- Issued Oct 22, 2026
1 units
Addition and/or Alteration · FOR A LEVEL II INTERIOR ALTERATIONS TO INCLUDE ACHANGE IN OCCUPANCY. FOR A BUSINESS OCCUPANCY. ALL WORK TO BE DONE PER APPROVED PLANS.** IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK**IEBC 2021**EXISTING BUILDING FULLY SPRINKLERED** SEPARATE PERMITS REQUIRED FOR ALL OTHER WORK**
- Issued Oct 22, 2026
1 units
Addition and/or Alteration · FOR LEVEL II ALTERATIONS TO AN EXISTING STRUCTURE. ALTERATIONS TO INCLUDE PARTIAL DEMOLITION AND THE ERECTION OF PARTITION WALLS, PROVIDE FINISHES/FURNISHINGS AND ACCESSIBILITY IMPROVEMENTS THROUGHOUT. FOR USE AS PREVIOUSLY APPROVED. ALL WORK TO BE DONE PER APPROVED PLANS. ***************** SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK. ******************************************
- Issued Sep 17, 2026
1 units
New Construction · Erection of a four-story single-family dwelling. excavations have already been approved under SP-2023-001188 for the entire site (moved to 1845 N HANCOCK ST, the parcel for the common element). details as shwon on the plan.
- Issued May 1, 2026
1 units
New Construction · FOR THE ERECTION OF A THREE (3) STORY ATTACHED STRUCTURE OF TYPE V-B CONSTRUCTION (MAXIMUM HEIGHT NTE 60 FEET) WITH CELLAR, ROOF DECK (FOR RESIDENTIAL USE ONLY), AND A ROOF ACCESS STRUCTURE. FOR USE AS A SINGLE-FAMILY DWELLING (GROUP R-3) WITH ONE (1) OFF-STREET INTERIOR PARKING SPACE. BUILDING TO BE FULLY SPRINKLERED WITH A MINIMUM OF A NFPA 13D AUTOMATIC SPRINKLER SYSTEM. ALL WORK TO BE DONE PER APPROVED PLANS AND IN ACCORDANCE WITH 2018 IRC. SEPARATE PERMITS REQUIRED FOR MECHANICAL, ELECTRICA
- Issued May 1, 2026
1 units
New Construction · FOR THE ERECTION OF A THREE (3) STORY ATTACHED STRUCTURE OF TYPE V-B CONSTRUCTION (MAXIMUM HEIGHT NTE 60 FEET) WITH CELLAR, ROOF DECK (FOR RESIDENTIAL USE ONLY), AND A ROOF ACCESS STRUCTURE. FOR USE AS A SINGLE-FAMILY DWELLING (GROUP R-3) WITH ONE (1) OFF-STREET INTERIOR PARKING SPACE. BUILDING TO BE FULLY SPRINKLERED WITH A MINIMUM OF A NFPA 13D AUTOMATIC SPRINKLER SYSTEM. ALL WORK TO BE DONE PER APPROVED PLANS AND IN ACCORDANCE WITH 2018 IRC. SEPARATE PERMITS REQUIRED FOR MECHANICAL, ELECTRICA
- Issued May 1, 2026
1 units
New Construction · FOR THE ERECTION OF A THREE (3) STORY ATTACHED STRUCTURE OF TYPE V-B CONSTRUCTION (MAXIMUM HEIGHT NTE 60 FEET) WITH CELLAR, ROOF DECK (FOR RESIDENTIAL USE ONLY), AND A ROOF ACCESS STRUCTURE. FOR USE AS A SINGLE-FAMILY DWELLING (GROUP R-3) WITH ONE (1) OFF-STREET INTERIOR PARKING SPACE. BUILDING TO BE FULLY SPRINKLERED WITH A MINIMUM OF A NFPA 13D AUTOMATIC SPRINKLER SYSTEM. ALL WORK TO BE DONE PER APPROVED PLANS AND IN ACCORDANCE WITH 2018 IRC. SEPARATE PERMITS REQUIRED FOR MECHANICAL, ELECTRICA
- Issued Apr 28, 2026
1 units
New Construction · FOR THE ERECTION OF AN ATTACHED STRUCTURE FOR USE AS A SINGLE-FAMILY HOUSEHOLD LIVING. SHEETING AND SHORING AS PRESCRIBED IN GEOTECH REPORT. (UNDERPINNING NOT A PART OF THIS PERMIT). SEPARATE PERMITS REQUIRED FOR SPRINKLER (NFPA 13R) WORK. ENERGY CODE COMPLIANCE IN ACCORDANCE WITH 2018 IECC. PRIOR TO ISSUANCE OF C/O SUBMITTAL OF AIR BARRIER CHECKLIST AND ENVELOPE TESTING CERTIFICATE IS REQUIRED. BOTH TO BE COMPLETED BY AN APPROVED PARTY.
- Issued Apr 24, 2026
1 units
New Construction · FOR THE ERECTION OF AN ATTACHED STRUCTURE FOR USE AS A SINGLE-FAMILY HOUSEHOLD LIVING. SHEETING AND SHORING AS PRESCRIBED IN GEOTECH REPORT. (UNDERPINNING NOT A PART OF THIS PERMIT). SEPARATE PERMITS REQUIRED FOR SPRINKLER (NFPA 13R) WORK. ENERGY CODE COMPLIANCE IN ACCORDANCE WITH 2018 IECC. PRIOR TO ISSUANCE OF C/O SUBMITTAL OF AIR BARRIER CHECKLIST AND ENVELOPE TESTING CERTIFICATE IS REQUIRED. BOTH TO BE COMPLETED BY AN APPROVED PARTY.
- Issued Apr 24, 2026
1 units
New Construction · FOR THE ERECTION OF AN ATTACHED STRUCTURE FOR USE AS A SINGLE-FAMILY HOUSEHOLD LIVING. SHEETING AND SHORING AS PRESCRIBED IN GEOTECH REPORT. (UNDERPINNING NOT A PART OF THIS PERMIT). SEPARATE PERMITS REQUIRED FOR SPRINKLER (NFPA 13R) WORK. ENERGY CODE COMPLIANCE IN ACCORDANCE WITH 2018 IECC. PRIOR TO ISSUANCE OF C/O SUBMITTAL OF AIR BARRIER CHECKLIST AND ENVELOPE TESTING CERTIFICATE IS REQUIRED. BOTH TO BE COMPLETED BY AN APPROVED PARTY.
- Issued Apr 22, 2026
1 units
New Construction · FOR THE ERECTION OF AN ATTACHED STRUCTURE FOR USE AS A SINGLE-FAMILY HOUSEHOLD LIVING. SHEETING AND SHORING AS PRESCRIBED IN GEOTECH REPORT. (UNDERPINNING NOT A PART OF THIS PERMIT). SEPARATE PERMITS REQUIRED FOR SPRINKLER (NFPA 13R) WORK. ENERGY CODE COMPLIANCE IN ACCORDANCE WITH 2018 IECC. PRIOR TO ISSUANCE OF C/O SUBMITTAL OF AIR BARRIER CHECKLIST AND ENVELOPE TESTING CERTIFICATE IS REQUIRED. BOTH TO BE COMPLETED BY AN APPROVED PARTY.
- Issued Aug 27, 2025
9 units
Addition and/or Alteration · FOR CHANGE OF OCCUPANCY AND LEVEL III ALTERATIONS TO INCLUDE NEW PARTITIONS, FIXTURES, FURNISHINGS, FINISHES AS PER APPROVED PLANS. BUILDING TO FULLY SPRINKLERED PER NFPA 13. SEPARATE PERMITS REQUIRED FOR MEP AND FIRE SUPPRESSION WORK. *2018 IEBC* AMENDMENT 11/6/2025 TO INCLUDE NEW PARTITIONS AND DOORS AS PER APPROVED PLANS. AMENDMENT 3/24/2026 TO ADD DRAIN AND SUMP PUMP.
Track this owner
We'll flag their next deal, permit, or filing — usually before the neighbors know.
Entities are grouped by a normalized name from the public record; a separate legal entity per building is common, so some portfolios span several related names. Sources: Phila. Dept. of Records (deeds), L&I (permits & violations), Dept. of Revenue (tax delinquencies), reflecting the record as of our last weekly ingest. Verify independently before relying on it.
Last generated November 3, 2026.