Entity File · The Public Record
Contractor
Blerton Islamaj
124 permits
- Records on file
- 124
Built (as contractor)
124 entries
- Issued Jul 2, 2026
Addition and/or Alterations · EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES- For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. Install (2) 92% 60K BTU gas furnaces, (2) 2-1/2 ton AC, ductwork, and 20 diffusers
- Issued Jun 30, 2026
Addition and/or Alterations · EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES - For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. 92% 40K BTU furnace, 2 ton AC, ductwork, and 7 diffusers
- Issued Jun 30, 2026
Addition and/or Alterations · EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES - For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. For the installation of HVAC equipment including all registers and diffusers associated with ductwork. Installation of 60K BTU gas furnace, 92 % efficiency with 2 1/2 Ton coil and condenser. Condensing unit to be located on the backyard.
- Issued Jun 9, 2026
Addition and/or Alterations · EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES - For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. MULTI FAMILY - EACH HVAC UNIT TO BE SELF-CONTAINED WITHIN EACH DWELLING UNIT. NO PENETRATIONS OF RATED ASSEMBLIES. Install (2) HVAC systems, ductwork, and 17 total diffusers. (1) system for each dwelling. Each system will have a 2 ton air handler, 2 ton
- Issued Jun 8, 2026
Addition and/or Alterations · EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES - For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. 4 ton air handler, heat pump, 12kW heat kit, new ductwork, and 18 diffusers. Condenser to be located on the rooftop.
- Issued Jun 4, 2026
Addition and/or Alterations · EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES - For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. 92% 60K BTU furnace, 2-1/2 ton AC, ductwork, and 11 diffusers
- Issued Jun 2, 2026
New Construction · EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES - For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. Install 92% 80K BTU furnace, 3 ton AC, ductwork, and 16 diffusers
- Issued May 31, 2026
Addition and/or Alterations · EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES- For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. For the installation of HVAC equipment including all registers and diffusers associated with ductwork. Installation of 100K BTU gas furnace, 92 % efficiency with 4 Ton coil and condenser. Condensing unit to be located on the backyard.
- Issued May 28, 2026
New Construction · Mechanical / Fuel Gas Permit for combo RP-2025-007236
- Issued May 28, 2026
Addition and/or Alterations · EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES - For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. 92% 60K BTU gas furnace, 2-1/2 Ton AC, ductwork, and 11 diffusers
- Issued May 19, 2026
Addition and/or Alterations · EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES- For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. Install 92% 60K BTU gas furnace, 2 1/2 Ton AC, ductwork, and 10 diffusers
- Issued May 15, 2026
New Construction · Mechanical / Fuel Gas Permit for combo RP-2025-002639
- Issued May 15, 2026
New Construction · Mechanical / Fuel Gas Permit for combo RP-2025-007240
- Issued May 15, 2026
New Construction · Mechanical / Fuel Gas Permit for combo RP-2025-007239
- Issued Apr 30, 2026
Addition and/or Alterations · EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES - For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. For the installation of HVAC equipment including all registers and diffusers associated with ductwork. Installation of 60K BTU gas furnace, 92 % efficiency with 2 1/2 Ton coil and condenser. Condensing unit to be located on the backyard.
- Issued Apr 30, 2026
Addition and/or Alterations · EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES - For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. 80K BTU 92% furnace, 3 ton AC, ductwork, and 13 diffusers
- Issued Apr 25, 2026
New Construction · Mechanical / Fuel Gas Permit for combo RP-2023-006901
- Issued Apr 24, 2026
Addition and/or Alterations · EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES- For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. Install a 92% 80K BTU gas furnace, 3 ton AC, ductwork, and 13 diffusers
- Issued Apr 16, 2026
New Construction · Mechanical / Fuel Gas Permit for combo RP-2025-011978
- Issued Apr 16, 2026
New Construction · FOR THE INSTALLATION OF REGISTERS, DIFFUSERS, AND APPLIANCES WITH ASSOCIATED DUCTWORK. APPLIANCES TO BE INSTALLED IN ACCORDANCE WITH THE MANUFACTURER’S SPECIFICATIONS. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS REQUIRED FOR ALL OTHER WORK.
- Issued Apr 6, 2026
New Construction · FOR THE INSTALLATION OF REGISTERS, DIFFUSERS, AND APPLIANCES WITH ASSOCIATED DUCTWORK. APPLIANCES TO BE INSTALLED IN ACCORDANCE WITH THE MANUFACTURER’S SPECIFICATIONS. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS REQUIRED FOR ALL OTHER WORK.
- Issued Mar 18, 2026
Addition and/or Alterations · EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES - For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. 92% 60K BTU furnace, 2-1/2 ton AC, ductwork, and 13 diffusers
- Issued Mar 17, 2026
Addition and/or Alterations · EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES- For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. Additional permits may be required. For the installation of HVAC equipment including all registers and diffusers associated with ductwork, installation of 60K BTU GAS furnace with 2 1/2 Ton coil and condenser. Condensing unit to be located on the backyar
- Issued Mar 13, 2026
Addition and/or Alterations · EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES - For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. 80K BTU 92% furnace, 3 ton AC, ductwork, and 14 diffusers
- Issued Mar 12, 2026
Addition and/or Alterations · EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES - For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. 92% 60K BTU gas furnace, 2-1/2 ton AC, ductwork, and 13 diffusers
- Issued Mar 10, 2026
Addition and/or Alterations · EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES - For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. 80k BTU furnace, 3 ton AC, ductwork, 14 diffusers
- Issued Mar 9, 2026
Addition and/or Alterations · EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES - For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. 92% 60K BTU gas furnace, 2-1/2 ton AC, ductwork, and 14 diffusers
- Issued Mar 9, 2026
Addition and/or Alterations · EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES- For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. Additional permits may be required. For the installation of HVAC equipment including all registers and diffusers associated with ductwork, installation of 80K BTU gas furnace, 92% efficiency with 3 Ton coil and condenser. Condensing unit to be located on
- Issued Mar 5, 2026
New Construction · Mechanical / Fuel Gas Permit for combo RP-2025-012291
- Issued Feb 27, 2026
Addition and/or Alterations · EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES- For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. Additional permits may be required. For the installation of HVAC equipment, including all the registers and diffusers associated with ductwork installation of 60,000 BTU gas furnace 92% efficiency with 2 1/2 ton coil and condenser condensing unit to be l
- Issued Feb 27, 2026
New Construction · Mechanical / Fuel Gas Permit for combo RP-2025-011553
- Issued Feb 19, 2026
Addition and/or Alterations · EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES - For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. 60K BTU 92% furnace, 2-1/2 ton AC, ductwork, and 7 diffusers
- Issued Feb 18, 2026
New Construction · Mechanical / Fuel Gas Permit for combo RP-2025-012266
- Issued Jan 29, 2026
Addition and/or Alterations · EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES - For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. Install 2 ton AC with the existing 60K BTU gas furnace, condenser to be in the backyard, ductwork, and 10 diffusers.
- Issued Jan 28, 2026
New Construction · FOR THE INSTALLATION OF REGISTERS, DIFFUSERS AND APPLIANCES WITH ASSOCIATED DUCTWORK. **APPLIANCES TO BE INSTALLED IN ACCORDANCE WITH THE MANUFACTURER’S SPECIFICATIONS. **ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. **
- Issued Jan 27, 2026
New Construction · Mechanical / Fuel Gas Permit for combo RP-2025-008013
- Issued Jan 21, 2026
Addition and/or Alterations · EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES- For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. Additional permits may be required. For the installation of HVAC equipment including all registers and diffusers associated with ductwork. Installation of 60K BTU gas furnace with 2 Ton coil and condenser. Condensing unit to be located at the front porch
- Issued Jan 16, 2026
Addition and/or Alterations · EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES- For Mechanical Work to include the installation as per attached standards. Deviations from these standards require submission of construction and site plans. Install 92% 100K BTU furnace, 3 1/2 ton AC, ductwork, and 16 diffusers
- Issued Jan 14, 2026
1 units
New Construction · FOR NEW CONSTRUCTION OF AN ATTACHED BUILDING WITH CELLAR, ROOF DECK AND ROOF-DECK ACCESS STRUCTURE FOR USE AS SINGLE-FAMILY HOUSEHOLD LIVING. BUILDING TO BE FULLY SPRINKLERED WITH NFPA 13D. SEPARATE PERMITS REQUIRED FOR EXCAVATION, MECHANICAL, ELECTRICAL, PLUMBING AND FIRE SUPPRESSION (EXCAVATION AND FOUNDATION PREVIOUSLY CONSTRUCTED UNDER EXPIRED PERMIT RP-2022-001848 TO BE LEGALIZED UNDER THIS PERMIT).
- Issued Jan 12, 2026
New Construction · EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES - For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. Install 100K BTU 92% furnace, 4 ton AC, ductwork, and 19 diffusers
- Issued Jan 12, 2026
New Construction · EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES - For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. Install 80K BTU 92% furnace, 3 ton AC, ductwork, and 17 diffusers
- Issued Jan 12, 2026
New Construction · EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES - For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. Install 100K BTU 92% furnace, 4 ton AC, ductwork, and 18 diffusers
- Issued Dec 30, 2025
Addition and/or Alterations · EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES - For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. Install 60K BTU 92% furnace, 2-1/2 ton AC, ductwork, and 10 diffusers
- Issued Dec 29, 2025
Addition and/or Alterations · EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES - For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. Install 80K BTU furnace, 3 ton AC, ductwork, and 14 diffusers
- Issued Dec 16, 2025
New Construction · Mechanical / Fuel Gas Permit for combo RP-2021-019407
- Issued Dec 16, 2025
New Construction · FOR THE INSTALLATION OF HVAC APPLIANCES, GRDs, BATHROOM AND CLOTHES DRYER EXHAUSTS, AND ASSOCIATED DUCTWORK THROUGHOUT A TEN (10) DWELLING UNIT BUILDING AS PER APPROVED PLANS AND IN ACCORDANCE WITH 2018 IMC. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK. SEE CP-2023-005708 FOR ASSOCIATED BUILDING PERMIT.
- Issued Dec 12, 2025
New Construction · Mechanical / Fuel Gas Permit for combo RP-2021-019240
- Issued Dec 12, 2025
New Construction · Mechanical / Fuel Gas Permit for combo RP-2021-019436
- Issued Dec 12, 2025
New Construction · Mechanical / Fuel Gas Permit for combo RP-2021-019425
- Issued Dec 10, 2025
Addition and/or Alterations · EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES - For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. Install 92% 60K BTU furnace, 2-1/2 Ton AC, ductwork, and 11 diffusers
- Issued Dec 8, 2025
New Construction · Mechanical / Fuel Gas Permit for combo RP-2024-008073
- Issued Dec 8, 2025
New Construction · Mechanical / Fuel Gas Permit for combo RP-2025-006374
- Issued Dec 8, 2025
Addition and/or Alterations · EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES - For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. Install 92% 60K BTU furnace, 2-1/2 Ton AC, ductwork, and 10 diffusers
- Issued Dec 4, 2025
New Construction · Mechanical / Fuel Gas Permit for combo RP-2025-007445
- Issued Dec 4, 2025
New Construction · Mechanical / Fuel Gas Permit for combo RP-2025-007560
- Issued Dec 3, 2025
New Construction · EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES - For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. Install 80K BTU 92% gas furnace, 3 Ton AC, ductwork, and 13 diffusers
- Issued Dec 3, 2025
New Construction · EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES - For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. Install 80K BTU 92% gas furnace, 3 Ton AC, ductwork, and 15 diffusers
- Issued Dec 1, 2025
Addition and/or Alterations · FOR THE INSTALLATION OF REGISTERS, DIFFUSERS, AND APPLIANCES WITH ASSOCIATED DUCTWORK. APPLIANCES TO BE INSTALLED IN ACCORDANCE WITH THE MANUFACTURER’S SPECIFICATIONS. FOR USE AS PREVIOUSLY APPROVED. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK.
- Issued Nov 24, 2025
New Construction · FOR THE INSTALLATION OF REGISTERS, DIFFUSERS AND APPLIANCES WITH ASSOCIATED DUCTWORK. APPLIANCES TO BE INSTALLED IN ACCORDANCE WITH THE MANUFACTURER’S SPECIFICATIONS. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS REQUIRED FOR ALL OTHER WORK.
- Issued Nov 24, 2025
New Construction · EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES - For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. Install 100K BTU gas furnace, 4 Ton AC, ductwork, and 21 diffusers
- Issued Nov 19, 2025
New Construction · Mechanical / Fuel Gas Permit for combo RP-2024-010301
- Issued Nov 10, 2025
Addition and/or Alterations · EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES- For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. For the installation of HVAC equipment, including all registers and diffusers associated with ductwork installation of 1-80,000 BTU 96% efficiency with 3 ton coil and condenser and 1-40,000 BTU 96% efficiency with two on coil and condenser. Condensing un
- Issued Nov 10, 2025
Addition and/or Alterations · EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES- For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. For the installation of HVAC equipment, including all registers and diffusers associated with ductwork installation of 60,000 BTU gas furnace 92% efficiency with 2 1/2 ton coil and condenser, condensing unit to be located on the backyard.
- Issued Nov 4, 2025
New Construction · Mechanical / Fuel Gas Permit for combo RP-2024-011237
- Issued Oct 28, 2025
New Construction · FOR THE INSTALLATION OF REGISTERS, DIFFUSERS, AND APPLIANCES WITH ASSOCIATED DUCTWORK. APPLIANCES TO BE INSTALLED IN ACCORDANCE WITH THE MANUFACTURER’S SPECIFICATIONS. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS REQUIRED FOR ALL OTHER WORK.
- Issued Oct 27, 2025
New Construction · Mechanical / Fuel Gas Permit for combo RP-2025-006625
- Issued Oct 24, 2025
New Construction · Mechanical / Fuel Gas Permit for combo RP-2025-003261
- Issued Oct 23, 2025
Addition and/or Alterations · EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES - For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. Install 60K BTU 92% furnace, 2-1/2 Ton AC to be mounted on the backyard, ductwork, and 10 diffusers.
- Issued Oct 23, 2025
Addition and/or Alterations · EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES - For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. Install 92% 60K BTU gas furnace, 2-1/2 ton AC unit to be located on the back yard, ductwork, and 10 diffusers.
- Issued Oct 21, 2025
Addition and/or Alterations · EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES- For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. EACH HVAC UNIT TO BE SELF-CONTAINED WITHIN EACH DWELLING UNIT. NO PENETRATIONS OF RATED ASSEMBLIES. For the replacement of condensing unit , located on the right side of property.
- Issued Oct 21, 2025
New Construction · Mechanical / Fuel Gas Permit for combo RP-2025-004807
- Issued Oct 21, 2025
New Construction · Mechanical / Fuel Gas Permit for combo RP-2025-004753
- Issued Oct 14, 2025
Addition and/or Alterations · FOR THE INSTALLATION OF APPLIANCES NOT CONNECTED VIA DUCTWORK; INSTALLATION OF REGISTERS, DIFFUSERS, AND APPLIANCES WITH ASSOCIATED DUCTWORK. APPLIANCES TO BE INSTALLED IN ACCORDANCE WITH MANUFACTURER'S SPECIFICATIONS. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS REQUIRED FOR ALL OTHER WORK.
- Issued Oct 13, 2025
Addition and/or Alterations · FOR THE INSTALLATION OF A NEW HVAC SYSTEMS, ASSOCIATED DUCT WORK, ROOFTOP UNITS, DUCTLESS SYSTEMS, AND REGISTERS/DIFFUSERS AS PER APPROVED PLANS. SEPARATE PERMIT REQUIRED FOR ELECTRICAL, PLUMBING, FIRE SUPPRESSION.
- Issued Oct 9, 2025
Addition and/or Alterations · IEZ PERMIT DUCTWORK & WARM-AIR APPLIANCES - For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. nstallation of 92% 60K BTU gas furnace, 2 1/2 ton AC, ductwork, and 11 diffusers
- Issued Oct 8, 2025
New Construction · Mechanical / Fuel Gas Permit for combo CP-2024-003319
- Issued Oct 4, 2025
Addition and/or Alterations · EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES - For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. Install 60K BTU 92% gas furnace, 2 Ton AC, ductwork, and 10 diffusers
- Issued Oct 3, 2025
Addition and/or Alterations · EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES- For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. Install 92% 80K BTU furnace, 3 ton AC located on the backyard, ductwork, and 13 diffusers.
- Issued Sep 30, 2025
New Construction · Mechanical / Fuel Gas Permit for combo RP-2025-007444
- Issued Sep 30, 2025
New Construction · Mechanical / Fuel Gas Permit for combo RP-2025-004045
- Issued Sep 29, 2025
Addition and/or Alterations · EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES - For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. Install 70K BTU furnace, 2-1/2 ton AC, ductwork, and 10 diffusers
- Issued Sep 27, 2025
Addition and/or Alterations · EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES- For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. EACH HVAC UNIT TO BE SELF-CONTAINED WITHIN EACH DWELLING UNIT. NO PENETRATIONS OF RATED ASSEMBLIES. For the installation of HVAC equipment, including all the registers and diffusers associated with ductwork installation of 60,000 BTU 92% efficiency gas f
- Issued Sep 24, 2025
1 units
New Construction · FOR THE CONSTRUCTION OF AN ATTACHED STRUCTURE WITH CELLAR AND ROOF DECK ACCESSED BY A ROOF DECK ACCES STRUCTURE. FOR USE AS A SINGLE-FAMILY HOUSEHOLD LIVING. AS PER APPROVED PLANS. **************FOUNDATION AND FOUNDATION WALL WAS APPROVED UNDER PERMIT RP-2022-001810. ********** ************SEPARATE PERMITS REQUIRED FOR PLUMBING AND ELECTRICAL WORK. *********
- Issued Sep 24, 2025
New Construction · Mechanical / Fuel Gas Permit for combo RP-2025-003314
- Issued Sep 24, 2025
1 units
New Construction · FOR THE CONSTRUCTION OF AN ATTACHED STRUCTURE WITH CELLAR AND ROOF DECK ACCESSED BY A ROOF DECK ACCES STRUCTURE. FOR USE AS A SINGLE-FAMILY HOUSEHOLD LIVING. AS PER APPROVED PLANS. **************FOUNDATION AND FOUNDATION WALL WAS APPROVED UNDER PERMIT RP-2022-001854. ********** ************SEPARATE PERMITS REQUIRED FOR PLUMBING AND ELECTRICAL WORK. *********
- Issued Sep 24, 2025
New Construction · Mechanical / Fuel Gas Permit for combo RP-2025-003414
- Issued Sep 23, 2025
New Construction · For the installation of HVAC equipment including all registers and diffusers associated with ductwork. Installation of gas furnaces and condensing units as per approved plans.
- Issued Sep 18, 2025
Addition and/or Alterations · EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES - For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. Install 92% 60K BTU gas furnace, 2-1/2 ton AC, ductwork, and 10 diffusers
- Issued Sep 17, 2025
New Construction · FOR THE INSTALLATION OF REGISTERS, DIFFUSERS, AND APPLIANCES WITH ASSOCIATED DUCTWORK. APPLIANCES TO BE INSTALLED IN ACCORDANCE WITH THE MANUFACTURER’S SPECIFICATIONS. FOR USE AS PREVIOUSLY APPROVED. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK.
- Issued Sep 17, 2025
Addition and/or Alterations · EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES - For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. Install 92% 100K BTU gas furnace, 4 ton AC, ductwork, and 14 diffusers.
- Issued Sep 16, 2025
Addition and/or Alterations · EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES - For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. Install 92% 80K BTU furnace, 3 Ton AC, ductwork, and 15 diffusers.
- Issued Sep 16, 2025
Addition and/or Alterations · EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES - For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. Install 60K BTU gas furnace, 2-1/2 ton AC, new ductwork, and 9 diffusers.
- Issued Sep 16, 2025
Addition and/or Alterations · EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES - For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. Install 92% 60k BTU furnace, 2 1/2 Ton AC, ductwork, and 10 diffusers.
- Issued Sep 11, 2025
Addition and/or Alterations · EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES - For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. Install 92% 60k BTU furnace, 2 1/2 Ton AC, ductwork, and 9 diffusers.
- Issued Sep 5, 2025
Addition and/or Alterations · EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES- For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. For the installation of HVAC equipment including all registers and diffusers associated with ductwork . Installation of 2 , 60K BTU gas furnaces with 2 Ton coil and condensers . Condensing units to be located on the backyard.
- Issued Sep 3, 2025
New Construction · Mechanical / Fuel Gas Permit for combo RP-2024-012717
- Issued Sep 2, 2025
New Construction · Mechanical / Fuel Gas Permit for combo RP-2025-006420
- Issued Sep 2, 2025
New Construction · Mechanical / Fuel Gas Permit for combo RP-2025-006419
- Issued Sep 2, 2025
New Construction · Mechanical / Fuel Gas Permit for combo RP-2025-006421
- Issued Sep 2, 2025
New Construction · Mechanical / Fuel Gas Permit for combo RP-2025-006422
Track this owner
We'll flag their next deal, permit, or filing — usually before the neighbors know.
Entities are grouped by a normalized name from the public record; a separate legal entity per building is common, so some portfolios span several related names. Sources: Phila. Dept. of Records (deeds), L&I (permits & violations), Dept. of Revenue (tax delinquencies), reflecting the record as of our last weekly ingest. Verify independently before relying on it.
Last generated August 1, 2026.