- Issued Jul 1, 2026
Addition and/or Alterations · FOR THE INSTALLATION OF REGISTERS, DIFFUSERS, AND APPLIANCES WITH ASSOCIATED DUCTWORK. APPLIANCES TO BE INSTALLED IN ACCORDANCE WITH MANUFACTURER'S SPECIFICATIONS. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS REQUIRED FOR ALL OTHER WORK.
- Issued Jun 29, 2026
Alterations · Furnish and install (10) plumbing fixtures, (2) kitchen sinks, (1) electric hot water heater, (5) lavatories, (1) water closet and (1) floor drain, with piping.
- Issued Jun 29, 2026
Addition and/or Alteration · Perform an electrical fit-out for a commercial office space on the 30th floor, including a complete rewiring of the space. Provide complete electrical distribution, including the installation of lighting fixtures, switches, lighting controls, exit signs, emergency lighting, telecommunications wiring, and receptacle outlets. Install dedicated branch circuits and electrical connections to supply power for heat pumps, water heater, fan-powered variable (FPV) units, and poke-through devices,
- Issued Jun 17, 2026
Addition and/or Alterations · EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the relocation of sprinkler heads as per attached standards. Deviations from these standards require submission of construction and site plans. RELOCATE (20) SPRINKLER HEADS, PER NFPA 13
- Issued Jun 17, 2026
Addition and/or Alteration · Furnish and install two (2) Category 6 plenum cables to fourteen (14) wall locations. Average cable pull is 180 feet.
- Issued Jun 16, 2026
Addition and/or Alterations · EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES - For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. Relocate 6 existing diffusers within a single tenant space, no wall penetrations.
- Issued Jun 16, 2026
Addition and/or Alterations · ALTERATIONS TO EXISTING HVAC SYSTEM TO ACCOMODATE NEW OFFICE LAYOUT ON THE 30TH FLOOR OF AN EXISTING HIGH-RISE BUILDING AS PER APPROVED PLANS. *2018 IMC REVIEW*
- Issued Jun 15, 2026
Addition and/or Alterations · EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the relocation of sprinkler heads as per attached standards. Deviations from these standards require submission of construction and site plans. RELOCATE (8) SPRINKLER HEADS ON THE 15TH FLOOR, PER NFPA 13
- Issued Jun 12, 2026
1 units
Addition and/or Alteration · LEVEL II INTERIOR ALTERATIONS (NO CHANGE OF OCCUPANCY) FOR RENOVATIONS TO EXISTING 10TH FLOOR OFFICE SPACE IN AN EXISTING HIGH-RISE OFFICE BUILDING AS PER APPROVED PLANS. EXISTING BUILDING FULLY SPRINKLERED. *2021 IEBC REVIEW* **SEPARATE PERMITS REQUIRED FOR ANY MEP OR FIRE SUPPRESSION WORK**
- Issued Jun 10, 2026
Addition and/or Alterations · EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the relocation of sprinkler heads as per attached standards. Deviations from these standards require submission of construction and site plans. RELOCATE (91) SPRINKLER HEADS ON THE 30TH FLOOR, PER NFPA 13
- Issued Jun 1, 2026
1 units
Addition and/or Alteration · FOR LEVEL II ALTERATION TO TENANT SPACE ON 30TH FLOOR OF AN EXISTING STRUCTURE TO INCLUDE DEMOLITION AND THE ERECTION OF PARTITION WALLS, PROVIDE FINISHES/FURNISHINGS AND ACCESSIBILITY IMPROVEMENTS THROUGHOUT. FOR USE AS PREVIOUSLY APPROVED. ALL WORK TO BE DONE PER APPROVED PLANS. ***************** SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK. ****************************************.
- Issued May 21, 2026
Addition and/or Alterations · EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the relocation of sprinkler heads as per attached standards. Deviations from these standards require submission of construction and site plans. RELOCATE (2) HEADS, PER NFPA 13
- Issued May 11, 2026
1 units
Addition and/or Alteration · FOR LEVEL II ALTERATION TO TENANT SPACE ON 15TH FLOOR OF AN EXISTING STRUCTURE TO INCLUDE DEMOLITION AND THE ERECTION OF PARTITION WALLS, PROVIDE FINISHES/FURNISHINGS AND ACCESSIBILITY IMPROVEMENTS THROUGHOUT. FOR USE AS PREVIOUSLY APPROVED. ALL WORK TO BE DONE PER APPROVED PLANS. ***************** SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK. ****************************************.
- Issued Apr 23, 2026
Addition and/or Alteration · Furnish and install 10 duplex receptacle and 1 exit sign utilizing existing circuitry, relocate 3 linears in hallway, 1 switch and ceiling motion. Existing fire alarm to remain. ALL WORK IS TO BE DONE ACCORDING TO APPROVED DRAWINGS-2017 NEC.
- Issued Apr 21, 2026
1 units
Addition and/or Alteration · FOR LEVEL II ALTERATION TO INCLUDE DEMOLITION AND THE SLAB INFILL OF EXISTING STAIR ON 30TH FLOOR SUITE 3000 TO AN EXISTING STRUCTURE. FOR USE AS PREVIOUSLY APPROVED. AS PER APPROVED PLANS. ***********************************SEPARATE PERMITS FOR ANY OTHER WORK. ***********************************************
- Issued Apr 6, 2026
Addition and/or Alterations · EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the Relocation of Sprinkler Heads as per attached standards. Deviations from these standards require submission of construction and site plans. *CP-2026-001564* RELOCATE (13) SPRINKLER HEADS ON THE 15TH FL, SUITE 1510 AS PER NFPA 13
- Issued Mar 31, 2026
Addition and/or Alteration · STATEMENT OF WORK: HORIZONTAL CABLING: • Based on cable take-off list provided by Preferred Comm Tech, Bluestone has included the installation of one hundred eighty-five (185) Category 6 network cables and twelve (12) Category 6A cables for wireless access points. Counts include additional cables for 7th Floor. • Provide labor to install twelve (12) customer-provided wireless access points. • Provide labor to install thirty-five (35) customer-provided room schedulers and patch cords. • Provide l
- Issued Mar 31, 2026
Alterations · Install (2) new plumbing fixtures, (1) kitchen sink and (1) hot water heater, connecting to existing piping. ALL WORK PERFORMED IN STRICT COMPLIANCE WITH 2018 PPC AND PLUMBING EZ STANDARD.
- Issued Mar 31, 2026
Addition and/or Alterations · EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES- For Mechanical Work to include the installation as per attached standards. Deviations from these standards require submission of construction and site plans. NO PENETRATIONS OF RATED ASSEMBLIES. *CP-2026-001564* Furnish labor to relocate 6 existing diffusers with no wall penetrations within a single tenant space area, in compliance with attached signed EZ Permit Standards, Ductwork and Warm-Air Appliances Form
- Issued Mar 30, 2026
EZ Interior Non-Load-Bearing Wall Demo. · For minor construction work at the subject property in accordance with all applicable provisions of the Philadelphia Code, all references codes and standards, and the attached EZ Standard, where included. Deviation from this standard shall result in permit revocation. A separate permit from the Philadelphia Department of Streets is required for any sidewalk and street closures. All means of pedestrian protection required at the site in accordance with the Philadelphia Building Code Chapter 33 sh
- Issued Mar 30, 2026
1 units
Addition and/or Alteration · FOR LEVEL II INTERIR ALTERATIONS TO A PORTION OF AN EXISTING STRUCTURE. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN PROFESSIONAL PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK.
- Issued Mar 10, 2026
EZ Interior Non-Load-Bearing Wall Demo. · For minor construction work at the subject property in accordance with all applicable provisions of the Philadelphia Code, all references codes and standards, and the attached EZ Standard, where included. Deviation from this standard shall result in permit revocation. A separate permit from the Philadelphia Department of Streets is required for any sidewalk and street closures. All means of pedestrian protection required at the site in accordance with the Philadelphia Building Code Chapter 33 sh
- Issued Mar 6, 2026
Addition and/or Alteration · Install 369 light fixture, 15 exit, 128 switch, 1 lighting control panel, 172 receptacle, 17 floor receptacle, 41 furniture power, 42 equipment power. Fire Alarm: Install 60 speaker/strobe, 14 strobe, 3 smoke detector, 1 relay .ALL WORK IS TO BE DONE ACCORDING TO APPROVED DRAWINGS-2017 NEC,2016 NFPA-72.
- Issued Feb 24, 2026
Addition and/or Alterations · FOR THE INSTALLATION OF REGISTERS, DIFFUSERS, AND APPLIANCES WITH ASSOCIATED DUCTWORK AT THE EIGHTH FLOOR LEVEL. APPLIANCES TO BE INSTALLED IN ACCORDANCE WITH MANUFACTURER'S SPECIFICATIONS. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS REQUIRED FOR ALL OTHER WORK.
- Issued Feb 18, 2026
Alterations · ALTERATIONS TO EXISTING OFFICE. INTERIOR INSTALLATION OF DRAINAGE, WASTE, VENT, AND WATER SUPPLY FOR LISTED FIXTURES. ALL MATERIALS SHALL BE METALLIC. VENTING TO BE DESIGNED AND INSTALLED IN ACCORDANCE WITH SECTION 919 PHILADELPHIA SINGLE STACK VENT SYSTEM. ALL WORK TO BE INSTALLED IN STRICT COMPLIANCE WITH 2018 PPC AND APPROVED PLANS
- Issued Jan 27, 2026
Addition and/or Alterations · EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the relocation of sprinkler heads as per attached standards. Deviations from these standards require submission of construction and site plans. RELOCATE (177) SPRINKLER HEADS ON THE 8TH FLOOR, PER NFPA 13
- Issued Jan 14, 2026
1 units
Addition and/or Alteration · FOR LEVEL II INTERIOR ALTERATIONS TO AN EXISTING BUSINESS OCCUPANCY ON PARTIAL 8TH FLOOR OF AN EXISTING HIGH RISE BUILDING. ALTERATIONS TO INCLUDE THE ERECTION OF PARTITION WALLS, PROVIDE FINISHES/ FURNISHINGS AND ACCESSIBILITY IMPROVMENTS THROUGHOUT. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK.
- Issued Oct 28, 2025
Addition and/or Alterations · FOR ALTERATION TO THE EXISTING HVAC SYSTEM TO ACCOMMODATE NEW OFFICE LAYOUT AS PER APPROVED PLANS.
- Issued Oct 28, 2025
Addition and/or Alteration · Install 188 light fixture, 6 exit, 25 switch, 15 receptacle, 18 furniture power, relocate 3 light fixtures. Fire Alarm: Install 11 speaker/strobe, 4 strobe. ALL WORK IS TO BE DONE ACCORDING TO APPROVED DRAWINGS-2017 NEC,2016 NFPA-72.
- Issued Oct 20, 2025
Addition and/or Alteration · INSTALL TEMPORARY WIRING TO TENANT SPACE. ALL WORK TO BE DONE ACCORDING TO THE 2017 NECD.
- Issued Oct 2, 2025
Addition and/or Alteration · Install 79 low voltage communications point locations per NEC 2017.
- Issued Sep 17, 2025
Addition and/or Alterations · EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the relocation of sprinkler heads as per attached standards. Deviations from these standards require submission of construction and site plans. RELOCATE (32) SPRINKLER HEADS ON THE 6TH FLOOR, PER NFPA 13
- Issued Sep 16, 2025
Addition and/or Alterations · EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the relocation of sprinkler heads as per attached standards. Deviations from these standards require submission of construction and site plans. RELOCATE 118 EXISTING SPRINKLER HEADS
- Issued Sep 15, 2025
1 units
Addition and/or Alteration · FOR A LEVEL II INTERIOR ALTERATIONS TO AN EXISTING TENANT SPACE ON THE 6TH FLOOR LEVEL FOR USE AS A BUSINESS OCCUPANCY. BUILDING IS FULLY SPRINKLERED. ALL WORK TO BE DONE PER APPROVED PLANS.** IF FIELD CONDITIONS VARY CONTACT DESIGN PROFESSIONAL PRIOR TO THE START OF ANY WORK.** SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK.**
- Issued Aug 30, 2025
Addition and/or Alteration · Provide new fire alarm devices and wiring in office space and tie-in to existing system as per 2016 NFPA 72.
- Issued Aug 21, 2025
Addition and/or Alterations · FOR THE INSTALLATION OF REGISTERS / DIFFUSERS CONNECTED TO DUCT WORK TO BE INSTALLED IN ACCORDANCE WITH THE MANUFACTURER’S SPECIFICATIONS. FOR USE AS PREVIOUSLY APPROVED. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK.
- Issued Aug 5, 2025
Addition and/or Alteration · Furnish & Install Power Using Existing Circuitry As Per 2017 NEC. No FA or Lighting is included.
- Issued Jul 28, 2025
Addition and/or Alteration · Provide safe-off and disconnections. Provide temporary light and power utilizing existing power source. Provide new lights, switches, receptacles, and power to HVAC equipment utilizing existing panel. Provide empty boxes and conduit stub-ups for telecom and security. Installation shall comply with 2017 NEC.
- Issued Jul 23, 2025
Alterations · Furnish and install (4) new plumbing fixtures, (2) pantry sinks and (2) hot water heaters, with piping.
Track this owner
We'll flag their next deal, permit, or filing — usually before the neighbors know.
Entities are grouped by a normalized name from the public record; a separate legal entity per building is common, so some portfolios span several related names. Sources: Phila. Dept. of Records (deeds), L&I (permits & violations), Dept. of Revenue (tax delinquencies), reflecting the record as of our last weekly ingest. Verify independently before relying on it.
Last generated July 15, 2026.