Entity File · The Public Record
Owner of record
City Of Philadelphia
74 permits · 72 violations
- Records on file
- 146
Permits (as owner)
74 entries
- Issued Jul 7, 2026
New construction, addition, GFA change · New construction of a two story single-family structure as per approved plan NTE 38' in height, Turn key affordable housing program
- Issued Jul 6, 2026
1 units
Addition and/or Alteration · FOR THE ERECTION OF STEEL UTILITY BRIDGE AS PER APPROVED PLANS. SEPARATE PERMITS REQUIRED FOR ANY MEP WORK. *IBC 2018*
- Issued Jun 18, 2026
Addition and/or Alterations · EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the relocation of sprinkler heads as per attached standards. Deviations from these standards require submission of construction and site plans. MK Fire Protection to relocate 11 sprinkler heads throughout permitted space
- Issued Jun 11, 2026
Addition and/or Alteration · Electrical Permit for combo CP-2025-001437
- Issued May 26, 2026
New Construction · Mechanical / Fuel Gas Permit for combo RP-2025-009134
- Issued May 22, 2026
New Construction · INSTALL NEW FIRE SUPPRESSION SYSTEM COMPLYING WITH NFPA 13D THROUGHOUT AN EXISTING STRUCTURE. INSTALLATION TO INCLUDE 1" COMBINED AS PER APPROVED PLANS. **ALL WORK SHALL BE PERFORMED BY A FIRE SUPPRESSION CONTRACTOR LICENSED BY THE CITY OF PHILADELPHIA.**
- Issued May 21, 2026
1 units
New Construction · FOR THE ERECTION OF A TWO (2) STORY ATTACHED STRUCTURE WITH BASEMENT FOR USE AS A SINGLE-FAMILY DWELLING (GROUP R-3). BUILDING TO BE FULLY SPRINKLERED PER NFPA 13D. ALL WORK TO BE DONE PER APPROVED PLANS AND IN ACCORDANCE WITH 2018 IRC. SEPARATE PERMITS REQUIRED FOR MECHANICAL, ELECTRICAL, PLUMBING, FIRE SUPPRESSION, AND EXCAVATION WORK. ENERGY CODE COMPLIANCE IN ACCORDANCE WITH 2018 IECC. PRIOR TO ISSUANCE OF C.O., SUBMITTAL OF AIR BARRIER CHECKLIST AND ENVELOPE TESTING CERTIFICATE IS REQUIRED.
- Issued May 13, 2026
Signs (Accessory / Non-Accessory) · **Amendment 5/28/2026 for the height increase of one (1) free-standing sign.** For the replacement of one (1) free-standing sign with static illumination and LED digital display (digital sign) accessory to the building use. Size and location as shown in application/plans.
- Issued May 12, 2026
Excavation · Site / Utility Permit for RP-2025-010032, RP-2025-010044, RP-2025-010046, RP-2025-010048, RP-2025-010049, RP-2025-010050.
- Issued May 7, 2026
New Construction or Additions · Install vents, drains, water lines, 2 toilets, 2 lavs, 1 kitchen sink, 1 tub, 1 shower, 1 hot water heater, 1 washer box, 1 hose bib, 1 sump pump, 1 ejector pump, house drain, house trap, fresh air inlets, and a 1" combined water line.
- Issued May 6, 2026
New Construction · FOR THE INSTALLATION OF AN AUTOMATIC FIRE SUPPRESSION SYSTEM IN ACCORDANCE WITH NFPA 13D THROUGHOUT TWO-STORY BUILDING TO INCLUDE 1-INCH COMBINED WATER SERVICE LINE AS PER APPROVED PLANS. ALL WORK SHALL BE DONE IN ACCORDANCE WITH APPROVED PLANS/HYDRAULIC CALCULATIONS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK.
- Issued Apr 24, 2026
New Construction · FOR THE INSTALLATION OF AN AUTOMATIC WET SPRINKLER SYSTEM THROUGHOUT A TWO-STORY SINGLE-FAMILY DWELLING TO INCLUDE A ONE (1) INCH COMBINED DOMESTIC & FIRE SERVICE LINE. ALL WORK TO BE DONE PER APPROVED PLANS AND IN ACCORDANCE WITH NFPA 13D BY A FIRE SUPPRESSION CONTRACTOR LICENSED BY THE CITY OF PHILADELPHIA. SEE RP-2025-006904 FOR ASSOCIATED BUILDING PERMIT.
- Issued Apr 6, 2026
Addition and/or Alteration · Add new fire alarm devices to existing system located on the first floor as per 2016 NFPA 72.
- Issued Mar 27, 2026
New Construction or Additions · INSTALL NEW CT, FAI, MD & 1" WDP. Install vents, drains, water lines & 12 fixtures... 2 toilets, 2 lavs, 1 kitchen sink, 1 tub, 1 shower, 1 hot water heater, 1 washer box, 1 hose bib, 1 sump pump & 1 ejector pump.
- Issued Mar 23, 2026
New Construction or Additions · INSTALL CT, FAI, MD & 1" WDP. Install vents, drains, water lines & 12 fixtures. 2 toilets, 2 lavs, 1 kitchen sink, 1 tub, 1 shower, 1 hot water heater, 1 washer box, 1 hose bib, 1 sump pump, 1 ejector pump.
- Issued Mar 17, 2026
Combined Lot Line Relocation and New Development · FOR THE RELOCATION OF LOT LINES TO CREATE ONE LOT (PROPOSED PARCEL) FROM TWO EXISTING LOTS (1441 N 17TH ST & 1443 N 17TH ST). SIZE AND LOCATION AS SHOWN IN PLANS.
- Issued Mar 12, 2026
New Construction · Mechanical / Fuel Gas Permit for combo RP-2025-006906
- Issued Mar 12, 2026
New Construction · Mechanical / Fuel Gas Permit for combo RP-2025-006904
- Issued Mar 10, 2026
New construction, addition, GFA change · For the erection of a two-story attached structure. Size and location per plan.
- Issued Feb 17, 2026
Addition and/or Alteration · Demolition of first floor lobby, conference room, and cafeteria areas. Install new lighting, wiring devices, lighting controls, box and conduit for future low voltage systems and power connections as per 2017 NEC.
- Issued Feb 6, 2026
Addition and/or Alterations · EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the relocation of sprinkler heads as per attached standards. Deviations from these standards require submission of construction and site plans. RELOCATE (46) EXISTING SPRINKLER HEADS PER NFPA 13
- Issued Jan 28, 2026
Alterations · Rough in and install new floor sink and kitchen sink.
- Issued Jan 15, 2026
New construction, addition, GFA change · For site work to create a private access driveway. Size and location per plan. No structures are included or approved in this permit
- Issued Jan 9, 2026
New Construction · Electrical Permit for combo RP-2025-006904 EZELEC - NEW SERVICE ELECTRICAL WIRING/DEVICES THROUGHOUT AS PER 2017 NEC. Deviations from the EZ Permit standards require submission of construction and site plans.
- Issued Dec 24, 2025
Addition and/or Alterations · Mechanical / Fuel Gas Permit for combo CP-2025-001437
- Issued Dec 24, 2025
Alterations · Plumbing Permit (Interior) for combo CP-2025-001437
- Issued Dec 23, 2025
1 units
Addition and/or Alteration · FOR LEVEL II ALTERATIONS WITH NO CHANGE IN OCCUPANCY. SEPARATE PERMITS REQUIRED FOR MECHANICAL, ELECTRICAL, PLUMBING AND FIRE SUPPRESSION.
- Issued Dec 22, 2025
Addition and/or Alterations · FOR INSTALLATION OF HVAC EQUIPMENT, DUCTWORK AND REGISTERS/DIFFUSERS PER APPROVED PLANS AND MANUFACTURER'S SPECIFICATIONS.
- Issued Dec 11, 2025
City Demolition · Sub Demolition Permit for CF-2025-059284. For the complete demolition of a property as part of the City of Philadelphia Demolition Program. Add'l specs: No sidewalk. (1) stucco c/w 5027 Master. Erosion control mat with topsoil and seed. 4' corral fence across front and continue in rear.
- Issued Dec 11, 2025
Alterations · For minor construction work at the subject property in accordance with all applicable provisions of the Philadelphia Code, all references codes and standards, and the attached EZ Standard, where included. Deviation from this standard shall result in permit revocation. A separate permit from the Philadelphia Department of Streets is required for any sidewalk and street closures. All means of pedestrian protection required at the site in accordance with the Philadelphia Building Code Chapter 33 sh
- Issued Dec 10, 2025
1 units
Addition and/or Alteration · LEVEL II INTERIOR & EXTERIOR ALTERATIONS (NO CHANGE OF OCCUPANCY) FOR RENOVATIONS TO FIRST FLOOR LEVEL & STAIRWAYS OF AN EXISTING OFFICE BUILDING AS PER APPROVED PLANS. EXISTING BUILDING FULLY SPRINKLERED. *2018 IEBC REVIEW* **SEPARATE PERMITS REQUIRED FOR ANY MEP OR FIRE SUPPRESSION WORK**
- Issued Nov 14, 2025
General Earth Disturbance ONLY · FOR A SITE CLEARING PERDMIT.**EARTH DISTURBANCE PERMIT**
- Issued Nov 14, 2025
General Earth Disturbance ONLY · FOR SELECT SITE CLEARING AND THE INSTALLATION OF NEW LANDSCAPING/PAVEMENT ACCESSORY TO AN EXISTING BUILDING, THE INSTALLATION OF UNDERGROUND UTILITIES AND RELATED APPURTENANCES, FOR THE ERECTION OF PLAY AREAS CONTAINING PLAY COMPONENTS DESIGNED AND CONSTRUCTED FOR CHILDREN AND LOCATED ON AN ACCESSIBLE ROUTE. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS REQUIRED FOR ALL OTHER WORK.
- Issued Nov 13, 2025
1 units
New Construction · FOR UNDERPINNING AND FOR THE CONSTRUCTION OF AN ATTACHED STRUCTURE WITH CELLAR. FOR USE AS A SINGLE-FAMILY HOUSEHOLD LIVING. AS PER APPROVED PLANS. FIRE-SUPPRESSION THROUGHOUT AS PER NFPA 13D. ************SEPARATE PERMITS FOR ANY OTHER WORK. ***********************************************
- Issued Nov 10, 2025
General Earth Disturbance ONLY · SITEWORK FOR GENERAL EARTH DISTURBANCE ONLY. SEPARATE PERMITS REQUIRED FOR MEP WORK.
- Issued Nov 7, 2025
New construction, addition, GFA change · FOR THE INSTALLATION OF AN ATHLETIC FIELD AND DETACHED SHED STRUCTURE. SIZE AND LOCATION AS SHOWN IN APPLICATION/PLANS.
- Issued Oct 29, 2025
New construction, addition, GFA change · For the erection of six(6) separate building on the same lot. Sizes and locations as shown on the plan.
- Issued Oct 20, 2025
Site Clearing or Earth Disturbance ONLY · FOR SITE CLEARING AND EARTH DISTURBANCE, INCLUDING INSTALLATION OF NEW RECREATION EQUIPMENT, LANDSCAPING AND FENCING. SIZE/LOCATION AS SHOWN ON THE APPLICATION/PLANS.
- Issued Oct 10, 2025
1 units
Addition and/or Alteration · FOR A BASKETBALL COURT UPGRADE . **WORK TO BE COMPLETED PER APPROVED PLANS**
- Issued Oct 8, 2025
Combined Lot Line Relocation and New Development · FOR THE RELOCATION OF LOT LINES (SUBDIVISION) TO CREATE 3 LOTS (PARCEL A, PARCEL B, AND PARCEL C) FROM 1 EXISTING LOT (207 E PENN ST). SIZE AND LOCATION AS SHOWN IN APPLICATION/PLANS.
- Issued Oct 7, 2025
Alterations · For minor construction work at the subject property in accordance with all applicable provisions of the Philadelphia Code, all references codes and standards, and the attached EZ Standard, where included. Deviation from this standard shall result in permit revocation. A separate permit from the Philadelphia Department of Streets is required for any sidewalk and street closures. All means of pedestrian protection required at the site in accordance with the Philadelphia Building Code Chapter 33 sh
- Issued Oct 7, 2025
City Demolition · Sub Demolition Permit for CF-2024-129804. For the complete demolition of a property as part of the City of Philadelphia Demolition Program. Add'l specs: No sidewalk. (2) stucco c/w 5734, 5738 Hadfield. Corral fence across front. Erosion control mat with topsoil and seed.
- Issued Oct 6, 2025
Addition and/or Alteration · Supply and installed six LED flood lights in new locations (Fishing and Flush Mounting of wires only)
- Issued Sep 30, 2025
City Demolition · Sub Demolition Permit for 628599. For the complete demolition of a property as part of the City of Philadelphia Demolition Program. Add'l specs: Replace front sidewalk. (2) stucco c/w 6027, 6031 Delancey. Corral fence across front. erosion control mat with topsoil and seed.
- Issued Sep 30, 2025
City Demolition · Sub Demolition Permit for CF-2024-032534. For the complete demolition of a property as part of the City of Philadelphia Demolition Program. Add'l specs: No sidewalk. (1) stucco c/w 402 N. Wilton. Corral fence around entire perimeter of property. Erosion control mat with topsoil and seed.
- Issued Sep 30, 2025
Alterations · For minor construction work at the subject property in accordance with all applicable provisions of the Philadelphia Code, all references codes and standards, and the attached EZ Standard, where included. Deviation from this standard shall result in permit revocation. A separate permit from the Philadelphia Department of Streets is required for any sidewalk and street closures. All means of pedestrian protection required at the site in accordance with the Philadelphia Building Code Chapter 33 sh
- Issued Sep 30, 2025
Alterations · For minor construction work at the subject property in accordance with all applicable provisions of the Philadelphia Code, all references codes and standards, and the attached EZ Standard, where included. Deviation from this standard shall result in permit revocation. A separate permit from the Philadelphia Department of Streets is required for any sidewalk and street closures. All means of pedestrian protection required at the site in accordance with the Philadelphia Building Code Chapter 33 sh
- Issued Sep 18, 2025
Lot Line Relocation · For the relocation of lot lines to create one lot from two deeded parcels (deeded 6301 Milnor St & 5202 Levick St, with one OPA account). Size and location per plan.
- Issued Sep 12, 2025
1 units
Excavation · Site / Utility Permit for RP-2025-006904 FOR EXCAVATION WORK ASSOCIATED WITH NEW CONSTRUCTION OF A TWO (2) STORY SINGLE-FAMILY DWELLING BUILDING AS PER APPROVED PLANS. WORK TO INCLUDE TEMPORARY EXCAVATION SUPPORT SYSTEM. NO BUILDING CONSTRUCTION APPROVED ON THIS PERMIT. *2018 IRC REVIEW* **SEPARATE PERMITS REQUIRED FOR BUILDING CONSTRUCTION**
- Issued Sep 11, 2025
1 units
New Construction · FOR THE ERECTION OF A TWO (2) STORY ATTACHED STRUCTURE OF TYPE V-B CONSTRUCTION WITH BASEMENT FOR USE AS A SINGLE-FAMILY DWELLING (GROUP R-3). BUILDING TO BE FULLY SPRINKLERED PER NFPA 13D. ALL WORK TO BE DONE PER APPROVED PLANS AND IN ACCORDANCE WITH 2018 IRC. SEPARATE PERMITS REQUIRED FOR MECHANICAL, ELECTRICAL, PLUMBING, FIRE SUPPRESSION, AND EXCAVATION WORK. ENERGY CODE COMPLIANCE IN ACCORDANCE WITH 2018 IECC. PRIOR TO ISSUANCE OF C.O., SUBMITTAL OF AIR BARRIER CHECKLIST AND ENVELOPE TESTING
- Issued Sep 8, 2025
Addition and/or Alteration · Scope : demo lights, smoke detector, add 6 lights, 2 receptacles,, change candelas on two existing strobes. ALL WORK IS TO BE DONE ACCORDING TO APPROVED DRAWINGS-2017 NEC.
- Issued Aug 25, 2025
New construction, addition, GFA change · FOR THE ERECTION OF AN ATTACHED STRUCTURE, SIZE AND LOCATION AS SHOWN ON THE PLANS.
- Issued Aug 25, 2025
New construction, addition, GFA change · FOR NEW CONSTRUCTION OF AN ATTACHED BUILDING. SIZE AND LOCATION PER APPROVED PLAN.
- Issued Aug 25, 2025
New construction, addition, GFA change · FOR THE ERECTION OF A SEMI-DETACHED BUILDING. SIZE AND LOCATION AS SHOWNN ON PLANS.
- Issued Aug 25, 2025
New construction, addition, GFA change · FOR THE ERECTION OF A SEMI-DETACHED BUIDLING, SIZE AND LOCATION AS SHOWN ON THE PLANS.
- Issued Aug 25, 2025
New construction, addition, GFA change · For the erection of an attached structure. Size and location as shown on plans.
- Issued Aug 25, 2025
New construction, addition, GFA change · FOR THE ERECTION OF A SEMI-DETACHED STRUCTURE. SIZE & LOCATION AS SHOWN ON THE APPLICATION/PLANS.
- Issued Aug 25, 2025
New construction, addition, GFA change · For the erection of an attached structure. Size and location as shown on plans.
- Issued Aug 25, 2025
New construction, addition, GFA change · FOR THE ERECTION OF AN ATTACHED STRUCTURE. SIZE AND LOCATION AS SHOWN IN PLAN.
- Issued Aug 25, 2025
New construction, addition, GFA change · FOR NEW CONSTRUCTION OF AN ATTACHED BUILDING WITH CELLAR. SIZE AND LOCATION PER APPROVED PLAN.
- Issued Aug 25, 2025
New construction, addition, GFA change · FOR NEW CONSTRUCTION OF AN ATTACHED BUILDING. SIZE AND LOCATION PER APPROVED PLAN.
- Issued Aug 20, 2025
Addition and/or Alterations · FORA MECHANICAL SYSTEM UPGRADE. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS REQUIRED FOR ALL OTHER WORK.
- Issued Aug 18, 2025
Site Clearing or Earth Disturbance ONLY · FOR SITE CLEARING AND EARTH DISTURBANCE ONLY. SIZE AND LOCATION AS SHOWN IN THE APPLICATION / PLANS.
- Issued Aug 8, 2025
1 units
New Construction · FOR NEW CONSTRUCTION OF AN ATTACHED BUILDING WITH CELLAR. BUILDING TO BE FULLY SPRINKLERED WITH NFPA 13D. SEPARATE PERMITS REQUIRED FOR MECHANICAL, ELECTRICAL, PLUMBING, FIRE SUPPRESSION AND EXCAVATIONS.
- Issued Aug 6, 2025
Addition and/or Alterations · EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the relocation of sprinkler heads as per attached standards. Deviations from these standards require submission of construction and site plans. RELOCATE (11) SPRINKLER HEADS PER NFPA 13
- Issued Aug 2, 2025
1 units
Addition and/or Alteration · LEVEL II INTERIOR ALTERATIONS (NO CHANGE OF OCCUPANCY) FOR RENOVATIONS TO CONFERENCE ROOM ON THE FIRST FLOOR OF AN EXISTING OFFICE BUILDING AS PER APPROVED PLANS. EXISTING BUILDING FULLY SPRINKLERED. *2018 IEBC REVIEW* **SEPARATE PERMITS REQUIRED FOR ANY MEP OR FIRE SUPPRESSION WORK**
- Issued Jul 28, 2025
New construction, addition, GFA change · Affordable housing new construction of a two (2) story single-family household living structure as per approved plan
- Issued Jul 21, 2025
New construction, addition, GFA change · FOR THE ERECTION OF AN ATTACHED BUILDING TO INCLUDE A REAR WALKOUT DECK AT THE SECOND FLOOR LEVEL. SIZE AND LOCATION AS SHOWN IN PLANS
Violations
72 entries
- Unsafe May 15, 2026ACTIVE
Unsafe structure designation
- Unsafe Aug 6, 2025ACTIVE
Unsafe structure designation
- Unsafe Jun 11, 2025ACTIVE
Unsafe structure designation
- Unsafe Apr 28, 2023ACTIVE
Unsafe structure designation
- Violation Jul 8, 2026OPEN
VACANT STRUCTURE & LAND
- Violation Jul 7, 2026OPEN
VACANT STRUCTURE & LAND
- Violation Jul 7, 2026OPEN
VACANT STRUCTURE & LAND
- Violation Jul 7, 2026OPEN
EXTERIOR AREA WEEDS
- Violation Jul 7, 2026OPEN
RUBBISH & GARBAGE
- Violation Jun 16, 2026OPEN
VACANT STRUCTURE & LAND
- Violation Jun 6, 2026OPEN
EXTERIOR AREA WEEDS
- Violation Jun 6, 2026OPEN
RUBBISH & GARBAGE
- Violation Jun 4, 2026OPEN
EXTERIOR AREA WEEDS
- Violation Jun 4, 2026OPEN
RUBBISH & GARBAGE
- Violation Jun 1, 2026OPEN
RECORD KEEPING
- Violation Jun 1, 2026OPEN
COMBUSTIBLE DECORATIVE MATERIALS
- Violation Jun 1, 2026OPEN
OCCUPANT LOAD SIGN
- Violation Jun 1, 2026OPEN
EXTENSION CORDS
- Violation Jun 1, 2026OPEN
LOCKDOWN PLAN CONTENTS
- Violation Jun 1, 2026OPEN
GROUP E OCCUPANCIES
- Violation Jun 1, 2026OPEN
INSPECTION, TESTING AND MAINTENANCE
- Violation Jun 1, 2026OPEN
PERIODIC TESTING
- Violation May 15, 2026OPEN
UNSAFE STRUCTURE
- Violation May 15, 2026OPEN
EXTERIOR WALLS
- Violation May 15, 2026OPEN
ROOF DEFICIENCIES
- Violation May 15, 2026OPEN
DECKS, BALCONIES, & EXTERIOR STAIRS
- Violation May 5, 2026OPEN
GENERAL EXTERIOR VIOLATIONS
- Violation May 5, 2026OPEN
ROOF DEFICIENCIES
- Violation May 5, 2026OPEN
EXTERIOR AREA WEEDS
- Violation May 5, 2026OPEN
EXTERIOR AREA WEEDS
- Violation May 5, 2026OPEN
EXTERIOR AREA WEEDS
- Violation May 5, 2026OPEN
ROOF DEFICIENCIES
- Violation Apr 27, 2026OPEN
VACANT STRUCTURE & LAND
- Violation Apr 27, 2026OPEN
VACANT & OPEN PROPERTIES
- Violation Apr 13, 2026OPEN
VACANT STRUCTURE & LAND
- Violation Apr 13, 2026OPEN
EXTERIOR AREA SANITATION
- Violation Apr 4, 2026OPEN
NEW USE
- Violation Mar 12, 2026OPEN
ENCROACHING TREES
- Violation Mar 6, 2026OPEN
ENCROACHING TREES
- Violation Feb 3, 2026OPEN
SUPPRESSION SYSTEM TESTING & MAINTENANCE
- Violation Jan 16, 2026OPEN
ENCROACHING TREES
- Violation Dec 1, 2025OPEN
EXTERIOR AREA SANITATION
- Violation Dec 1, 2025OPEN
VACANT STRUCTURE & LAND
- Violation Oct 28, 2025OPEN
ENCROACHING TREES
- Violation Oct 27, 2025OPEN
PIERS & WATERFRONT STRUCTURES INSPECTION REQUIRED
- Violation Oct 15, 2025OPEN
EXTERIOR AREA WEEDS
- Violation Oct 15, 2025OPEN
RUBBISH & GARBAGE
- Violation Oct 9, 2025OPEN
PIERS & WATERFRONT STRUCTURES INSPECTION REQUIRED
- Violation Sep 17, 2025OPEN
SUPPRESSION SYSTEM TESTING & MAINTENANCE
- Violation Sep 12, 2025OPEN
EXTERIOR STRUCTURE PROTECTIVE TREATMENT
- Violation Sep 12, 2025OPEN
EXTERIOR STRUCTURE IDENTIFICATION
- Violation Sep 12, 2025OPEN
EXTERIOR STRUCTURE HANDRAILS GUARDRAILS
- Violation Aug 18, 2025OPEN
EXTERIOR STRUCTURE ROOF DRAINAGE
- Violation Aug 18, 2025OPEN
EXTERIOR STRUCTURE STAIRS, DECKS, PORCHES
- Violation Aug 18, 2025OPEN
VACANT STRUCTURE & LAND
- Violation Aug 13, 2025OPEN
VACANT STRUCTURE & LAND
- Violation Aug 13, 2025OPEN
DOOR AND WINDOW VACANT
- Violation Aug 12, 2025OPEN
SUPPRESSION SYSTEM TESTING & MAINTENANCE
- Violation Aug 6, 2025OPEN
ROOF DEFICIENCIES
- Violation Aug 6, 2025OPEN
WOOD COMPONENTS
- Violation Aug 6, 2025OPEN
UNSAFE STRUCTURE
- Violation Jun 11, 2025OPEN
UNSAFE STRUCTURE
- Violation Jun 11, 2025OPEN
EXTERIOR WALLS
- Violation Jun 11, 2025OPEN
ARCHITECT/ENGINEER SERVICES
- Violation Jun 11, 2025OPEN
GENERAL EXTERIOR VIOLATIONS
- Violation Aug 26, 2024OPEN
SUPPRESSION SYSTEM TESTING & MAINTENANCE
- Violation Aug 26, 2024OPEN
INSPECTION, TESTING & MAINTENANCE
- Violation Aug 26, 2024OPEN
SUPPRESSION SYSTEM TESTING & MAINTENANCE
- Violation Aug 26, 2024OPEN
INSPECTION, TESTING & MAINTENANCE
- Violation Aug 26, 2024OPEN
SUPPRESSION SYSTEM TESTING & MAINTENANCE
- Violation Aug 26, 2024OPEN
INSPECTION, TESTING & MAINTENANCE
- Violation Aug 12, 2024OPEN
NEW USE
Track this owner
We'll flag their next deal, permit, or filing — usually before the neighbors know.
Entities are grouped by a normalized name from the public record; a separate legal entity per building is common, so some portfolios span several related names. Sources: Phila. Dept. of Records (deeds), L&I (permits & violations), Dept. of Revenue (tax delinquencies), reflecting the record as of our last weekly ingest. Verify independently before relying on it.