Built (as contractor)
7 entries
- Issued Jun 8, 2026
1 units
Addition and/or Alteration · LEVEL II INTERIOR ALTERATIONS (NO CHANGE OF OCCUPANCY) FOR RENOVATIONS TO EXISTING OFFICE SPACE ON THE 18TH FLOOR OF AN EXISTING HIGH-RISE BUILDING AS PER APPROVED PLANS AND PHC APPROVAL. EXISTING BUILDING FULLY SPRINKLERED. *2018 IEBC REVIEW* **SEPARATE PERMITS REQUIRED FOR ANY MEP OR FIRE SUPPRESSION WORK**
- Issued May 12, 2026
1 units
Addition and/or Alteration · FOR LEVEL II INTERIOR ALTERATIONS WITH A CHANGE IN USE WITHOUT A CHANGE IN OCCUPANCY CLASSIFICATION TO GROUP MEDICAL/COUNSELING OFFICE (GROUP B) ON THE 13TH FLOOR OF THE EXISTING HIGH-RISE STRUCTURE. BUILDING IS FULLY SPRINKLERED. ALL WORK TO BE DONE PER APPROVED PLANS AND IN ACCORDANCE WITH 2021 IEBC AND PHC APPROVAL. SEPARATE PERMITS REQUIRED FOR MECHANICAL, ELECTRICAL, PLUMBING, AND FIRE SUPPRESSION WORK. SEE ZP-2026-004289 FOR ASSOCIATED ZONING APPROVAL FOR CHANGE IN USE.
- Issued May 4, 2026
Change of Use · Medical, Dental, and Health Practitioner - Group Medical, Dental, and Health Practitioner
- Issued Mar 18, 2026
1 units
Addition and/or Alteration · FOR LEVEL II ALTERATIONS TO INCLUDE STRUCTURAL WORK, NEW PARTITIONS, FIXTURES, FURNISHINGS, FINISHES AS PER APPROVED PLANS. SEPARATE PERMITS REQUIRED FOR MEP AND FIRE SUPPRESSION WORK. 2018 IEBC
- Issued Feb 6, 2026
1 units
Addition and/or Alteration · FOR A LEVEL I INTERIOR ALTERATIONS TO A PORTION OF THE 16TH FLOOR LEVEL OF AN EXISTING STRUCTURE. ALL WORK TO BE DONE PER APPROVED PLANS. **IF FIELD CONDITIONS VARY CONTACT DESIGN PROFESSIONAL PRIOR TO THE START OF ANY WORK.** SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK.**
- Issued Jan 27, 2026
1 units
Addition and/or Alteration · LEVEL II INTERIOR ALTERATIONS (NO CHANGE OF OCCUPANCY) FOR RENOVATIONS TO EXISTING 16TH FLOOR OFFICE SPACE WITHIN A HIGH-RISE BUILDING AS PER APPROVED PLANS. EXISTING BUILDING FULLY SPRINKLERED. *2018 IEBC REVIEW* **SEPARATE PERMITS REQUIRED FOR ANY MEP OR FIRE SUPPRESSION WORK**
- Issued Sep 9, 2025
1 units
Addition and/or Alteration · FOR A LEVEL II INTERIOR ALTERATIONS (NO CHANGE IN OCCUPANCY ) TO A PORTION OF AN EXISTING STRUCTURE. ALL WORK TO BE DONE PER APPROVED PLANS.** IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK**IEBC 2018**EXISTING BUILDING FULLY SPRINKLERED** SEPARATE PERMITS REQUIRED FOR ALL OTHER WORK** ASBESTOS REMWDIATION REQUIRED PRIOR TO START OF WORK**
Track this owner
We'll flag their next deal, permit, or filing — usually before the neighbors know.
Entities are grouped by a normalized name from the public record; a separate legal entity per building is common, so some portfolios span several related names. Sources: Phila. Dept. of Records (deeds), L&I (permits & violations), Dept. of Revenue (tax delinquencies), reflecting the record as of our last weekly ingest. Verify independently before relying on it.
Last generated August 1, 2026.