- Issued Sep 29, 2026
Addition and/or Alteration · Main Electrical Panel: Install 1 main panel in the basement, distributing power to sub-panels on each floor. Wiring: Run copper wiring from the main panel to sub-panels and outlets. Install dedicated circuits for HVAC units and appliances. Lighting: Install recessed lights, pendant fixtures, and wall-mounted lights as per the lighting schedule. Provide switches for each fixture. Outlets: Install general outlets and dedicated appliance outlets in each unit, with GFCI outlets in kitchens and
- Issued Sep 25, 2026
Addition and/or Alteration · Electrical work includes installation and/or replacement of wiring, outlets, switches, and lighting as required. Provide power to equipment as needed. AS PER NEC 2020
- Issued Sep 25, 2026
Addition and/or Alteration · Wire new bathroom and outlets and new addition per NEC 2020
- Issued Sep 2, 2026
Addition and/or Alteration · Install new 600A, 120/240V, 1-phase electrical service with (6) meter positions, (6) panels (1-200A and 5-125A/100A), feeders, branch circuits, lighting fixtures, receptacles, and connections to all equipment for a multi-family (5 units) and commercial building, in accordance with 2017 NEC. Provide complete fire alarm system including fire alarm control panel, smoke/CO detectors, horn/strobes, and wiring as per 2016 NFPA 72.
- Issued Apr 29, 2026
New Construction · AMEND 05/21/2026 Add interior wiring ______________________________________ Electrical Permit for combo RP-2022-010039
- Issued Apr 29, 2026
Addition and/or Alteration · Replaced Existing 100 Amp service with a 200 Amp service 40 Circuit.
- Issued Apr 7, 2026
Addition and/or Alteration · Install 200 amp service 40 circuit panel only. according to Nec 2017
- Issued Mar 19, 2026
Addition and/or Alteration · Install a 200 amp service 40 circuit panel according 2017 NEC
- Issued Mar 19, 2026
Addition and/or Alteration · Install a 200 amp service with existing sub panel According to NEC 2017
- Issued Mar 16, 2026
Addition and/or Alteration · Install 100 amp service with a 30 circuit panel according to NEC 2017
- Issued Feb 5, 2026
Addition and/or Alteration · Complete rewire. Install 400 amp service w/2 200 amp panels in basement. Install switches, receptacles, and lights as per 2017 NEC.
- Issued Jan 15, 2026
Addition and/or Alteration · Electrical Permit for combo RP-2025-003817
- Issued Jan 7, 2026
Addition and/or Alteration · Replace Existing 2 Gang meter pack and service Wire only. To feed 2 existing 100 amp panels.
- Issued Jan 5, 2026
New Construction · Install new 800 amp service with grounding, smoke/CO alarms, switches, fire alarm outlets, lights, and GFCI's . ALL WORK IS TO BE DONE ACCORDING TO APPROVED DRAWINGS-2017 NEC,2016 NFPA-72. AMENDMENT : Service upgrade from 800A to 1,000A. ALL WORK IS TO BE DONE ACCORDING TO APPROVED DRAWINGS-2017 NEC.
- Issued Nov 6, 2025
Addition and/or Alteration · Electrical Permit for combo RP-2024-010205
- Issued Sep 8, 2025
Addition and/or Alteration · Complete rewire with 100 amp service to current nec code
Track this owner
We'll flag their next deal, permit, or filing — usually before the neighbors know.
Entities are grouped by a normalized name from the public record; a separate legal entity per building is common, so some portfolios span several related names. Sources: Phila. Dept. of Records (deeds), L&I (permits & violations), Dept. of Revenue (tax delinquencies), reflecting the record as of our last weekly ingest. Verify independently before relying on it.
Last generated October 31, 2026.