Entity File · The Public Record
Company / LLC
C. Erickson & Sons LLC
17 permits
- Records on file
- 17
Built (as contractor)
17 entries
- Issued Aug 17, 2026
1 units
Addition and/or Alteration · LEVEL II INTERIOR ALTERATIONS (NO CHANGE IN OCCUPANCY) TO THE 28TH FLOOR OF AN EXISTING BUILDING. TENANT SPACES TO BE USE AS A BUSINESS OCCUPANCY. ALTERATIONS TO INCLUDE PARTIAL DEMOLITION AND THE ERECTION OF PARTITION WALLS, PROVIDE FINISHES AND FURNISHINGS THROUGHOUT. ALL WORK TO BE DONE PER APPROVED PLANS. ** IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK**IEBC 2018**EXISTING BUILDING FULLY SPRINKLERED ************************* SEPARATE PERMITS REQUIRED FOR A
- Issued Aug 10, 2026
1 units
Addition and/or Alteration · FOR A LEVEL II INTERIOR ALTERATIONS (NO CHANGE IN OCCUPANCY )TO A PORTION OF AN EXISTING HOSPITAL. **ALL WORK TO BE DONE PER APPROVED PLANS AND DOH APPROVAL.** IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK**IEBC 2021**EXISTING BUILDING FULLY SPRINKLERED** SEPARATE PERMITS REQUIRED FOR ALL OTHER WORK**
- Issued Jul 15, 2026
1 units
Commercial Make Safe Permit · MAKE SAFE PERMIT TO COMPLY WITH CASE #CF-2025-066328:- FOR THE STABILIZATION OF AN EXISTING STRUCTURE DAMAGED BY FIRE. WORK TO BE COMPLETED AS PER ENGINEER'S REPORT AND PLAN. CONSTRUCTION COMPLETION TO BE POSTPONED. ABUTTING SIDEWALK MUST BE CLOSED WITH FENCING A MINIMUM OF 6' IN HEIGHT. SEPARATE STREETS DEPARTMENT PERMIT REQUIRED FOR SIDEWALK CLOSURE. A SEPARATE PERMIT IS REQUIRED FOR ANY ADDITIONAL ALTERATIONS THAT ARE NOT SPECIFICALLY ADDRESSED ON CASE #CF-2025-066328. IN ACCORDANCE WITH COD
- Issued Jun 18, 2026
1 units
Addition and/or Alteration · FOR LEVEL II ALTERATIONS TO AN EXISTING STRUCTURE. ALTERATIONS TO INCLUDE THE ERECTION OF PARTITION WALLS, PROVIDE FINISHES/FURNISHINGS AND ACCESSIBILITY IMPROVEMENTS THROUGHOUT. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK.
- Issued Jun 8, 2026
1 units
Addition and/or Alteration · FOR THE SITEWORK RELATED TO ADA COMPLIANT IMPROVEMENTS AND PARKING LOT REPAVING PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS REQUIRED FOR ALL OTHER WORK.
- Issued May 21, 2026
1 units
Addition and/or Alteration · FOR LEVEL II ALTERATIONS TO AN EXISTING STRUCTURE. ALTERATIONS TO INCLUDE THE ERECTION OF PARTITION WALLS, PROVIDE FINISHES/FURNISHINGS AND ACCESSIBILITY IMPROVEMENTS THROUGHOUT. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK.
- Issued May 18, 2026
1 units
Addition and/or Alteration · FOR LEVEL II ALTERATIONS TO INCLUDE NEW PARTITIONS, FIXTURES, FURNISHINGS, DOORS, FINISHES AS PER APPROVED PLANS. SEPARATE PERMITS REQUIRED FOR MEP AND FIRE SUPPRESSION WORK.
- Issued May 7, 2026
1 units
Addition and/or Alteration · FOR INTERIOR ALTERATIONS AND THE STRUCTURAL WORK ASSOCIATED WITH THE REMOVAL OF COMMUNICATIVE STAIR SEGMENT THAT SPANS FROM 5TH TO 6TH FL. WITHIN AN EXISTING BUILDING. ALL WORK TO BE DONE PER APPROVED PLANS. SEPARATE PERMITS REQUIRED FOR MECHANICAL, ELECTRICAL, PLUMBING, AND FIRE SUPPRESSION WORK. IF SITE CONDITIONS VARY, CONTACT DESIGN PROFESSIONAL PRIOR TO START OF WORK.
- Issued Apr 28, 2026
Foundation · FOR THE ERECTION OF A BUILDING FOUNDATION (ONLY). ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS REQUIRED FOR ALL OTHER WORK. ** SEE BUILDING PERMIT FOR ALL OTHER STRUCTURAL WORK **SEE SP-2025-001367 FOR REQUIRED EXCAVATION PERMIT (WITH UNDERPINNING INCLUDED)**
- Issued Apr 10, 2026
1 units
Addition and/or Alteration · FOR LEVEL II INTERIOR ALTERATIONS WITHOUT A CHANGE IN USE AND OCCUPANCY CLASSIFICATION TO AN EXISTING GROUP A-3 MUSEUM GALLERY AND IT RACK ROOM AT THE 2ND FLOOR. EXISTING BUILDING IS SPRINKLERED. ALL WORK TO BE DONE PER APPROVED PLANS AND IN ACCORDANCE WITH 2021 IEBC AND PHC APPROVAL. SEPARATE PERMITS REQUIRED FOR MECHANICAL, ELECTRICAL, PLUMBING, AND FIRE SUPPRESSION WORK. **ASBESTOS ABATEMENT REQUIRED.**
- Issued Apr 10, 2026
1 units
Addition and/or Alteration · FOR LEVEL II ALTERATIONS WITH NO CHANGE OF OCCUPANCY AT 18TH FLOOR OF EXISTING BUILDING. SEPARATE PERMITS REQUIRED FOR MECHANICAL, ELECTRICAL, PLUMBING AND FIRE SUPPRESSION WORK.
- Issued Jan 28, 2026
1 units
Addition and/or Alteration · FOR LEVEL II INTERIOR ALTERATIONS TO A PORTION OF AN EXISTING STRUCTURE. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN PROFESSIONAL PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK.
- Issued Jan 21, 2026
1 units
Addition and/or Alteration · FOR LEVEL II ALTERATIONS TO AN EXISTING SPACE. ALTERATIONS TO INCLUDE THE ERECTION OF PARTITION WALLS, PROVIDE FINISHES/FURNISHINGS AND ACCESSIBILITY IMPROVMENTS THROUGHOUT. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK.
- Issued Oct 30, 2025
1 units
Addition and/or Alteration · FOR LEVEL II INTERIOR ALTERATIONS WITH NO CHANGE IN OCCUPANCY. SEPARATE PERMITS REQUIRED FOR MECHANICAL, ELECTRICAL AND PLUMBING WORK.
- Issued Oct 27, 2025
1 units
Addition and/or Alteration · Modification to exit stairs to separate/ access control basement & residential tenants as per approved plans.
- Issued Aug 28, 2025
1 units
Addition and/or Alteration · FOR LEVEL II INTERIOR ALTERATIONS TO THE GROUND FLOOR TRAINING ROOM, LOBBY, ELEVATOR LOBBY, RESTROOMS, AND ASSOCIATED AREAS WITH NO CHANGE TO USE & OCCUPANCY CLASSIFICATION. EXISTING BUILDING IS FULLY SPRINKLERED. ALL WORK TO BE DONE PER APPROVED PLANS AND IN ACCORDANCE WITH 2018 IEBC. SEPARATE PERMITS REQUIRED FOR MECHANICAL, ELECTRICAL, PLUMBING, AND FIRE SUPPRESSION WORK. **ASBESTOS ABATEMENT REQUIRED** [AMENDMENT 12/11/2025 FOR REMOVAL OF NEW STRUCTURAL STEEL FRAMING WORK FROM PERMIT SCOPE.
- Issued Aug 13, 2025
1 units
Addition and/or Alteration · FOR LEVEL II ALTERATIONS WITH NO CHANGE IN OCCUPANCY. SEPARATE PERMITS REQUIRED FOR MECHANICAL, ELECTRICAL, PLUMBING AND FIRE SUPPRESSION WORK.
Track this owner
We'll flag their next deal, permit, or filing — usually before the neighbors know.
Entities are grouped by a normalized name from the public record; a separate legal entity per building is common, so some portfolios span several related names. Sources: Phila. Dept. of Records (deeds), L&I (permits & violations), Dept. of Revenue (tax delinquencies), reflecting the record as of our last weekly ingest. Verify independently before relying on it.
Last generated September 16, 2026.