THE INDEX: 64 17 · week of Jun 29permits soft, openings quiet, deal ledger quiet

The Philadelphia Index

Entity File · The Public Record

Owner of record

Contributors To Penna, Hospital

10 permits

Records on file
10

Permits (as owner)

10 entries

  1. Issued Jul 8, 2026

    801-21 Spruce St

    Addition and/or Alteration · Install telecommunication wiring for 95 dual locations consisting of 2 Cat6A plenum cables at 150' average.. All work to be perform according to the 2017 and per approved plans.

  2. Issued Jun 29, 2026

    721-39 Pine St

    Addition and/or Alteration · Install new panel and feeder Install level two EV charger and circuits qty. 6 ALL WORK IS TO BE DONE ACCORDING TO APPROVED DRAWINGS -2017 NEC.

  3. Issued May 27, 2026

    801-21 Spruce St

    Addition and/or Alterations · FOR MODIFICATION/RELOCATION OF SPRINKLER HEADS AND ASSOCIATED PIPING AT 5TH-FLOOR OF EXISTING BUILDING PER APPROVED PLANS, HYDRAULIC CALCULATIONS AND NFPA 13.

  4. Issued May 7, 2026

    801-21 Spruce St

    Addition and/or Alteration · Add speakers and strobe to existing FACP per Johnson Control Shop drawings and 2016 NFPA 72.

  5. Issued Apr 22, 2026

    801-21 Spruce St

    Alterations · ALERATIONS TO HOSPITAL. INTERIOR INSTALLATION OF DRAINAGE, WASTE, VENT, AND WATER SUPPLY FOR LISTED FIXTURES. ALL MATERIALS SHALL BE METALLIC TO ROOF EXTENSION. VENTING TO BE DESIGNED AND INSTALLED IN ACCORDANCE WITH SECTION 919 PHILADELPHIA SINGLE STACK VENT SYSTEM. ALL WORK TO BE INSTALLED IN STRICT COMPLIANCE WITH 2018 PPC AND APPROVED PLANS

  6. Issued Apr 20, 2026

    801-21 Spruce St

    Rough-In · Rough-In Permit for EP-2026-003344 Add speakers and strobe to existing FACP per Johnson Control Shop drawings. ***Electrical $976,715 plus Fire Alarm $92,913= Total $1,069,628*** Electrical portion of project was applied for under EP-2026-001008

  7. Issued Mar 2, 2026

    801-21 Spruce St

    Addition and/or Alteration · Install (3) Down lights, (1) 16ft. Linear, (3) Led 2X4 lay-in fixtures, (4) new switches, (8) Quad Receptacles, (3) Duplex Receptacles as per 2017 NEC. Relocate (2) existing fire alarm devices as per 2016 NFPA 72.

  8. Issued Feb 10, 2026

    801-21 Spruce St

    Addition and/or Alteration · Install new normal and emergency electrical panels fed from the existing building distribution panels. Provide new LED lighting with automatic lighting controls. Install new receptacle outlets and GFCI devices fed from the new panels. Provide raceways and back boxes for voice and data systems. Install security system and nurse call wiring and devices. Provide power connections for mechanical equipment, HVAC systems, and heat trace cabling, All work to be done in accordance with the 2017 NEC a

  9. Issued Feb 6, 2026

    801-21 Spruce St

    Rough-In · Rough-In Permit for EP-2026-001008 Install new normal and emergency panels, fed from existing building distribution panels. New LED lighting with auto control. New receptacles and GFI's fed from new panels. Raceway and back boxes for voice/ data. Install security and nurse call wiring and devices. Power connections to mechanical and HVAC and heat trace cable. Final power connections to owner equipment.

  10. Issued Oct 9, 2025

    1 units

    801-21 Spruce St

    Addition and/or Alteration · FOR A LEVEL II INTERIOR ALTERATIONS (NO CHANGE IN OCCUPANCY) TO THE 5TH FLOOR LEVEL OF AN EXISTING HOSPITAL FACILITY . ALTERATIONS TO INCLUDE THE ERECTION OF PARTITION WALLS, PROVIDE FINISHES/FURNISHINGS, AND ACCESSIBILITY IMPROVEMENTS THROUGHOUT. BUILDING TO BE FULLY SPRINKLERED. ALL WORK TO BE DONE PER APPROVED PLANS AND PA DOH APPROVAL. IF FIELD CONDITIONS VARY CONTACT DESIGN PROFESSIONAL PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK. **ASBESTOS REMEDIA

Track this owner

We'll flag their next deal, permit, or filing — usually before the neighbors know.

Entities are grouped by a normalized name from the public record; a separate legal entity per building is common, so some portfolios span several related names. Sources: Phila. Dept. of Records (deeds), L&I (permits & violations), Dept. of Revenue (tax delinquencies), reflecting the record as of our last weekly ingest. Verify independently before relying on it.
Last generated July 15, 2026.