  1. Issued Jun 9, 2026

    2929 Arch St

    Addition and/or Alterations · FOR THE INSTALLATION OF HVAC APPLIANCES, EQUIPMENT, DUCTWORK AND REGISTERS/DIFFUSERS TO THE 7TH FLOOR OF AN EXISTING STRUCTURE PER APPROVED PLANS AND MANUFACTURER'S SPECIFICATIONS. *2018 IMC REVIEW*

  2. Issued Jun 3, 2026

    2929 Arch St

    Addition and/or Alteration · INSTALL BRANCH POWER/LIGHTING & LIGHTING CONTROLS/MECHANICAL POWER. ALL WORK IS TO BE DONE ACCORDING TO APPROVED DRAWINGS-2017 NEC. AMENDMENT: Furnish and Install fire alarm as per plans.

  3. Issued May 26, 2026

    2929 Arch St

    Addition and/or Alterations · EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the relocation of sprinkler heads as per attached standards. Deviations from these standards require submission of construction and site plans. RELOCATE (125) SPRINKLER HEADS ON THE 7TH FLOOR, PER NFPA 13

  4. Issued May 21, 2026

    2929 Arch St

    Alterations · Furnish and install (2) new plumbing fixtures, (2) kitchen sinks with piping.

  5. Issued May 14, 2026

    1 units

    2929 Arch St

    Addition and/or Alteration · FOR LEVEL II INTERIOR ALTERATIONS TO A PORTION OF AN EXISTING STRUCTURE. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN PROFESSIONAL PRIOR TO THE START OF ANY WORK. **SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK.**

  6. Issued Mar 31, 2026

    2929 Arch St

    Addition and/or Alteration · Install 9 low voltage door releases and 2 video intercoms

  7. Issued Feb 24, 2026

    2929 Arch St

    Alterations · Renovation of the 14th floor, including new sanitary, vent, domestic water connection to building existing with new plumbing fixtures Other= Water fountain

  8. Issued Feb 17, 2026

    2929 Arch St

    Addition and/or Alteration · Provide and install 117 Cat6 plenum cables at 150' average. Provide and install 33 Cat6A plenum cables at 150' average. All work will be completed per current NEC. No rescue systems work.

  9. Issued Feb 16, 2026

    2929 Arch St

    Addition and/or Alteration · Install (18) A1 light fixtures Install (4) A2 light fixtures Install (12) A17 light fixtures Install (11) B1 light fixtures Furnish and install (8) F1 light fixtures Furnish and install (2) F2 light fixtures Furnish and install (2) F3 light fixtures Furnish and install (1) F4 light fixtures Furnish and install (344') T1 track Install (36') relocated T2 track Relocate (6) pendant lights Install (4) pendant mounted exit signs Relocate (7) fire alarm devices Install (5) fire alarm speaker strobes I

  10. Issued Feb 13, 2026

    2929 Arch St

    Addition and/or Alterations · FOR THE INSTALLATION OF HVAC APPLIANCES, EQUIPMENT, DUCTWORK AND REGISTERS/DIFFUSERS PER APPROVED PLANS AND MANUFACTURER'S SPECIFICATIONS. *2018 IMC REVIEW*

  11. Issued Feb 11, 2026

    2929 Arch St

    Addition and/or Alterations · EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the relocation of sprinkler heads as per attached standards. Deviations from these standards require submission of construction and site plans. Relocate (94) Sprinkler Heads

  12. Issued Feb 9, 2026

    2929 Arch St

    Addition and/or Alteration · Install disconnections, temporary light and power from on-site power source,. Rewire existing panels, new electric panel, new sub meters, Install light fixtures, lighting controls, switching, receptacles, devices, HVAC power connections, Per plans empty box and conduit stub-ups for telecom/AV/Security, Install new fire alarm devices tied into the existing building Fire alarm system. In accordance with NFPA 2016 & The Philadelphia Fire Code 2018

  13. Issued Dec 31, 2025

    2929 Arch St

    Addition and/or Alterations · EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the relocation of sprinkler heads as per attached standards. Deviations from these standards require submission of construction and site plans. Relocate (290) sprinklers to accommodate interior alterations to 14th floor

  14. Issued Dec 9, 2025

    1 units

    2929 Arch St

    Addition and/or Alteration · FOR LEVEL II ALTERATIONS TO THE 14TH FLOOR LEVEL OF AN EXISTING STRUCTURE. FOR USE AS A BUSINESS OCCUPANCY. ALTERATIONS TO INCLUDE THE ERECTION OF PARTITION WALLS, PROVIDE FINISHES/FURNISHINGS, AND ACCESSIBILITY IMPROVEMENTS THROUGHOUT. BUILDING TO BE FULLY SPRINKLERED. **ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN PROFESSIONAL PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK.**

  15. Issued Nov 19, 2025

    2929 Arch St

    EZ Interior Non-Load-Bearing Wall Demo. · For minor construction work at the subject property in accordance with all applicable provisions of the Philadelphia Code, all references codes and standards, and the attached EZ Standard, where included. Deviation from this standard shall result in permit revocation. A separate permit from the Philadelphia Department of Streets is required for any sidewalk and street closures. All means of pedestrian protection required at the site in accordance with the Philadelphia Building Code Chapter 33 sh

  16. Issued Nov 14, 2025

    2929 Arch St

    Addition and/or Alteration · Furnish and install one-hundred seventy-eight (178) plenum Category 6 cables from the MDF room to workstations. Furnish and install fourteen (14) plenum Category 6A cables from the MDF to wireless access points. Average cable pull is 150 feet.

  17. Issued Oct 28, 2025

    2929 Arch St

    Addition and/or Alterations · FOR INSTALLATION OF HVAC APPLIANCES, EQUIPMENT, DUCTWORK AND REGISTERS/DIFFUSERS PER APPROVED PLANS AND MANUFACTURER'S SPECIFICATIONS.

  18. Issued Oct 22, 2025

    2929 Arch St

    Alterations · INSTALLATION OF 5 NEW FIXTURES WITH PIPING INTO EXISTING BUISNESS SPACE. ALL WORK TO BE PERFORMED IN STRICT COMPLIANCE WITH 2018 PPC AND EZ STANDARD.

  19. Issued Sep 15, 2025

    1 units

    2929 Arch St

    Addition and/or Alteration · FOR PARTIAL DEMOLITION AND LEVEL II INTERIOR ALTERATIONS TO THE 10TH FLOOR OF AN EXISTING STRUCTURE. ALTERATIONS TO INCLUDE THE ERECTION OF PARTITION WALLS, PROVIDE FINISHES/FURNISHINGS THROUGHOUT. BUILDING IS FULLY SPRINKLERED. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN PROFESSIONAL PRIOR TO THE START OF ANY WORK. ******************** SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK. *******************************

Track this owner

We'll flag their next deal, permit, or filing — usually before the neighbors know.

Entities are grouped by a normalized name from the public record; a separate legal entity per building is common, so some portfolios span several related names. Sources: Phila. Dept. of Records (deeds), L&I (permits & violations), Dept. of Revenue (tax delinquencies), reflecting the record as of our last weekly ingest. Verify independently before relying on it.
Last generated July 15, 2026.