Entity File · The Public Record
Contractor
D'narpo Electrical
69 permits
- Records on file
- 69
Built (as contractor)
69 entries
- Issued Jun 25, 2026
Addition and/or Alteration · New wire thru out lighting outlets switches smokes and co's replace 100 amp panel all work as per 2017 nec code
- Issued Jun 23, 2026
Addition and/or Alteration · 200 Amp service, rewire full house outlets + switches
- Issued Jun 23, 2026
Addition and/or Alteration · NEW WIRE THRU OUT LIGHTING OUTLETS SWITCHES SMOKES AND CO'S 2 FLOOR BATHROOM AND BEDROOM AND KITCHEN ALL WORK AS PER 2017 NEC CODE 100 AMP SUB PANEL
- Issued Jun 16, 2026
Addition and/or Alteration · Interior rewire and renew 150AMP panel
- Issued Jun 10, 2026
Addition and/or Alteration · INSTALL 200 AMP ELECTRICAL SERVICE AND 2 METER PACKS (ONE (1) IS EXISTING) WITH PROPER GROUNDING AND BONDING, PER 2017 NEC AND PECO REQUIREMENTS
- Issued Jun 9, 2026
Addition and/or Alteration · Remove interior door, close wall opening, utilize existing 20 amp electric receptacle, to install electrical fire place
- Issued May 29, 2026
Addition and/or Alteration · Electrical Permit for combo RP-2025-013124
- Issued May 8, 2026
Addition and/or Alteration · New installation of 200 Amp Service, replace lights, switches and fishing wire behind sheetrock.
- Issued May 8, 2026
Addition and/or Alteration · Upgrade Existing Service from 100A to 200A, Replace meter socket (200A Rated), New 200A panel installation, and grounding system upgrade as per 2017 NEC code
- Issued May 1, 2026
Addition and/or Alteration · New wire throughout, lighting, outlet, switches, smoke and CO's, and install a 200-amp service
- Issued May 1, 2026
Addition and/or Alteration · Fishing wire behind sheetrock on first fl, and partial on 2nd floor, new wire partial on 2nd floor and new wire thru out lights, outlets, switch's, smoke and CO's, 200 amp service as per 2017 NEC code
- Issued Apr 20, 2026
Addition and/or Alteration · New wire throughout lighting outlets switches smokes and CO's 200 amps service as per 2017 NEC code.
- Issued Apr 20, 2026
Addition and/or Alteration · Replacement of breakers and panel. Receptacle replacement throughout circuit trace house for panel labeling. All work as per 2017 NEC code. Finish work only.
- Issued Apr 20, 2026
Addition and/or Alteration · ADD 3 OUTLETS 2 OUTSIDE LIGHTS AND 2 SINGLE POLE SWITCHES ALL WORK AS PER 2017 NEC CODE
- Issued Apr 20, 2026
Addition and/or Alteration · NEW WIRE THRU OUT LIGHTING OUTLETS SWITCHES SMOKES AND CO's 100 SUB PANEL ALL WORK AS PER 2017 NEC CODE 2 FLOOR APARTMENT ONLY
- Issued Apr 2, 2026
New Construction · Install a 600-amp electrical service with four (4) meter packs, including proper grounding and bonding. Install one (1) 100-amp subpanel for the house panel, one (1) 200-amp subpanel for the commercial space, and one (1) 125-amp subpanel for each of the two (2) dwelling units. Provide electrical wiring throughout the building, including installation of lighting fixtures, switches, exit signs, emergency lighting, and receptacle outlets. Install interconnected smoke and carbon monoxide alarms. Fu
- Issued Mar 21, 2026
Addition and/or Alteration · Installed 4 dedicated 20n amp circuits installed 2 dedicated 240 volt 30 amp circuits installed exit combo all work as per 2017 nec code all new wire for circuits ran fishing of walls only
- Issued Mar 21, 2026
Addition and/or Alteration · NEW WIRE THROUGHOUT LIGHTING OUTLETS SWITCHES SMOKES AND CO,S 200 AMP SERVICE ALL WORK AS PER 2017 NEC CODE
- Issued Mar 18, 2026
Addition and/or Alteration · Interior wiring, outlets, lights, switches on first floor and basement. All work per approved plans NEC 2017 ***NO FIRE ALARM ON THIS PERMIT.***
- Issued Mar 6, 2026
New Construction · Install a 600-amp electrical service and a seven-meter pack with proper grounding and bonding. Install one 100-amp subpanel for the house, one 125-amp subpanel for each of the four dwelling units, and one 150-amp subpanel for each of the remaining two dwelling units. Provide all associated wiring, lighting, switches, and receptacle outlets. Install interconnected smoke and carbon monoxide alarms. Install a complete fire alarm system. ALL WORK TO BE DONE ACCORDING TO THE 2017 NEC, 2016 NFPA 72
- Issued Mar 5, 2026
Addition and/or Alteration · New wire throughout, outlets, switches, smokes, and CO's. 200 amp service. All work as per 2017 NEC code.
- Issued Feb 27, 2026
Addition and/or Alteration · Modify existing fire alarm system to accommodate renovation. Add/relocate addressable devices including manual pull stations, smoke/heat detectors, sprinkler monitoring, and horn/strobes as shown on approved plans. Connect new devices to existing FACP and update programming as required. All work to comply with 2016 NFPA 72, NEC 2017, and Philadelphia Fire Code. Provide testing and final inspection.
- Issued Feb 25, 2026
Addition and/or Alteration · Permit amended on 4/13/26: New dormer on front of home at second floor attic/office area. Changed addition foundation from poured concrete to cmu. details as shwon on the plan. FOR THE ERECTION OF AN ADDITION AT THE REAR FOR A NEW ENLARGED KITCHEN, NEW DORMER ABOVE THE EXISTING FIRST FLOOR AT SECOND FLOOR LEVEL TO CREATE A NEW MASTER BEDROOM AND BATHROOM. SOME FIRST FLOOR RENOVATIONS TO REMOVE SOME EXISTING WALLS TO OPEN TO DINING ROOM, NEW LAUNDRY ROOM AND RENOVATED BATHROOM. DETAILS AS SHOWN
- Issued Feb 16, 2026
Addition and/or Alteration · NEW WIRE THRU OUT LIGHTING OUTLETS SWITCHES SMOKES AND CO'S 200 AMP SERVICE ALL WORK AS OF 2017 NEC CODE
- Issued Feb 12, 2026
Addition and/or Alteration · INSTALL 400 AMP ELECTRICAL SERVICE AND 4 METER PACKS WITH PROPER GROUNDING AND BONDING. INSTALL ONE 100 AMP SUBPANELS FOR HOUSE AND ONE 125 AMP SUBPANEL FOR EACH OF THE 3 DWELLING UNITS. INSTALL WIRING, LIGHTING, SWITCHES AND RECEPTACLE OUTLETS. INSTALL INTERCONNECTED SMOKE AND CO ALARMS. INSTALL FIRE ALARM SYSTEM. ALL WORK TO BE DONE ACCORDING TO THE 2017 NEC, 2016 NFPA 72 AND PER APPROVED PLANS.
- Issued Feb 11, 2026
Addition and/or Alteration · Renew existing 150 AMP service and panel, interior wiring with switches and receptacles, and LED lighting
- Issued Feb 10, 2026
Addition and/or Alteration · Renew 125 AMP Panel, renew interior wiring, switches and receptacles and install LED lighting
- Issued Feb 4, 2026
Addition and/or Alteration · NEW WIRE THRU OUT LIGHTING OUTLETS SWITCHES SMOKES AND CO'S 200AMP SERVICE ALL WORK AS PER 2017 NEC CODE FISHNG OF THE WALLS ONLY
- Issued Feb 4, 2026
Addition and/or Alteration · NEW WIRE THRU OUT LIGHTING OUTLETS SWITCHES SMOKE AND CO'S 200 AMP SERVICE ALL WORK AS PER 2017 NEC CODE
- Issued Feb 4, 2026
Addition and/or Alteration · NEW WIRE THRU OUT LIGHTING OUTLETS SWITCHES SMOKES AND CO'S 200 AMP SERVICE ALL WORK AS PER 2017 NEC CODE
- Issued Feb 4, 2026
Addition and/or Alteration · Electrical Permit for combo RP-2026-000276
- Issued Feb 4, 2026
Addition and/or Alteration · NEW WIRE THRU OUT LIGHTING OUTLETS SWITCHES SMOKES AND CO'S 200 AMP SERVICE ALL WORK AS PER 2017 NEC CODE
- Issued Dec 9, 2025
Addition and/or Alteration · NEW WIRE THRU OUT LIGHTING OUTLETS SWITCHES KITCHEN ONLY ALL WORK AS PER 2017 NEC CODE
- Issued Dec 2, 2025
Addition and/or Alteration · Electrical Permit for combo RP-2025-008986
- Issued Nov 14, 2025
Addition and/or Alteration · New wire throughout, lighting, outlet, switches, smokes and CO's. All work as per 2017 NEC code.
- Issued Nov 10, 2025
Addition and/or Alteration · New switches, outlets, smokes, and CO's. All work as per 2017 NEC code. Fishing of the walls only.
- Issued Nov 10, 2025
Addition and/or Alteration · New wire throughout, lighting, outlets, switches, smokes, and COs. 1st floor fishing of the walls only. All work as per 2017 NEC code.
- Issued Nov 10, 2025
Addition and/or Alteration · New wire throughout, lighting, outlet, switches, smokes and CO's. 200 amp service. All work as per 2017 NEC code.
- Issued Nov 4, 2025
Addition and/or Alteration · INSTALL FIRE ALARM SYSTEM. ALL WORK TO BE DONE ACCORDING TO THE 2017 NEC, 2016 NFPA 72 AND PER PLANS.
- Issued Nov 4, 2025
Addition and/or Alteration · INSTALL 200 AMP ELECTRICAL SERVICE AND THE MAIN CIRCUIT BREAKER PANEL WITH PROPER GROUNDING AND BONDING. REWIRE HOUSE THROUGHOUT. INSTALL LIGHTING, SWITCHES AND RECEPTACLES OUTLETS. INSTALL 120 VOLTS INTERCONNECTED SMOKE/CO ALARMS. ALL WORK TO BE DONEACCORDING TO THE 2017 NEC.
- Issued Oct 16, 2025
Addition and/or Alteration · New wire for additional lights and outlets. All work as per 2017 NEC code. FIshing of walls only.
- Issued Oct 14, 2025
Addition and/or Alteration · New wire throughout, lighting, outlet, switches, smokes and CO's. 200 amp service. All work as per 2017 NEC code.
- Issued Oct 12, 2025
Addition and/or Alteration · New wire throughout, lighting, outlet, switches, smokes and CO's. 200 amp service. All work as per 2017 NEC code.
- Issued Oct 12, 2025
Addition and/or Alteration · New wire throughout, lighting, outlet, switches, smokes and CO's. 200 amp service. All work as per 2017 NEC code.
- Issued Oct 9, 2025
Addition and/or Alteration · Electrical Permit for combo RP-2025-003145
- Issued Oct 8, 2025
Addition and/or Alteration · Electrical Permit for combo RP-2025-006615
- Issued Oct 6, 2025
Addition and/or Alteration · NEW WIRE THRU OUT LIGHTING OUTLETS SWITCHES SMOKES AND CO'S 100 AMP SERVICE ALL WORK AS PER 2017 NEC CODE
- Issued Oct 3, 2025
Addition and/or Alteration · New wire throughout, outlets, switches, smokes, and CO's. 200 amp service. All work as per 2017 NEC code.
- Issued Aug 21, 2025
Addition and/or Alteration · New wire throughout, lighting, outlets, switches, smokes, and CO's. 200 amp service. All work as per 2017 NEC code.
- Issued Aug 13, 2025
Addition and/or Alteration · NEW WIRE THRU OUT LIGHTING OUTLETS SWITCHES SMOKES AND CO,S 200 AMP SERVICE ALL WORK AS PER 2017 NEC CODE
- Issued Aug 13, 2025
Addition and/or Alteration · SFD-New wire throughout, lighting, outlets, switches, smokes, and CO's. 100 amp service. All work as per 2017 NEC code.
- Issued Aug 13, 2025
Addition and/or Alteration · New wire throughout, lighting, outlets, switches, smokes, and CO's. 200 amp service. All work as per 2017 NEC code.
- Issued Aug 13, 2025
Addition and/or Alteration · New wire throughout, lighting, outlets, switches, smokes, and CO's. 200 amp service. Fishing of the walls only. All work as per 2017 NEC code.
- Issued Aug 6, 2025
Addition and/or Alteration · INSTALL 400 AMP ELECTRICAL SERVICE AND 4 METER PACKS WITH PROPER GROUNDING AND BONDING. INSTALL ONE 60 AMP SUBPANELS FOR HOUSE AND ONE 150 AMP SUBPANELS FOR EACH OF THE 3 DWELLING UNITS. INSTALL WIRING, LIGHTING, SWITCHES AND RECEPTACLE OUTLETS. INSTALL INTERCONNECTED SMOKE AND CO ALARMS ACCORDING TO THE 2017 NEC. INSTALL FIRE ALARM SYSTEM ACCORDING TO THE 2016 NFPA 72 AND PER PLANS.
- Issued Jul 23, 2025
Addition and/or Alteration · New wire throughout, lighting, outlets, switches, smokes, and CO's. All work as per 2017 NEC code. 100 amp sub panel.
- Issued Jul 23, 2025
Addition and/or Alteration · Electrical Permit for combo RP-2025-006186
Track this owner
We'll flag their next deal, permit, or filing — usually before the neighbors know.
Entities are grouped by a normalized name from the public record; a separate legal entity per building is common, so some portfolios span several related names. Sources: Phila. Dept. of Records (deeds), L&I (permits & violations), Dept. of Revenue (tax delinquencies), reflecting the record as of our last weekly ingest. Verify independently before relying on it.
Last generated July 17, 2026.