Entity File · The Public Record
Company / LLC
City Suburban Home Builders, LLC
7 permits
- Records on file
- 7
Built (as contractor)
7 entries
- Issued Jul 9, 2026
20 units
New Construction · NEW CONSTRUCTION OF A FOUR (4) STORY BUILDING WITH CELLAR, COMMON ROOF DECK AND GREEN ROOF WITH PILOT HOUSES FOR USE AS TWENTY (20) DWELLING UNITS (MIHB UTILIZED) AS PER APPROVED PLANS. BUILDING TO BE SPRINKLERED PER NFPA 13 AND INCLUDE STANDPIPES PER NFPA 14. WORK TO INCLUDE UNDERPINNING TO BE MONITORED BY A PA LICENSED PE AT ALL TIMES. *2018 IBC REVIEW* **SEPARATE PERMITS REQUIRED FOR MEP & FIRE SUPPRESSION WORK**
- Issued Jul 9, 2026
1 units
New Construction · FOR THE ERECTION OF AN ATTACHED 3-STORY STRUCTURE WITH ROOF ACCESS STRUCTURE FOR ACCESS TO AN OCCUPIABLE ROOF DECK. STRUCTURE FOR USE AS SINGLE-FAMILY HOUSEHOLD LIVING. THE BUILDING IS FULLY SPRINKLERED IN ACCORDANCE WITH NFPA 13D. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMIITS TO BE OBTAINED FOR ALL OTHER WORK. **UNDERPINNING TO BE MONITORED BY A PA LICENSED PE AT ALL TIMES**
- Issued Jul 2, 2026
2 units
New Construction · ERECTION OF AN ATTACHED STRUCTURE FOR USE AS TWO-FAMILY HOUSEHOLD LIVING. SHEETING AND SHORING AS PRESCRIBED IN GEO TECH REPORT. SEPARATE PERMITS REQUIRED FOR ELECTRICAL, MECHANICAL, PLUMBING AND SPRINKLER (13R) WORK. UNDERPINNING TO BE COMPLETE UNDER SP-2026-000005. ENERGY CODE COMPLIANCE IN ACCORDANCE WITH 2018 IECC. PRIOR TO ISSUANCE OF C.O SUBMITTAL OF AIR BARRIER CHECKLIST AND ENVELOPE TESTING CERTIFICATE IS REQUIRED. BOTH TO BE COMPLETED BY AN APPROVED PARTY. CONTRACTOR TO DEMOLISH NEIGHB
- Issued Jul 1, 2026
Addition and/or Alterations · EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES- For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans.
- Issued Dec 22, 2025
32 units
New Construction · FOR NEW CONSTRUCTION OF AN DETACHED BUILDING WITH CELLAR, BALCONIES, ROOF DECK AND ROOF-DECK ACCESS STRUCTURE. BUILDING TO BE FULLY SPRINKLERED WITH NFPA 13. SEPARATE BUILDING PERMITS REQUIRED FOR EXCAVATION, MECHANICAL, ELECTRICAL, PLUMBING AND FIRE SUPPRESSION.
- Issued Sep 8, 2025
1 units
New Construction · NEW CONSTRUCTION OF A FOUR (4) STORY BUILDING WITH CELLAR, COMMON ROOF DECK AND PILOT HOUSES FOR USE AS SEVENTEEN (17) DWELLING UNITS (UTILIZING MIXED INCOME HOUSING BONUS) AS PER APPROVED PLANS. BUILDING TO BE FULLY SPRINKLERED PER NFPA 13 AND INCLUDE STANDPIPES PER NFPA 14. *2018 IBC REVIEW* **SEPARATE PERMITS REQUIRED FOR MEP & FIRE SUPPRESSION WORK**
- Issued Aug 4, 2025
1 units
New Construction · FOR NEW CONSTRUCTION OF AN ATTACHED BUILDING WITH CELLAR, ROOF DECK AND ROOF-DECK ACCESS STRUCTURE. BUILDING TO BE FULLY SPRINKLERED WITH NFPA 13D. SEPARATE PERMITS REQUIRED FOR EXCAVATION, MECHANICAL, ELECTRICAL, PLUMBING AND FIRE SUPPRESSION.
Track this owner
We'll flag their next deal, permit, or filing — usually before the neighbors know.
Entities are grouped by a normalized name from the public record; a separate legal entity per building is common, so some portfolios span several related names. Sources: Phila. Dept. of Records (deeds), L&I (permits & violations), Dept. of Revenue (tax delinquencies), reflecting the record as of our last weekly ingest. Verify independently before relying on it.
Last generated August 1, 2026.