Entity File · The Public Record
Company / LLC
Camelot Contracting LLC
62 permits
- Records on file
- 62
Built (as contractor)
62 entries
- Issued Jul 7, 2026
Addition and/or Alteration · Remodel of bathroom in 7th fl apt, replacement of fixtures, installation of 2 switches, 1 outlet, 1 wall sconce
- Issued Jul 6, 2026
Addition and/or Alteration · Remodel of bathroom in 8th fl apt, replacement of fixtures, installation of 3 switches, 2 outlets, 1 recessed light, 1 ventilation fan, 2 light sconces
- Issued Jun 26, 2026
Addition and/or Alteration · Installing a new 100 amp service and total rewire. The basement is being finished in front area. First and 2nd floor will be rewired. The wiring will be fished in some areas and not in other areas of the home.
- Issued Jun 11, 2026
Addition and/or Alteration · remodel of 2nd fl bathroom, replacement of fixtures, installation of 3 switches, 1 outlet, 2 recessed lights, 1 ventilation fan, 2 wall sconces
- Issued Jun 9, 2026
Addition and/or Alteration · Installing a new 200 amp service. Installing GFCI protection throughout the home. Installing 3 new receptacles in bedrooms. Residence wiring will be fished to install 3 receptacles.
- Issued Jun 1, 2026
Addition and/or Alteration · Remodel of 1st fl dining room, 3rd fl bathroom, replacement of fixtures, installation of 1 outlet in dining room, 3 switches, 3 outlets, 2 recessed lights, 3 wall sconces, 1 towel warmer, 1 ventilation fan in bathroom
- Issued Jun 1, 2026
Addition and/or Alteration · Remodel of 2nd fl bathroom, laundry room, 3rd fl bathroom, replacement of fixtures, installation of 5 switches, 2 outlets, 5 recessed lights, 3 wall sconces, 1 ventilation fan with light, heated floor in 2nd fl bathroom. Installation of 2 switches, 1 outlet, 1 wall sconce, 1 ventilation fan, heated floor in 3rd fl bathroom.
- Issued May 21, 2026
Addition and/or Alteration · Remodel of 2nd fl bathroom, replacement of fixtures, installation of 2 switches, 1 outlet, 1 recessed light, 3 wall sconces, 1 ventilation fan
- Issued May 19, 2026
Addition and/or Alteration · Remodel of 2nd fl bathroom, replacement of fixtures, installation of 4 switches, 2 outlets, 1 heated towel rack, 1 wall sconce, 1 recessed light, 1 thermostat
- Issued May 18, 2026
Addition and/or Alteration · Remodel of bathroom in 7th fl apt, replacement of fixtures, installation of 3 switches, 3 outlets, 2 wall sconces, 8 recessed lights, 1 ventilation fan
- Issued May 18, 2026
Addition and/or Alteration · Remodel of 3rd fl bathroom, replacement of fixtures, installation of 2 switches, 2 outlets, 2 recessed lights, 1 wall sconce, 1 ventilation fan
- Issued May 18, 2026
Addition and/or Alteration · Remodel of bathroom in 6th fl apt, replacement of fixtures, installation of 1 switch, 2 outlets, 1 wall sconce, 1 ceiling mt heater, 1 thermostat
- Issued May 6, 2026
Addition and/or Alteration · Install fire alarm system .ALL WORK IS TO BE DONE ACCORDING TO APPROVED DRAWINGS-2017 NEC,20`16 NFPA-72. **ALL OTHER INTERIOR WIRING WILL NEED A SEPARATE PERMIT**
- Issued Apr 27, 2026
Addition and/or Alteration · Remodel/expansion of 2nd fl bathroom, replacement of fixtures, installation of 5 switches, 8 outlets, 3 recessed lights, 1 ventilation fan, 1 ceiling fan
- Issued Apr 20, 2026
Addition and/or Alteration · Installing a 2 phase 200 amp service replacing an old 200 amp 2 phase service.
- Issued Apr 16, 2026
Addition and/or Alteration · Install a new 400-amp electrical service with three (3) meter packs, including service conductors, meter sockets, main disconnecting means, and proper grounding and bonding. Install one (1) 100-amp subpanel for the house, one (1) 200-amp subpanel for the first-floor commercial auto repair shop, and one (1) 200-amp subpanel for the second floor, including all required feeders, overcurrent protection, grounding, and terminations. Install a dedicated subpanel for the fire alarm system, includin
- Issued Apr 14, 2026
Addition and/or Alteration · Remodel of 1st fl kitchen, replacement of fixtures. Installation of 4 switches, 12 outlets, 6 recessed lights, 1 pendant light, 1 air switch, under cabinet lighting
- Issued Apr 9, 2026
Addition and/or Alteration · Remodel of 1st fl kitchen, installation of 5 switches, 5 outlets, undercabinet lighting, 5 recessed lights, 1 pendant light, replacement of fixtures
- Issued Apr 9, 2026
Addition and/or Alteration · Remodel of 2nd fl bathroom, installation of 5 switches, 3 outlets, 2 recessed lights, 1 ventilation fan, 2 ceiling lights, 1 power mirror, replacement of fixtures
- Issued Mar 31, 2026
Addition and/or Alteration · Remodel of 1st fl kitchen, replacement of fixtures, installing 2 switches, 1 air switch, 7 outlets, 3 pendant lights, under cabinet lighting
- Issued Mar 18, 2026
Addition and/or Alteration · Amend Permit Language 4/1/2026 - To identify additional wiring methods other than Fishing Rewiring house that has knob and tube wiring. All wires will be fished through walls. The existing 100 amp service will remain. Installing all new receptacles , Gfcis , arch fault protection, smoke detectors, switches and lights.
- Issued Mar 2, 2026
Addition and/or Alteration · remodel of 2nd fl bathroom, replacement of fixtures, installation of 4 switches, 3 outlets, 2 recessed lights, 1 ventilation fan, 1 thermostat, 2 wall sconces
- Issued Feb 27, 2026
Addition and/or Alteration · remodel of 1st fl kitchen, two powder rooms, replacement of fixtures, installing 1 wall sconce, 1 exhaust fan, 2 switches, 1 outlet in existing powder room; installing 1 exhaust fan with light, 3 switches, 2 outlets, 1 lighted mirror in new powder room; installing 6 recessed lights, 4 pendant lights, 1 air switch, 1 chandelier, undercabinet lighting, 7 switches, 6 outlets in kitchen; installing 2 exterior lights
- Issued Feb 18, 2026
Addition and/or Alteration · Installation of a 22kW Generac generator with associated automatic switch connected to the main electric panel in the house. Separate permit required for any fuel gas work
- Issued Feb 18, 2026
Addition and/or Alteration · Remodel of 1st fl kitchen, replacement of fixtures, installation of 2 outlets
- Issued Jan 28, 2026
Addition and/or Alteration · Remodel of 1st fl kitchen, replacement of fixtures, installation of 3 switches, 7 outlets, 6 recessed lights, 2 pendant lights, undercabinet lighting, 1 air switch; remodel of 2nd fl hall bathroom, replacement of fixtures, installation of 2 switches, 1 outlet, 1 recessed light, 1 wall sconce, 1 ventilation fan; remodel of 2nd fl primary bathroom, replacement of fixtures, installation of 2 switches, 1 outlet, 2 recessed lights, 1 wall sconce, 1 ventilation fan
- Issued Jan 27, 2026
Addition and/or Alteration · Remodel of 2nd fl bathroom, installation of 4 switches, 1 outlet, 4 recessed lights, 1 ventilation fan, 2 wall sconces
- Issued Jan 14, 2026
Addition and/or Alteration · Remodel of 3rd floor bathroom - replacement of exhaust fan, switches and outlet in position; 1 new sconce and 1 recessed light. remodel of 3rd floor - 5 new outlets, raise existing outlet, 1 new recessed light with switch, under cabinet lighting
- Issued Jan 5, 2026
Addition and/or Alteration · Electrical Permit for combo CP-2025-002257
- Issued Dec 18, 2025
Addition and/or Alteration · Remodel of 2nd fl bathroom, replacement of fixtures, installation of 2 switches, 1 outlet, 3 recessed lights, 1 thermostat, radiant heated flooring
- Issued Dec 11, 2025
Addition and/or Alteration · Remodel of 2nd fl bathroom, replacement of fixtures, installing 3 switches, 2 recessed lights, 1 wall sconce, 1 ventilation fan, 1 thermostat for heated flooring, 2 outlets
- Issued Dec 10, 2025
Addition and/or Alteration · Remodel of 1st fl kitchen + powder room: replacement of fixtures, installation of 6 switches, 9 outlets, 7 recessed lights, 1 ventilation fan, undercabinet lighting remodel of 2nd fl bathroom: replacement of fixtures, installation of 2 switches, 1 outlet, 4 recessed lights, 1 ventilation fan
- Issued Dec 3, 2025
Addition and/or Alteration · installation of 3 switches, 1 recessed light, 1 ventilation fan, 2 outlets, 2 wall sconces
- Issued Nov 25, 2025
Addition and/or Alteration · Install a two-gang meter socket. Install feeder cable, subpanel, and a 100-amp disconnect for the second-floor apartment. Separate the wiring circuits between the first and second floors. Rewire the kitchen and install a feeder and subpanel in the basement for the first-floor apartment. Install 120-volt smoke/CO alarms. All work shall be performed in accordance with the 2017 NEC and per the executed contract.
- Issued Nov 18, 2025
Addition and/or Alteration · Remodel of 2nd fl bathroom/office, installation of 3 switches, 2 outlets, 2 recessed lights, 1 vent fan, 1 hot water radiator, 2 wall sconces
- Issued Nov 10, 2025
Addition and/or Alteration · Remodel of 2nd fl bathroom, installation of 2 switches, 1 outlet, 1 wall sconce, 1 pendant light, 1 ventilation fan, replacement of fixtures
- Issued Oct 21, 2025
Addition and/or Alteration · INSTALL GFCI BRANCH CIRCUIT FOR BATHROOM. INSTALL WIRING, LIGHTING, SWITCHES AND RECEPTACLE OUTLET. ALL WOEK TO BE DONE ACCORDING TO THE 2017 NEC,
- Issued Oct 6, 2025
Addition and/or Alteration · Remodel of 2nd fl bathroom: vanity light, switches, and outlets to remain, exhaust fan replacement at existing location, new 6" recessed can ceiling light above shower
- Issued Oct 3, 2025
Addition and/or Alteration · Electrical Permit for combo CP-2025-004995
- Issued Oct 3, 2025
1 units
Addition and/or Alteration · FOR LEVEL I INTERIOR ALTERATIONS THROUGHOUT 1ST FLOOR OF AN EXISTING STRUCTURE TO INCLUDE FIXTURES, FURNISHINGS, AND FINISHES AS PER APPROVED PLANS. FOR USE AS RETAIL SALES-CONSUMER GOODS AT 1ST FLOOR COMMERCIAL SPACE TO INCLUDE ALL OTHER PREVIOUSLY APPROVED USE. AS PER APPROVED PLANS. *******************SEPARATE PERMITS REQUIRED FOR PLUMBING OR MECHANICAL WORK. *******************************************
- Issued Oct 2, 2025
Addition and/or Alteration · INSTALL 18KW GENERATOR AND AUTOMATIC TRANSFER SWITCH TO CONNECCT TO MAIN CIRCUIT BREAKER PANEL. ALL WORK TO BE DONE ACCORDING TO THE 2017 NEC.
- Issued Oct 1, 2025
Addition and/or Alteration · INSTALL WIRING, LIGHTING, SWITCHES AND RECEPTACLE OUTLETS TO KITCHEN AND POWER ROOM. ALL WORK TO BE DONE ACCORDING TO THE 2017 NEC.
- Issued Sep 16, 2025
Addition and/or Alteration · Remodel of 1st fl kitchen, installing 8 switches, 3 outlets, 9 recessed lights, 1 pendant light, undercabinet lighting, 1 air switch, new appliances, as per layout
- Issued Sep 10, 2025
Addition and/or Alteration · remodel of basement bathroom, relocating 2 switches and outlet, installing recessed light, 1 wall sconce, adding new exhaust fan, as per layout
- Issued Sep 10, 2025
Addition and/or Alteration · remodel of 1st fl kitchen, installing 2 switches, 6 outlets, 1 ceiling light, new appliances, as per layout
- Issued Sep 5, 2025
Addition and/or Alteration · Electrical Permit for combo RP-2025-007281
- Issued Aug 28, 2025
Addition and/or Alteration · Replace main 200 amp service cable and install grounding devices.
- Issued Aug 27, 2025
Addition and/or Alteration · remodel of 1st fl powder room -reinstalling existing appliances in new location as per layout -installing 2 ceiling lights -adding 3 outlets as per new layout -adding exhaust fan as per new layout
- Issued Aug 25, 2025
Addition and/or Alteration · remodel of 2nd fl bathroom, installation of 2 outlets, 3 switches, 2 lights and fan, per layout
- Issued Aug 20, 2025
Addition and/or Alteration · Remodel of 1st fl kitchen, - Replacing fridge and stove in position - Relocating dishwasher - Installing 8 recessed lights - Installing 1 pendant light - Adjustments to outlet placement as per new layout - Garbage disposal + air switch button - Installing under cabinet lighting as per new layout
- Issued Aug 14, 2025
Addition and/or Alteration · Remodel of 1st fl kitchen, Replacing appliances in position - Reinstalling 1 ceiling light - Adjustments to outlet placement as per new layout - Installing garbage disposal
- Issued Aug 13, 2025
Addition and/or Alteration · emodel of 1st fl kitchen, -replacing appliances in position -installing 6 recessed lights -installing 3 pendant lights -adjustments to outlet placement as per new layout
- Issued Aug 7, 2025
Addition and/or Alteration · remodel of 2nd fl bathroom, replacement of fixtures
- Issued Aug 1, 2025
Addition and/or Alteration · REWIRE 3 BATHROOMS AND 1 KITCHEN WITH LIGHTING, SWITCHES AND GFCI RECEPTACLE OUTLETS ALL WORK TO BE DONE ACCORDING TO THE 2017 NEC.
- Issued Jul 30, 2025
Addition and/or Alteration · Installing blank plates throughout apartments where fire alarm devices were located. Fire alarm was removed as required by new zoning inspector. This property is not longer commercial and was approved for use as 2 residential dwelling units by variance issued in April 2024. A copy of the variance has been uploaded with this application.
- Issued Jul 24, 2025
Addition and/or Alteration · Remodel of 1st fl kitchen, replacement of fixtures
- Issued Jul 22, 2025
Addition and/or Alteration · Electrical Permit for combo CP-2025-002325 EZELEC - INTERIOR ELECTRICAL WIRING AS PER 2017 NEC. Deviations from the EZ Permit standards require submission of construction and site plans.
- Issued Jul 21, 2025
1 units
Addition and/or Alteration · FOR THE LEGALIZATION OF LEVEL II INTERIOR ALTERATIONS WITH A PARTIAL CHANGE IN USE & OCCUPANCY CLASSIFICATION AT THE 2ND FLOOR TO A GROUP B RECORDING STUDIO TO COMPLY WITH VIOLATION CF-2025-028042. EXISTING BUILDING IS FULLY SPRINKLERED. ALL WORK TO BE DONE PER APPROVED PLANS AND IN ACCORDANCE WITH 2018 IEBC. SEPARATE PERMITS REQUIRED FOR MECHANICAL, ELECTRICAL, PLUMBING, AND FIRE SUPPRESSION WORK. SEE ZP-2025-003483 FOR ZONING APPROVAL OF USE CHANGE.
- Issued Jul 14, 2025
Addition and/or Alteration · AMEND 11-18-2025 New electrical 100 amp, Siemens brand subpanel Remodel of 17th fl apartment, replacement of fixtures in bathroom and kitchen
- Issued Jul 11, 2025
Addition and/or Alteration · Remodel of 1st fl powder rm, replacement of fixtures
- Issued Jul 10, 2025
Addition and/or Alteration · Electrical work in bathroom only, of 3rd fl apartment. install 3 recessed lights, replace exhaust fan, replace switches/outlets, install new wall sconce
- Issued Jul 10, 2025
Addition and/or Alteration · Remodel of 2nd fl bathroom, replacement of fixtures
Track this owner
We'll flag their next deal, permit, or filing — usually before the neighbors know.
Entities are grouped by a normalized name from the public record; a separate legal entity per building is common, so some portfolios span several related names. Sources: Phila. Dept. of Records (deeds), L&I (permits & violations), Dept. of Revenue (tax delinquencies), reflecting the record as of our last weekly ingest. Verify independently before relying on it.
Last generated August 1, 2026.