Entity File · The Public Record
Contractor
Cellich Fire Protection
18 permits
- Records on file
- 18
Built (as contractor)
18 entries
- Issued Jun 29, 2026
New Construction · TO INSTALL NEW FIRE SUPPRESSION SYSTEM COMPLYING WITH NFPA 13 THROUGHOUT THE BUILDING TO INCLUDE 4" MAIN FIRE SERVICE LINE WITH 4" AMES 2000SS BACKFLOW PREVENTION ASSEMBLY AS PER APPROVED PLANS/ HYDRAULIC CALCULATIONS. ALL WORK SHALL BE PERFORMED BY A FIRE SUPPRESSION CONTRACTOR LICENSED BY THE CITY OF PHILADELPHIA.
- Issued Jun 18, 2026
New Construction · FOR INSTALLATION OF TWO-INCH FIRE SERVICE LINE, TWO-INCH BACKFLOW PREVENTER AND FIRE SPRINKLER SYSTEM IN ACCORDANCE WITH APPROVED PLANS, HYDRAULIC CALCULATIONS AND NFPA 13.
- Issued Jun 16, 2026
New Construction · FOR THE INSTALLATION OF A NEW FIRE SUPPRESSION SYSTEM COMPLYING WITH NFPA 13D THROUGHOUT AN EXISTING STRUCTURE. INSTALLATION TO INCLUDE 1" FIRE SERVICE LINE AS PER APPROVED PLANS. ALL WORK SHALL BE PERFORMED BY A FIRE SUPPRESSION CONTRACTOR LICENSED BY THE CITY OF PHILADELPHIA.
- Issued May 21, 2026
Rough-In · Rough-In Permit for FP-2026-000917 Applying for rough-in approval to install piping throughout walls and ceilings. No sprinkler heads, no backflow, no FDC to be installed on this permit.
- Issued Apr 22, 2026
New Construction · INSTALLATION OF AN AUTOMATIC FIRE SUPPRESSION SYSTEM IN ACCORDANCE WITH NFPA 13 WITH A FIRE DEPARTMENT CONNECTION, BACKKFLOW PREVENTION DEVICE AND 2" SERVICE LINE, THROUGHOUT COMMERCIAL SPACE ON THE FRONT PART OF FIRST FLOOR AND BASEMENT. SEPARATE PERMIT REQUIRE FOR ALL PLUMBING WORK
- Issued Apr 1, 2026
Addition and/or Alterations · EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the relocation of sprinkler heads as per attached standards. Deviations from these standards require submission of construction and site plans. Relocate 7 heads for new ceiling installation
- Issued Feb 6, 2026
Addition and/or Alterations · EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the relocation of sprinkler heads as per attached standards. Deviations from these standards require submission of construction and site plans. Relocate 6 sprinkler heads to match new ceiling height
- Issued Feb 6, 2026
New Construction · FOR THE INSTALLATION OF A NEW FIRE SUPPRESSION SYSTEM AND 1” FIRE SERVICE IN ACCORDANCE WITH NFPA 13D THROUGHOUT THE ENTIRE BUILDING. ALL WORK SHALL COMPLY WITH THE APPROVED PLANS. ALL WORK SHALL BE PERFORMED BY A FIRE SUPPRESSION CONTRACTOR LICENSED BY THE CITY OF PHILADELPHIA.
- Issued Feb 6, 2026
New Construction · FOR THE INSTALLATION OF A FIRE SUPPRESSION SYSTEM IN ACCORDANCE WITH NFPA 13R THROUGHOUT THE ENTIRE BUILDING WITH 2” FIRE SERVICE AND 2.5" BACKFLOW PREVENTION ASSEMBLY. ALL WORK SHALL COMPLY WITH THE APPROVED PLANS. ALL WORK SHALL BE PERFORMED BY A FIRE SUPPRESSION CONTRACTOR LICENSED BY THE CITY OF PHILADELPHIA.
- Issued Jan 26, 2026
New Construction · FOR THE INSTALLATION OF A FIRE SUPPRESSION SYSTEM IN ACCORDANCE WITH NFPA 13 THROUGHOUT THE ENTIRE BUILDING WITH 2” FIRE SERVICE AND 2" BACKFLOW PREVENTION ASSEMBLY. ALL WORK SHALL COMPLY WITH THE APPROVED PLANS. ALL WORK SHALL BE PERFORMED BY A FIRE SUPPRESSION CONTRACTOR LICENSED BY THE CITY OF PHILADELPHIA.
- Issued Jan 20, 2026
New Construction · FOR INSTALLATION OF A TWO-INCH FIRE SERVICE LINE, TWO-INCH BACKFLOW PREVENTER AND FIRE SPRINKLER SYSTEM IN ACCORDANCE WITH APPROVED PLANS, HYDRAULIC CALCULATIONS AND NFPA 13.
- Issued Jan 2, 2026
New Construction · INSTALLATION OF AN AUTOMATIC FIRE SUPPRESSION SYSTEM IN ACCORDANCE WITH NFPA 13 WITH A FIRE DEPARTMENT CONNECTION, BACKKFLOW PREVENTION DEVICE AND 2" SERVICE LINE, THROUGHOUT A THREE (3) STORY STRUCTURE. SEPARATE PERMIT REQUIRE FOR ALL PLUMBING WORK
- Issued Nov 27, 2025
New Construction · FOR THE INSTALLATION OF AN NFPA 13R SYSTEM FOR A SINGLE-FAMILY DWELLING SERVICED BY A TWO (2) INCH FIRE SERVICE LINE WITH A 2-INCH WILKINS 950XLT2 BACKFLOW PREVENTER AND AUTOMATIC FIRE SUPPRESSION SYSTEM. ALL WORK SHALL BE DONE IN ACCORDANCE WITH APPROVED PLANS/HYDRAULIC CALCULATIONS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK.
- Issued Nov 20, 2025
Rough-In · For minor construction work at the subject property in accordance with all applicable provisions of the Philadelphia Code, all references codes and standards, and the attached EZ Standard, where included. Deviation from this standard shall result in permit revocation. A separate permit from the Philadelphia Department of Streets is required for any sidewalk and street closures. All means of pedestrian protection required at the site in accordance with the Philadelphia Building Code Chapter 33 sh
- Issued Sep 25, 2025
Addition and/or Alterations · EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the relocation of sprinkler heads as per attached standards. Deviations from these standards require submission of construction and site plans. Relocate two automatic sprinkler heads in basement into walk-in coolers.
- Issued Sep 15, 2025
New Construction · INSTALL NEW FIRE SUPPRESSION SYSTEM COMPLYING WITH NFPA 13 THROUGHOUT THE BUILDING TO INCLUDE 2" MAIN FIRE SERVICE LINE WITH 2 " WILKINS 950XLT2 BACKFLOW PREVENTION ASSEMBLY AND FIRE SYSTEM TO INCLUDE THE INSTALLATION OF TWO (2) STANDPIPES IN EXIT STAIRWAYS, STANDPIPES TO BE INTERCONNECTED PER NFPA 14. AS PER APPROVED PLANS. ALL WORK SHALL BE PERFORMED BY A FIRE SUPPRESSION CONTRACTOR LICENSED BY THE CITY OF PHILADELPHIA.
- Issued Aug 20, 2025
Addition and/or Alterations · EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the Relocation of Sprinkler Heads as per attached standards. Deviations from these standards require submission of construction and site plans. *CP-2025-002553* Relocate twenty two (22) automatic sprinkler heads to match new ceiling heights
- Issued Jul 14, 2025
New Construction · INSTALL NEW FIRE SUPPRESSION SYSTEM COMPLYING WITH NFPA 13 THROUGHOUT THE BUILDING TO INCLUDE 2" MAIN FIRE SERVICE LINE WITH 2-INCH WILKINS 950XLT2 BACKFLOW PREVENTER AND AUTOMATIC FIRE SUPPRESSION SYSTEM. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK.
Track this owner
We'll flag their next deal, permit, or filing — usually before the neighbors know.
Entities are grouped by a normalized name from the public record; a separate legal entity per building is common, so some portfolios span several related names. Sources: Phila. Dept. of Records (deeds), L&I (permits & violations), Dept. of Revenue (tax delinquencies), reflecting the record as of our last weekly ingest. Verify independently before relying on it.
Last generated July 15, 2026.