE HOOD SUPPRESSION SYSTEM. ALL WORK IS TO BE DONE ACCORDING TO APPROVED DRAWINGS-2017 NEC,2016 NFPA-72.
- Issued Sep 24, 2025
Addition and/or Alteration · SEVEN EXISTING DEVICES WILL BE REMOVED. THE PULL STATION AND HORN/STROBE LOCATED NEAR THE FRONT ENTRANCE WILL BE RELOCATED. TWO NEW HORN/STROBE WILL BE INSTALLED IN THE DESIGNATED AREA, AND STROBE DEVICES WILL BE ADDED TO THE BATHROOMS AS PER 2016 NFPA 72. ALL NEW AND RELOCATED DEVICES WILL BE CONNECTED TO THE EXISTING EDWARDS FX-64RD FIRE ALARM PANEL.
- Issued Sep 10, 2025
Addition and/or Alteration · INSTALLATION OF NEW FIRE ALARM SYSTEM SPRINKLER VALVES INSTALLED BY OTHERS TO BE TIED INTO FIRE PANEL 5 unit apartment installation shall comply 2018 PHILADELPHIA FIRE CODE 2016 NFPA 72
- Issued Sep 8, 2025
Addition and/or Alteration · INSTALLATION OF NEW DEVICES ON THE FIRST FLOOR, INCLUDING THREE MANUAL PULL STATIONS ADDED TO THE EXISTING SYSTEM AND TWO LOW-FREQUENCY SOUNDERS. ALL NEW DEVICES WILL BE CONNECTED TO THE EXISTING FIRE ALARM CONTROL PANEL LOCATED IN THE BASEMENT. ALL WORK IS TO BE DONE ACCORDING TO APPROVED DRAWINGS-2017 NEC,2016 NFPA-72.
- Issued Aug 25, 2025
Addition and/or Alteration · INSTALLATION OF FIRE ALARM SYSTEM FOR MIXED-USE OCCUPANCY W/ AUTOMATIC DETECTION THROUGHOUT NONRESIDENTIAL PORTION. -NOTED: HEAT DETECTOR IN COMMERCIAL BATHROOM- .ALL WORK IS TO BE DONE ACCORDING TO APPROVED DRAWINGS-2017 NEC,2016 NFPA-72,2018 PHILA FIRE CODE .
- Issued Aug 22, 2025
Addition and/or Alteration · FITOUT FOR PAPA JOHNS VACANT SPACE. EXISTING FIRE ALARM PANEL TO BE USED TO TIE IN NEW CEILING STROBE AND MONITOR MODULE as per 2016 NFPA 72
- Issued Aug 20, 2025
Addition and/or Alteration · INSTALLING A NEW FIRE ALARM SYSTEM . All firestopping to be done by E.C PER: '17 NEC , 300.21 Spread of Fire or Products of Combustion Electrical installations in hollow spaces, vertical shafts, and ventilation or air-handling ducts shall be made so that the possible spread of fire or products of combustion will not be substantially increased. Openings around electrical penetrations into or through fire-resistant-rated walls, partitions, floors, or ceilings shall be firestopped using approved m
- Issued Aug 15, 2025
Addition and/or Alteration · INSTALLATION OF FIRE ALARM SYSTEM FOR MIXED OCCUPANCY AS PER 2016 NFPA 72
- Issued Aug 12, 2025
New Construction · RELOCATED HORN/STROBES AND PULL STATION. ADD NEW STROBE AND PULL STATION. PROGRAM EXISTING FIRE PANEL IN FRONT OF BUILDING. ALL WORK IS TO BE DONE ACCORDING TO APPROVED DRAWINGS-2017 NEC,2016 NFPA-72,2018 PHILA FIRE CODE
- Issued Aug 4, 2025
Addition and/or Alteration · INSTALL FIRE ALARM SYSTEM. ALL WORK TO BE DONE ACCORDING TO THE 2017 NEC, 2016 NFPA 72 AND PER PLANS.
- Issued Jul 25, 2025
Addition and/or Alteration · INSTALLATION OF FIRE ALARM SYSTEM FOR FITOUT AS PER 2016 NFPA 72.
- Issued Jul 21, 2025
New Construction · Relocate horn strobe on back wall in kitchen to strobe in bathroom. Add wiring and module for new exhaust hood as per 2016 NFPA 72.
Track this owner
We'll flag their next deal, permit, or filing — usually before the neighbors know.
Entities are grouped by a normalized name from the public record; a separate legal entity per building is common, so some portfolios span several related names. Sources: Phila. Dept. of Records (deeds), L&I (permits & violations), Dept. of Revenue (tax delinquencies), reflecting the record as of our last weekly ingest. Verify independently before relying on it.
Last generated August 1, 2026.