Entity File · The Public Record
Company / LLC
Davis S Owens Group
52 permits
- Records on file
- 52
Built (as contractor)
52 entries
- Issued Jul 6, 2026
Addition and/or Alteration · Provide light, branch circuit and installation Provide receptacle, branch circ. & installation Provide electric heater connection & branch
- Issued Jun 26, 2026
Addition and/or Alteration · Installing 200A service and panel in addition to rewire to existing locations in the basement and first floor. Basement which is un-habitable, basement for utilities
- Issued Jun 19, 2026
Addition and/or Alteration · Furnish and install fire alarm system PER APPROVED DRAWINGS-2017 NEC,2016 NFPA-72. -NOTED: CO ALARMS TO BE INSTALLED-
- Issued Jun 19, 2026
Addition and/or Alteration · Furnish and install Fire Alarm System . ALL WORK IS TO BE DONE ACCORDING TO APPROVED DRAWINGS-2017 NEC,2016 NFPA-72 -NOTED:CO DETECTION TO BE INSTALLED-
- Issued Jun 19, 2026
Addition and/or Alteration · Furnish and install fire alarm system . ALL WORK IS TO BE DONE ACCORDING TO APPROVED DRAWINGS-2017 NEC,2016 NFPA-72. -NOTED : CO ALARMS TO BE INSTALLED-
- Issued Jun 19, 2026
Addition and/or Alteration · Furnish and install fire alarm system PER APPROVED DRAWINGS-2017 NEC,2016 NFPA-72. -NOTED : CO ALARMS TO BE INSTALLED-
- Issued Jun 19, 2026
Addition and/or Alteration · Furnish and install fire alarm system PER APPROVED DRAWINGS-2017 NEC,2016 NFPA-72 -NOTED: CO ALRMS TO BE INSTALLED-
- Issued Jun 9, 2026
Addition and/or Alteration · Provide light, branch circuit and installation Provide receptacle, branch circ. & installation Provide electric heater connection & branch
- Issued Jun 2, 2026
Addition and/or Alteration · Provide light, branch circuit and installation Provide receptacle, branch circ. & installation Provide electric heater connection & branch
- Issued Apr 20, 2026
Addition and/or Alteration · Provide light, branch circuit and installation Provide receptacle, branch circ. & installation Provide electric heater connection & branch
- Issued Apr 20, 2026
Addition and/or Alteration · Electrical Permit for combo CP-2026-000795
- Issued Apr 20, 2026
Addition and/or Alteration · Provide light, branch circuit and installation Provide receptacle, branch circ. & installation Provide electric heater connection & branch
- Issued Apr 6, 2026
New Construction · Provide new wiring through-out according to the NEC Standard with hardwired smoke detectors. Providing new 200amp emergency disconnect and arc fault breakers adding to an existing 200amp service.
- Issued Apr 6, 2026
Addition and/or Alteration · Add new fire alarm devices to existing system located on the first floor as per 2016 NFPA 72.
- Issued Mar 27, 2026
Addition and/or Alteration · Provide light, branch circuit and installation Provide receptacle, branch circ. & installation Provide electric heater connection & branch
- Issued Mar 27, 2026
Addition and/or Alteration · Provide light, branch circuit and installation Provide receptacle, branch circ. & installation Provide electric heater connection & branch
- Issued Mar 4, 2026
Addition and/or Alteration · 1 Provide light, branch circuit and installation 2 Provide receptacle, branch circ. & installation 3 Provide electric heater connection & branch
- Issued Mar 4, 2026
Addition and/or Alteration · 1 Provide light, branch circuit and installation 2 Provide receptacle, branch circ. & installation 3 Provide electric heater connection & branch
- Issued Feb 24, 2026
Addition and/or Alteration · 1 Provide light, branch circuit and installation 2 Provide receptacle, branch circ. & installation 3 Provide electric heater connection & branch
- Issued Feb 24, 2026
Addition and/or Alteration · 1 Provide light, branch circuit and installation 2 Provide receptacle, branch circ. & installation 3 Provide electric heater connection & branch
- Issued Feb 24, 2026
Addition and/or Alteration · 1 Provide light, branch circuit and installation 2 Provide receptacle, branch circ. & installation 3 Provide electric heater connection & branch
- Issued Feb 17, 2026
Addition and/or Alteration · Demolition of first floor lobby, conference room, and cafeteria areas. Install new lighting, wiring devices, lighting controls, box and conduit for future low voltage systems and power connections as per 2017 NEC.
- Issued Feb 13, 2026
Addition and/or Alteration · Install (3) 30 amp wall heaters and connect them to existing panel.
- Issued Jan 30, 2026
Addition and/or Alteration · Amend Permit 2/24/2026 - Upgrade to 200A service and panel instead of 100A service. Provide new wiring through-out according to the NEC Standard with hardwired smoke detectors. Provide new 100 amp service with installation of arc-fault breakers.
- Issued Jan 7, 2026
Addition and/or Alteration · Provide new wiring throughout as per NEC standard with hardwired smoke detectors. Install new 100 AMP service with arc fault breakers.
- Issued Dec 23, 2025
Addition and/or Alteration · Provide light, branch circuit and installation Provide receptacle, branch circ. & installation Provide electric heater connection & branch
- Issued Dec 23, 2025
Addition and/or Alteration · Provide light, branch circuit and installation Provide receptacle, branch circ. & installation Provide electric heater connection & branch
- Issued Dec 23, 2025
Addition and/or Alteration · Provide light, branch circuit and installation Provide receptacle, branch circ. & installation Provide electric heater connection & branch
- Issued Dec 4, 2025
Addition and/or Alteration · Provide light, branch circuit and installation Provide receptacle, branch circ. & installation Provide electric heater connection & branch
- Issued Nov 19, 2025
Addition and/or Alteration · Provide light, branch circuit and installation Provide receptacle, branch circ. & installation Provide electric heater connection & branch
- Issued Nov 18, 2025
Addition and/or Alteration · Provide and Install Weather Head and 200A Service Lateral Provide and Install PECO Meter Socket Provide and iInstall 200A SE cable from Meter Socket to Panel Provide and Install 200A Panel Provide and Install Grounding
- Issued Nov 7, 2025
Addition and/or Alteration · Provide light, branch circuit and installation Provide receptacle, branch circ. & installation Provide electric heater connection & branch
- Issued Nov 7, 2025
Addition and/or Alteration · Provide light, branch circuit and installation Provide receptacle, branch circ. & installation Provide electric heater connection & branch
- Issued Nov 7, 2025
Addition and/or Alteration · Provide light, branch circuit and installation Provide receptacle, branch circ. & installation Provide electric heater connection & branch
- Issued Oct 28, 2025
Addition and/or Alteration · Provide light, branch circuit and installation Provide receptacle, branch circ. & installation Provide electric heater connection & branch
- Issued Oct 28, 2025
Addition and/or Alteration · Provide light, branch circuit and installation Provide receptacle, branch circ. & installation Provide electric heater connection & branch
- Issued Oct 8, 2025
Addition and/or Alteration · INSTALL BRANCH CIRCUITS FOR LIGHTING, RECEPTACLES AND ELECTRIC HEATER. ALL WORK TO BE DONE ACCORDING TO THE 2017 NEC.
- Issued Oct 7, 2025
Addition and/or Alteration · Provide light, branch circuit in bathroom Provide receptacle, branch circuit in bathroom Provide electric heater connection and branch
- Issued Oct 7, 2025
Addition and/or Alteration · Provide light, branch circuit in bathroom Provide receptacle, branch circuit in bathroom Provide electric heater connection and branch
- Issued Oct 7, 2025
Addition and/or Alteration · Provide light, branch circuit in bathroom Provide receptacle, branch circuit in bathroom Provide electric heater connection and branch
- Issued Sep 29, 2025
Addition and/or Alteration · Provide light, branch circuit and installation Provide receptacle, branch circ. & installation Provide electric heater connection & branch
- Issued Sep 22, 2025
Addition and/or Alteration · Install 200A service including lateral, meter socket and 200A panel with breakers. Also rewiring interior of house to existing locations.
- Issued Sep 13, 2025
Addition and/or Alteration · Fit out of bathroom including light fixture, GFI receptacle and power connection.
- Issued Sep 13, 2025
Addition and/or Alteration · Fit out of bathroom including light fixture, GFI receptacle and power connection.
- Issued Aug 15, 2025
Addition and/or Alteration · Provide light, branch circuit and installation Provide receptacle, branch circ. & installation Provide electric heater connection & branch 100A Service Panel
- Issued Aug 12, 2025
Addition and/or Alteration · Provide light, GFI receptacle, electric heater connection along with branch circuit.
- Issued Aug 8, 2025
Addition and/or Alteration · INSTALL WIRING, LIGHTING, LIGHT CONTROLS AND RECEPTACLE OUTLETS. INSTALL BRANCH CIRCUITS FOR ELECTRICAL EQUIPMENT. ALL WORK TO BE DONE ACCORDING TO THE 2017 NEC AND PER PLANS. AMENDMENT: INSTALL TELECOMMUNICATIONS WIRING ACCORDING TO THE 2017 NEC.
- Issued Aug 1, 2025
Addition and/or Alteration · INSTALL 60 AMP DEDICATED BRANCH CIRCUIT FOR EVC CHARGER. EVC CHARGER WILL BE INSTALLED IN THE GARAGE. ALL WORK TO BE DONE ACCORDING TO THE 2017 NEC AND PER PLANS.
- Issued Aug 1, 2025
Addition and/or Alteration · Provide new 100A Service with meter socket and 100A panel in addition to re-wire the entire house to existing location. Add receptacle and light to bathroom.
- Issued Jul 31, 2025
Addition and/or Alteration · Provide light, branch circuit in bathroom Provide receptacle, branch circuit in bathroom Provide electric heater connection and branch
- Issued Jul 31, 2025
Addition and/or Alteration · Provide light, branch circuit in bathroom Provide receptacle, branch circuit in bathroom Provide electric heater connection and branch
Track this owner
We'll flag their next deal, permit, or filing — usually before the neighbors know.
Entities are grouped by a normalized name from the public record; a separate legal entity per building is common, so some portfolios span several related names. Sources: Phila. Dept. of Records (deeds), L&I (permits & violations), Dept. of Revenue (tax delinquencies), reflecting the record as of our last weekly ingest. Verify independently before relying on it.
Last generated August 1, 2026.