Clemens Construction CO INC..
14 permits
- Records on file
- 14
Built (as contractor)
14 entries
- Issued Jul 9, 2026
1 units
Addition and/or Alteration · FOR LEVEL II ALTERATIONS TO INCLUDE STRUCTURAL WORK, FACADE WORK, INFILLS, PARTIAL DEMO, NEW PARTITIONS, FINISHES AS PER APPROVED PLANS. SEPARATE PERMITS REQUIRED FOR MEP AND FIRE SUPPRESSION WORK.
- Issued Jun 29, 2026
1 units
Addition and/or Alteration · LEVEL II EXTERIOR ALTERATIONS (NO CHANGE OF OCCUPANCY) FOR REMOVAL OF PORTION OF EXTERIOR WALL AND CREATION OF EXTERIOR TERRACE FOR EXISTING 43RD FLOOR RESIDENTIAL SPACE AS PER APPROVED PLANS. EXISTING BUILDING FULLY SPRINKLERED. *2018 IEBC REVIEW*
- Issued Jun 8, 2026
1 units
Addition and/or Alteration · FOR LEVEL I ALTERATIONS TO AN EXISTING ASSEMBLY (A-1, THEATER) SPACE. ALTERATIONS TO INCLUDE LIGHTING UPGRADES, PROVIDE FINISHES/FURNISHINGS AND RELATED IMPROVEMENTS THROUGHOUT. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK.
- Issued May 26, 2026
1 units
Addition and/or Alteration · FOR LEVEL II ALTERATIONS TO 2ND FLOOR LOBBY IN AN EXISTING STRUCTURE TO INCLUDE PARTIAL DEMOLITION AND ERECTION OF PARTITION WALLS, PROVIDE FINISHES/FURNISHINGS AND ACCESSIBILITY IMPROVEMENTS THROUGHOUT. FOR USE AS PREVIOUSLY APPROVED. ALL WORK TO BE DONE PER APPROVED PLANS. ***************** SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK. ******************************************
- Issued May 20, 2026
1 units
Addition and/or Alteration · LEVEL ALTERATIONS TO AN EXISTING EDUCATIONAL FACILITY TO INCLUDE FIT-OUT OF FIFTH FLOOR SPACE AS PER APPROVED PLANS. EXISTING BUILDING FULLY SPRINKLERED. *2018 IEBC REVIEW* **SEPARATE PERMITS REQUIRED FOR ANY MEP OR FIRE SUPPRESSION WORK**
- Issued May 18, 2026
1 units
Addition and/or Alteration · FOR A LEVEL II INTERIOR ALTERATIONS TO AN EXISTING TENANT SPACE ON THE 26TH FLOOR LEVEL FOR USE AS A BUSINESS OCCUPANCY. ALTERATIONS TO INCLUDE THE ERECTION OF PARTITION WALLS, PROVIDE FINISHES/FURNISHINGS THROUGHOUT. BUILDING IS FULLY SPRINKLERED. ALL WORK TO BE DONE PER APPROVED PLANS.** IF FIELD CONDITIONS VARY CONTACT DESIGN PROFESSIONAL PRIOR TO THE START OF ANY WORK.** SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK.**
- Issued Apr 7, 2026
1 units
Addition and/or Alteration · PARTIAL ALTERATION TO THE 5TH FLOOR OF AN EXISTIGN STRUCTURE. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK. **SEPARATE PERMITS REQUIRED FOR ELECTRICAL, MECHANICAL, PLUMBING & FIRE SUPPRESSION WORK**
- Issued Feb 25, 2026
1 units
Addition and/or Alteration · FOR LEVEL II ALTERATIONS TO RELOCATE JEFFERSON POLICE STATION TO INCLUDE NEW PARTITIONS, FIXTURES, FURNISHINGS, FINISHES AS PER APPROVED PLANS. SEPARATE PERMITS REQUIRED FOR MEP AND FIRE SUPPRESSION WORK. *2018 IEBC*
- Issued Feb 25, 2026
1 units
Addition and/or Alteration · FOR LEVEL II ALTERATIONS TO INCLUDE NEW PARTITIONS, FIXTURES, FURNISHINGS, FINISHES AS PER APPROVED PLANS. SEPARATE PERMITS REQUIRED FOR ANY MEP AND FIRE SUPPRESSION WORK.
- Issued Feb 16, 2026
1 units
Addition and/or Alteration · FOR CONCRETE REPAIRS AS PER APPROVED PLANS. SEPARATE PERMITS REQUIRED FOR MEP WORK.
- Issued Feb 9, 2026
1 units
Addition and/or Alteration · FOR THE ERECTION OF AN ACCESSIBLE PEDESTRIAN BRIDGE STRUCTURE OVER A PRIVATE DRAINAGE SWALE, AND ON EXISTING ABUTMENTS. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMIITS TO BE OBTAINED FOR ALL OTHER WORK.
- Issued Jan 5, 2026
1 units
Addition and/or Alteration · FOR LEVEL II ALTERATIONS TO AN EXISTING STRUCTURE. ALTERATIONS TO INCLUDE THE ERECTION OF PARTITION WALLS, PROVIDE FINISHES/FURNISHINGS, ACCESSIBILITY IMPROVMENTS, AND STRUCTURAL REPAIRS. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK. ASBESTOS ABATEMENT REQUIRED PRIOR TO THE START OF WORK
- Issued Dec 19, 2025
1 units
1700-20 Benjamin Franklin Pkwy
Addition and/or Alteration · FOR LEVEL II INTERIOR ALTERATIONS TO INCLUDE RESTROOM RENOVATIONS ON THE 2ND FLOOR, NEW FINISHES, MAINTENANCE AND REPAIRS IN LOBBY AREAS ON 1ST AND 2ND FLOORS IN AN EXISTING BUILDING. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK.
- Issued Dec 17, 2025
1 units
Addition and/or Alteration · FOR INTERIOR DEMOLITION AND RESTROOM ALTERATIONS (WITH NO CHANAGE OF OCCUPANCY) PER APPROVED PLANS. SEPARATE PERMITS REQUIRED FOR MECHANICAL, ELECTRICAL, PLUMBING AND FIRE SUPPRESSION WORK.
Track this owner
We'll flag their next deal, permit, or filing — usually before the neighbors know.
Entities are grouped by a normalized name from the public record; a separate legal entity per building is common, so some portfolios span several related names. Sources: Phila. Dept. of Records (deeds), L&I (permits & violations), Dept. of Revenue (tax delinquencies), reflecting the record as of our last weekly ingest. Verify independently before relying on it.
Last generated August 1, 2026.