Entity File · The Public Record
Company / LLC
City Of Phila, Spectrum Arena CORP
28 permits
- Records on file
- 28
Permits (as owner)
28 entries
- Issued Jun 8, 2026
1 units
Addition and/or Alteration · INSTALLATION OF ILLUMINATED ENTRANCEWAY ARCH STRUCTURE FOR EXISTING OUTDOOR EVENT SPACE ON EXISTING FOUNDATIONS (SEE PERMIT CP-2025-001045) AS PER APPROVED PLANS. *2018 IBC REVIEW* **SEPARATE PERMIT REQUIRED FOR ELECTRICAL WORK**
- Issued May 8, 2026
Sign · FOR THE ERECTION OF THREE (3) NON-ILLUMINATED DIRECTIONAL WALL SIGNS (A06, A07, R04), ONE (1) NON-ILLUMINATED DOUBLE-FACED FREESTANDING DIRECTIONAL SIGN (A12), THREE (3) STATIC INTERNALLY-ILLUMINATED ACCESSORY WALL SIGNS (E01 & C01), TWO (2) NON-ILLUMINATED ACCESSORY MURAL WALL SIGNS (E03 & E08), ONE (1) NON-ILLUMINATED FREESTANDING ACCESSORY SIGN (E05), FOUR (4) FREESTANDING ACCESSORY BANNER SIGNS (E06), AND ONE (1) STATIC INTERNALLY-ILLUMINATED FREESTANDING ACCESSORY SIGN (G01). SEPARATE PERMI
- Issued May 4, 2026
New Construction or Additions · INSTALLATION OF ONSITE UTILITIES AS LISTED AND RE-ROUTING OF EXISTING UTILITIES. ALL PLUMBING TO BE PERFORMED IN STRICT COMPLIANCE WITH 2018 PPC AND APPROVED PLANS. NO BUILDING PLUMBING OR CONNECTIONS TO BUILDING HOUSE DRAINS TO BE PERFORMED UNDER THIS PERMIT.
- Issued Apr 27, 2026
Sign · FOR THE INSTALLATION OF THREE (3) INTERNALLY ILLUMINATED ACCESSORY WALL SIGNS. SIZE AND LOCATION AS SHOWN ON PLANS. SIGNS ACCESSORY TO A SIT-DOWN RESTAURANT.
- Issued Mar 2, 2026
Addition and/or Alteration · Install Audio visual equipment for new outdoor areas of Stateside live which includes the following equipment. 55", 65", 75" 85" monitors at various locations, Ceiling speakers, outdoor wall speakers, Stage speaker clusters, subwoofers, touch panels for controlling Audio Visual, DJ booth with mixing equipment, input plates for system,
- Issued Feb 23, 2026
Addition and/or Alterations · FOR ALTERATIONS TO AN EXISTING NFPA 13 AUTOMATIC SPRINKLER SYSTEM TO INSTALL ELEVEN (11) NEW SPRINKLER HEADS AS PER APPROVED PLANS. ALL WORK TO BE DONE BY A FIRE SUPPRESSION CONTRACTOR LICENSED BY THE CITY OF PHILADELPHIA. SEE CP-2025-001049 FOR ASSOCIATED BUILDING PERMIT.
- Issued Feb 6, 2026
Signs (Accessory / Non-Accessory) · FOR THE REPLACEMENT OF THREE (3) INTERNALLY ILLUMINATED ACCESSORY WALL SIGNS AND TO DOCUMENT THE REMOVAL OF ONE (1) ACCESSORY BLADE SIGN. SIZE AND LOCATION AS SHOWN ON PLANS. PER THE “MASTER PLAN” AND BY ORDINANCE OF CITY COUNCIL (BILL NO. 100363)
- Issued Feb 4, 2026
New Construction or Additions · EXTENSION OF EXISTING BUILDING TO CREATE A RESTAURANT/BAR SPACE. INTERIOR INSTALLATION OF DRAINAGE, WASTE, VENT, AND WATER SUPPLY FOR LISTED FIXTURES.
- Issued Jan 28, 2026
New Construction · Complete electrical fitout of detached, 1-story structure including light fixtures, receptacles, MEP connections and Includes low-voltage telecom/security/audio-visual cabling as required and fire alarm per plans, 2017 NEC & NFPA72 2016 & The Philadelphia Fire code 2018.
- Issued Jan 6, 2026
New Construction · Complete electrical fitout of two-story open air pavilion including light fixtures, receptacles, MEP connections and fire alarm per plans, 2017 NEC & 2016 NFPA72. Includes low-voltage telecom/security/audio-visual cabling as required.
- Issued Dec 29, 2025
Addition and/or Alterations · FOR THE INSTALLATION OF 133 NEW PENDENT SPRINKLERS TO AN EXISTING FIRE SUPPRESSION SYSTEM COMPLYING WITH NFPA 13 THROUGHOUT THE BUILDING. AS PER APPROVED PLANS. ALL WORK SHALL BE PERFORMED BY A FIRE SUPPRESSION CONTRACTOR LICENSED BY THE CITY OF PHILADELPHIA. ALL WORK SHALL BE DONE IN ACCORDANCE WITH APPROVED PLANS/HYDRAULIC CALCULATIONS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK.
- Issued Dec 26, 2025
New Construction or Additions · INTERIOR ALTERATIONS TO FINISH BAR SPACES IN EXISTING COMMERCIAL SPORTS COMPLEX. INSTALLATION OF DRAINAGE WASTE, VENT, AND WATER SUPPLY FOR LISTED FIXTURES. NO FOOD PREPERATIONS FIXTURES ARE BEING INSTALLED. FUTURE CONNECTIONS TO KITCHEN WITH GREASE INTERCEPTOR INCLUDED IN PROJECT. ALL MATERIALS UTILIZED FOR THE ENTIRETY OF THIS PROJECT TO BE METALLIC WITH APPROVED JOINTS ABOVE AND BELOW GRADE. ALL WORK TO BE PERFORMED IN STRICT COMPLIANCE WITH 2018 PPC AND APPROVED PLANS.
- Issued Dec 15, 2025
New Construction or Additions · ALTERATIONS TO CREAT A BEER GARDEN. INTERIOR INSTALLATION OF DRAINAGE, WASET, VENT, AND WATER SUPPLY FOR LISTED FIXTURES. ALL MATERIALS TO BE METALLIC TO ROOF EXTENSION. VENTING TO BE DESIGNED AND INSTALLED IN ACORDANCE WITH SECTION 919 PHILADELPHIA SINGLE STACK VENT SYSTEM. ALL WORK TO BE PERFORMED IN STRICT COMPLIANCE WITH 2018 PPC AND APPROVED PLANS.
- Issued Dec 8, 2025
New Construction · FOR THE INSTALLATION OF HVAC APPLIANCES, GRDs, AND EXHAUSTS WITH ASSOCIATED DUCTWORK AND FUEL GAS PIPING AS PER APPROVED PLANS AND IN ACCORDANCE WITH 2018 IMC AND 2018 IFGC. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK. SEE CP-2025-001048 FOR ASSOCIATED BUILDING PERMIT.
- Issued Dec 8, 2025
Addition and/or Alterations · FOR THE INSTALLATION OF FUEL GAS PIPING AS PER APPROVED PLANS AND IN ACCORDANCE WITH 2018 IFGC. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK. SEE CP-2025-001046 FOR ASSOCIATED BUILDING PERMIT.
- Issued Dec 4, 2025
Addition and/or Alterations · FOR THE INSTALLATION OF REGISTERS, DIFFUSERS, AND APPLIANCES WITH ASSOCIATED DUCTWORK. APPLIANCES TO BE INSTALLED IN ACCORDANCE WITH MANUFACTURER'S SPECIFICATIONS. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS REQUIRED FOR ALL OTHER WORK.
- Issued Dec 3, 2025
Excavation · FOR EXCAVATION OF ELEVATOR PIT USING PERSCRIPTIVE SHORING MEASURES AS PER APPROVED PLANS. SEPARATE PERMITS REQUIRED FOR ALL OTHER WORK.
- Issued Dec 3, 2025
New Construction or Additions · Complete Plumbing Rough In and Finish of Stage Area Toilet Room and Roof Drainage. Domestic Water, Sanitary above and below grade, Storm above and below grade. Supply and install 4 toilet room fixtures.
- Issued Dec 2, 2025
Addition and/or Alteration · Electrical fit-out for exterior beer garden. Install panelboard and branch-circuit wiring for lighting, lighting controls, receptacle outlets, and telecommunications wiring. ALL WORK TO BE DONE ACCORDING TO THE 2017 NEC AND PER PLANS.
- Issued Nov 26, 2025
Addition and/or Alteration · Complete electrical fitout of exterior addition including 400A breaker ,transformer, switchboard, receptacles light fixtures, MEP connections and fire alarm per plans, 2017 NEC & NFPA72. Includes low-voltage telecom/security/audio-visual cabling as required. Reference building permit CP-2025-001049
- Issued Oct 21, 2025
1 units
New Construction · FOR THE ERECTION OF ONE (1) TWO-STORY STRUCTURE (OPEN AIR PAVILION) FOR USE AS SIT-DOWN RESTUARUANT. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMIITS TO BE OBTAINED FOR ALL OTHER WORK. AMENDMENT 4/21/2026 TO REFLECT DESIGN CHANGES, NEW SPECIAL INSPECTION AGENCY, AND OTHER MINOR MODIFICATIONS.
- Issued Oct 7, 2025
1 units
New Construction · FOR THE ERECTION OF AN DETACHED 1-STORY STRUCTURE FOR USE AS BUSINESS OCCUPANCY - ENTERTAINMENT PLATFORM AND GREEN ROOM, ACCESSORY TO A LARGER ENTERTAINMENT/RESTAURANT VENUE. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMIITS TO BE OBTAINED FOR ALL OTHER WORK. **NEW CONSTRUCTION INCLUDES DISMANTLING AND RE-USE OF EXISTING PLATFORM (BIN #1440676)** NO EXCAVATION GREATER THAN 60 INCHES WITH THIS PERMIT ** **AME
- Issued Sep 17, 2025
Sign · FOR REPLACEMENT OF THREE (3) ILLUMINATED, CHANNEL-LETTER, ACCESSORY WALL SIGNS PER APPROVED PLANS.
- Issued Sep 10, 2025
Sitework with Onsite Utility Services · SITEWORK ASSOCIATED WITH NEW UTILITY WORK AND BASINS AS PER APPROVED PLANS. *2018 IBC REVIEW* **SEPARATE PERMIT REQUIRED FOR PLUMBING WORK**
- Issued Aug 25, 2025
1 units
Addition and/or Alteration · FOR EXTERIOR ADDITION AND ALTERATIONS TO INCLUDE PAVILION, DECK, STAGE, BAR, BUILT IN SEATING, FURNISHINGS AND FINISHES AS PER APPROVED PLANS. SEPARATE PERMITS REQUIRED FOR AND MEP WORK. *2018 IBC* *NO EXCAVATION GREATER THAN 5FT.* AMENDMENT 12/28/2025 TO REFLECT DESIGN CHANGES, NEW SPECIAL INSPECTION AGENCY, AND OTHER MINOR MODIFICATIONS.
- Issued Aug 21, 2025
1 units
Addition and/or Alteration · LEVEL II EXTERIOR ALTERATIONS TO INCLUDE CREATION OF OUTDOOR PLAZA SPACE FOR VENUE F-4 (CRUSH BAR) AS PER APPROVED PLANS. *2018 IEBC REVIEW* **SEPARATE PERMITS REQUIRED FOR ANY MEP WORK**
- Issued Aug 18, 2025
1 units
Addition and/or Alteration · LEVEL II EXTERIOR ALTERATIONS TO INCLUDE THE CREATION OF A BEER GARDEN AS PER APPROVED PLANS. *2018 IEBC REVIEW* **SEPARATE PERMITS REQUIRED FOR ANY MEP WORK** EXTERIOR WORK ONLY**AMENDED AS OF 12/19/2025 PER APPROVED PLANS. CHANGE IN SPECIAL INSPECTION AGENCY TO APPOINT ECS MID ATLANTIC LLC PER UPDATED DOCUMENTATION.**
Track this owner
We'll flag their next deal, permit, or filing — usually before the neighbors know.
Entities are grouped by a normalized name from the public record; a separate legal entity per building is common, so some portfolios span several related names. Sources: Phila. Dept. of Records (deeds), L&I (permits & violations), Dept. of Revenue (tax delinquencies), reflecting the record as of our last weekly ingest. Verify independently before relying on it.