  1. Issued Nov 2, 2026

    201 N 21st St

    Addition and/or Alteration · Demolition of existing Substations and Transformers piping and cabling demolition of existing Main Tie Main installation of new MV transformers, Substations , Main Tie Main, new lighting new PECO 13,2 service cables as per 2017 NEC.

  2. Issued Sep 22, 2026

    201 N 21st St

    Addition and/or Alterations · ALTERATIONS TO HVAC SYSTEM IN THE BASEMENT LEVEL OF AN EXISTING MUSEUM FACILITY AS PER APPROVED PLANS. *2021 IMC REVIEW*

  3. Issued Sep 15, 2026

    201 N 21st St

    Alterations · Plumbing Permit (Interior) for combo CP-2026-005079

  4. Issued Sep 14, 2026

    1 units

    201 N 21st St

    Addition and/or Alteration · FOR LEVEL II ALTERATIONS TO INCLUDE TO REMOVAL OF FIXTURES, REPLACEMENT OF FIXTURES, NEW PARTITIONS, DOORS, FURNISHINGS, FINISHES AS PER APPROVED PLANS. SEPARATE PERMIT REQUIRED FOR ANY MEP AND FIRE SUPPRESSION WORK. *2021 IEBC*

  5. Issued Sep 5, 2026

    201 N 21st St

    Addition and/or Alterations · FOR A MECHANICAL SYSTEM UPGRADE TO AN EXISTING STRUCTURE. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK.

  6. Issued Aug 20, 2026

    201 N 21st St

    Addition and/or Alterations · FOR RELOCATION OF SPRINKLER HEADS IN ACCORDANCE WITH APPROVED PLANS, HYDRAULIC CALCULATIONS AND NFPA 13.

  7. Issued Aug 18, 2026

    201 N 21st St

    EZ Interior Non-Load-Bearing Wall Demo. · - For the interior demolition on NON-Load-Bearing partition walls and ceilings as per attached standard. Deviations from these standards require submission of construction and site plans. Alteration/Repair is STRICTLY PROHIBITED with this permit type. No exterior work permitted as part of this permit. No work to exterior windows and/or doors as part of this permit. No work to front facade as part of this permit as per PHC.

  8. Issued Aug 4, 2026

    201 N 21st St

    Alterations · For minor construction work at the subject property in accordance with all applicable provisions of the Philadelphia Code, all references codes and standards, and the attached EZ Standard, where included. Deviation from this standard shall result in permit revocation. A separate permit from the Philadelphia Department of Streets is required for any sidewalk and street closures. All means of pedestrian protection required at the site in accordance with the Philadelphia Building Code Chapter 33 sh

  9. Issued Jul 27, 2026

    201 N 21st St

    Addition and/or Alteration · Install 11 new smoke detectors and 1 additional speaker strobe ALL WORK IS TO BE DONE ACCORDING TO APPROVED DRAWINGS-2020 NEC ,2019 NFPA-72.

  10. Issued Jul 2, 2026

    201 N 21st St

    Addition and/or Alteration · IT room and cabling plenum 250'

  11. Issued Jun 22, 2026

    201 N 21st St

    Alterations · Install (2) air lines and (1) hub drain, connecting to existing piping.

  12. Issued Jun 17, 2026

    1 units

    201 N 21st St

    Addition and/or Alteration · FOR STRUCTIRAL IMPROVEMENT TO A PORTION OF AN EXISTING STRUCTURE. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN PROFESSIONAL PRIOR TO THE START OF ANY WORK. ** SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK. **

  13. Issued Apr 10, 2026

    1 units

    201 N 21st St

    Addition and/or Alteration · FOR LEVEL II INTERIOR ALTERATIONS WITHOUT A CHANGE IN USE AND OCCUPANCY CLASSIFICATION TO AN EXISTING GROUP A-3 MUSEUM GALLERY AND IT RACK ROOM AT THE 2ND FLOOR. EXISTING BUILDING IS SPRINKLERED. ALL WORK TO BE DONE PER APPROVED PLANS AND IN ACCORDANCE WITH 2021 IEBC AND PHC APPROVAL. SEPARATE PERMITS REQUIRED FOR MECHANICAL, ELECTRICAL, PLUMBING, AND FIRE SUPPRESSION WORK. **ASBESTOS ABATEMENT REQUIRED.**

  14. Issued Feb 11, 2026

    201 N 21st St

    EZ Interior Non-Load-Bearing Wall Demo. · EZ INTERIOR NON-LOAD-BEARING WALL DEMOLITION - For the interior demolition on NON-Load-Bearing partition walls and ceilings as per attached standard. Deviations from these standards require submission of construction and site plans. Structural alteration or repair is expressly PROHIBITED under this permit. Prohibited structural work includes but not limited to any modification to exterior walls, party wall, floor/roof framing and foundations, including underpinning, excavation and removal of fou

  15. Issued Aug 15, 2025

    201 N 21st St

    Addition and/or Alteration · INSTALL WIRING AND RELOCATE LIGHTING, SWITCHES AND RECEPTACLE OUTLETS. INSTALL LOW VOLTAGE WIRING. ALL WORK TO BE DONE ACCORDING TO THE 2017 NEC AND PER PLANS.

  16. Issued Jul 21, 2025

    201 N 21st St

    Addition and/or Alteration · Installation of seventeen (17) low voltage Category 6 computer wires as per NEC 2017.

  17. Issued Jul 11, 2025

    1 units

    201 N 21st St

    Addition and/or Alteration · FOR LEVEL II ALTERATIONS TO AN EXISTING RETAIL (MERCANTILE-M) SPACE, ALTERATIONS TO INCLUDE THE ERECTION OF PARTITION WALLS, PROVIDE FINISHES/FURNISHINGS AND ACCESSIBILITY IMPROVEMENTS THROUGHOUT. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK.

Violations

16 entries

  1. Violation Dec 4, 2025OPEN

    201 N 21st St

    INSPECTION, TESTING & MAINTENANCE

  2. Violation Dec 4, 2025OPEN

    201 N 21st St

    SUPPRESSION SYSTEM TESTING & MAINTENANCE

  3. Violation Mar 10, 2025OPEN

    201 N 21st St

    INSPECTION, TESTING & MAINTENANCE

  4. Violation Mar 10, 2025OPEN

    201 N 21st St

    SUPPRESSION SYSTEM TESTING & MAINTENANCE

  5. Violation Mar 10, 2025OPEN

    201 N 21st St

    EMERGENCY POWER FOR ILLUMINATION

  6. Violation Mar 10, 2025OPEN

    201 N 21st St

    HAZARDOUS MATERIALS

  7. Violation Mar 10, 2025OPEN

    201 N 21st St

    UTILITY IDENTIFICATION

  8. Violation Mar 10, 2025OPEN

    201 N 21st St

    HAZARD IDENTIFICATION SIGNS

  9. Violation Mar 10, 2025OPEN

    201 N 21st St

    OCCUPANT LOAD SIGN

  10. Violation Mar 10, 2025OPEN

    201 N 21st St

    SECURING COMPRESSED CYLINDERS

  11. Violation Mar 10, 2025OPEN

    201 N 21st St

    EXIT DOORS

  12. Violation Mar 10, 2025OPEN

    201 N 21st St

    FIRE EXTINGUISHERS

  13. Violation Mar 10, 2025OPEN

    201 N 21st St

    PENETRATIONS MAINTAINING PROTECTION

  14. Violation Mar 10, 2025OPEN

    201 N 21st St

    WET CHEMICAL SYSTEM TEST

  15. Violation Mar 10, 2025OPEN

    201 N 21st St

    UNAPPROVED CONDITIONS

  16. Violation Mar 10, 2025OPEN

    201 N 21st St

    PERIODIC TESTING

Track this owner

We'll flag their next deal, permit, or filing — usually before the neighbors know.

Entities are grouped by a normalized name from the public record; a separate legal entity per building is common, so some portfolios span several related names. Sources: Phila. Dept. of Records (deeds), L&I (permits & violations), Dept. of Revenue (tax delinquencies), reflecting the record as of our last weekly ingest. Verify independently before relying on it.
Last generated November 25, 2026.