Drexel University
3 sold · 39 permits · $216K owed · 70 violations
- Records on file
- 114
- Owed to the city
- $216,099
Sold
3 entries
Permits (as owner)
39 entries
- Issued Jul 1, 2026
Addition and/or Alteration · New theater lighting, controls, power & dimming panels. All work per approved plans NEC 2017 ***NO FIRE ALARM ON THIS PERMIT***
- Issued Jun 24, 2026
Addition and/or Alteration · Electrical fitout for new laboratories including new electrical panels, new lighting and new branch wiring and fire alarm. Lev 01, 1st, 2nd & 3rd floors .ALL WORK IS TO BE DONE ACCORDING TO APPROVED DRAWINGS-2017 NEC,2016 NFPA-72.
- Issued Jun 16, 2026
Addition and/or Alteration · Provide and install 1003 Cat6A plenum cables at 175' average. Provide and install 24 displays.(16 ea. 75" to 98" and 08 ea. 55" to 65") Provide and install 49 card reader locations consisting of 1 cable. Provide and install 55 cameras. All work will be completed per current NEC. No rescue systems work.
- Issued Jun 8, 2026
1 units
Addition and/or Alteration · FOR LEVEL I ALTERATIONS TO AN EXISTING ASSEMBLY (A-1, THEATER) SPACE. ALTERATIONS TO INCLUDE LIGHTING UPGRADES, PROVIDE FINISHES/FURNISHINGS AND RELATED IMPROVEMENTS THROUGHOUT. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK.
- Issued Mar 25, 2026
Addition and/or Alterations · FOR INSTALLATION OF HVAC APPLIANCES, EQUIPMENT, DUCTWORK AND REGISTERS/DIFFUSERS PER APPROVED PLANS AND MANUFACTURER'S SPECIFICATIONS.
- Issued Feb 9, 2026
1 units
Addition and/or Alteration · FOR LEVEL II ALTERATIONS TO AN EXISTING STRUCTURE. ALTERATIONS TO INCLUDE PARTIAL DEMOLITION AND THE ERECTION OF SHORING FOR THE REPLACEMENT OF SIDE REAR WALL AND ERECTION OF PARTITION WALLS, FOR USE AS PREVIOUSLY APPROVED. ALL WORK TO BE DONE PER APPROVED PLANS AND DOCUMENTATION. ***************** SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK. ******************************************
- Issued Feb 6, 2026
Addition and/or Alterations · INSTALL A NEW 4" AMES COLT400 BACKFLOW PREVENTION ASSEMBLY FOR AN EXISTING FIRE SUPPRESSION SYSTEM COMPLYING WITH NFPA 13R. ALL WORK SHALL BE PERFORMED BY A FIRE SUPPRESSION CONTRACTOR LICENSED BY THE CITY OF PHILADELPHIA.
- Issued Feb 5, 2026
Addition and/or Alterations · FOR ALTERATIONS TO AN EXISTING NFPA 13 AUTOMATIC WET SPRINKLER SYSTEM TO INSTALL ONE (1) NEW SIX (6) INCH BACKFLOW PREVENTER WITHIN AN EXISTING FIRE PUMP ROOM. ALL WORK TO BE DONE PER APPROVED PLANS BY A FIRE SUPPRESSION CONTRACTOR LICENSED BY THE CITY OF PHILADELPHIA. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK.
- Issued Jan 28, 2026
Addition and/or Alteration · ELECTRICAL WORK FOR NEW COUNTERTOPS AND NEW CEILINGS INCLUDING LIGHTS, AND RECEPTACLES, NO FIRE ALARM. EXISTING PANEL TO BE USED
- Issued Jan 20, 2026
Addition and/or Alterations · EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the relocation of sprinkler heads as per attached standards. Deviations from these standards require submission of construction and site plans. RELOCATE (825) SPRINKLER HEADS, PER NFPA 13
- Issued Jan 16, 2026
Addition and/or Alterations · FOR THE INSTALLATION OF REGISTERS, DIFFUSERS, AND APPLIANCES WITH ASSOCIATED DUCTWORK. APPLIANCES TO BE INSTALLED IN ACCORDANCE WITH MANUFACTURER'S SPECIFICATIONS. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS REQUIRED FOR ALL OTHER WORK.
- Issued Jan 15, 2026
New Construction or Additions · For minor construction work at the subject property in accordance with all applicable provisions of the Philadelphia Code, all references codes and standards, and the attached EZ Standard, where included. Deviation from this standard shall result in permit revocation. A separate permit from the Philadelphia Department of Streets is required for any sidewalk and street closures. All means of pedestrian protection required at the site in accordance with the Philadelphia Building Code Chapter 33 sh
- Issued Jan 14, 2026
1 units
Addition and/or Alteration · FOR THE FIT OUT OF OFFICE SPACES, LIFE SCIENCE RESEARCH AND LABORATORIES ( BUSINESS OCCUPANCY) ON LEVEL 1, 2 AND 3, ASSEMBLY OCCUPANCY (A-3) ON LEVEL 0-A, AND STORAGE SPACES (S-2 OCCUPANCY) ON LEVEL 0-A AND LEVEL P1. NEW CONSTRUCTION PERMIT IS UNDER #CP-2022-003830. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK. AMENDMENT APPROVED AS OF 05/19/2026: TO UPDATE THE LO FOR
- Issued Jan 13, 2026
Alterations · To relocate 2 existing sinks, including new water & drain lines.
- Issued Jan 8, 2026
Addition and/or Alteration · Install receptacles lighting with a 2 room renovation & 1 Panel upgrade .ALL WORK IS TO BE DONE ACCORDING TO APPROVED DRAWINGS-2017 NEC. **NO FIRE ALARM ON THIS PERMIT**
- Issued Jan 8, 2026
Addition and/or Alterations · EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the relocation of sprinkler heads as per attached standards. Deviations from these standards require submission of construction and site plans. Relocate (6) sprinkler heads to accommodate interior alterations
- Issued Dec 23, 2025
1 units
Addition and/or Alteration · FOR LEVEL II INTERIOR ALTERATIONS FOR NEW TENANT FOR THE BUSINESS (B) OCCUPANCY ON PARTIAL FIRST FLOOR. ALTERATIONS TO INCLUDE THE ERECTION OF PARTITION WALLS, PROVIDE FINISHES/FURNISHINGS AND ACCESSIBILITY IMPROVMENTS THROUGHOUT. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK.
- Issued Dec 8, 2025
Alterations · • Provide labor and material to disconnect [1] sink. All are to be dropped to the floor for removal by others. • Furnish and install [1] Sink • Provide labor and materials to extend from existing sanitary, vent and domestic water to new sink location
- Issued Nov 26, 2025
1 units
Addition and/or Alteration · FOR LEVEL II ALTERATIONS TO INCLUDE NEW PARTITIONS, FIXTURES, FURNISHINGS, MILLWORK, FINISHES AS PER APPROVED PLANS. SEPARATE PERMITS REQUIRED FOR MEP WORK.
- Issued Oct 29, 2025
Addition and/or Alteration · Connect 1 hydration stations to electricity (replace in kind).
- Issued Oct 29, 2025
Addition and/or Alteration · Install / Replace Siemens 20 Amp Single Pole Bolt On Breaker Install MC Wire 12/2 In Open Area Up To 75 Ft. Does not include a breaker if needed as a dedicated circuit and should be added separately.
- Issued Oct 2, 2025
1 units
Addition and/or Alteration · FOR REPLACEMENT OF EXISTING WINDOWS PER APPROVED PLANS. ***EXTERIOR WORK ONLY***
- Issued Sep 30, 2025
1 units
Addition and/or Alteration · FOR LEVEL I ALTERATIONS TO AN EXISTING APARTMENT BUILDING (R-2 OCCUPANCY), ALTERATIONS TO INCLUDE WINDOW REPLACEMENT AND RELATED REPAIR WORK (ONLY). ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK. **SUBJECT TO THE FOLLOWING CONDITION OF APPROVAL FROM THE PHILADELPHIA HISTORICAL COMMISSION: Window 2.1 to have exterior horizontal center bar, either in the middle or 2/3rds u
- Issued Sep 30, 2025
1 units
Addition and/or Alteration · FOR LEVEL I ALTERATIONS TO AN EXISTING APARTMENT BUILDING (R-2 OCCUPANCY), ALTERATIONS TO INCLUDE WINDOW REPLACEMENT AND RELATED REPAIR WORK (ONLY). ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK. **SUBJECT TO THE FOLLOWING CONDITION OF APPROVAL FROM THE PHILADELPHIA HISTORICAL COMMISSION: Window 2.1 to have exterior horizontal center bar, either in the middle or 2/3rds u
- Issued Sep 30, 2025
1 units
Addition and/or Alteration · FOR REPLACEMENT OF EXISTING WINDOWS PER APPROVED PLANS. ***EXTERIOR WORK ONLY***
- Issued Sep 30, 2025
1 units
Addition and/or Alteration · FOR THE REPLACEMENT OF TWO (2) WINDOWS AT FRONT FACADE. FOR USE AS PREVIOUSLY APPROVED. AS PER APPROVED PLANS. ********SEPARATE PERMITS FOR ALL OTHER WORK. ************************************
- Issued Sep 30, 2025
1 units
Addition and/or Alteration · For selective replacement of existing windows as per approved plans.
- Issued Sep 30, 2025
1 units
Addition and/or Alteration · FOR SELECT WINDOW REPLACEMENT PER APPROVED PLAN.
- Issued Sep 26, 2025
Sign · FOR THE INSTALLATION OF ONE (1) FLAT WALL SIGN WITH STATIC ILLUMINATION, ONE (1) NON-ILLUMINATED FLAT WALL SIGN AND ONE (1) DOUBLE FACED PROJECTING SIGN WITH STATIC ILLUMINATION PER APPROVED PLANS. SEPARATE PERMIT REQUIRED FOR ELECTRICAL WORK.
- Issued Sep 18, 2025
Signs (Accessory / Non-Accessory) · For the erection of one freestanding statically illuminated flat wall sign, one (1) double-faced statically illuminated projecting sign and one (1) non-illuminated flat wall sign.
- Issued Aug 14, 2025
Sign · TO REMOVE TWO (2) SINGLE-FACE ILLUMINATED FLAT WALL SIGNS ON EXISTING CANOPIES AND INSTALLATION OF TWO (2) SINGLE-FACE ILLUMINATED FLAT WALL SIGNS ON THE SAME EXISTING CANOPIES OF AN EXISTING STRUCTURE. AS PER APPROVED PLANS. SEPARATE ELECTRICAL PERMIT REQUIRED.
- Issued Aug 9, 2025
Signs (Accessory / Non-Accessory) · FOR THE REMOVAL OF ALL EXISTING SIGNS AT THE TENANT SPACE; FOR THE ERECTION OF THREE (3) ACCESSORY STATICALLY ILLUMINATED SIGNS, INCLUDING (ONE (1) PROJECTING SIGN, DOUBLE-SIDED, (1) 24” DIA.) AND (TWO (2) FLAT WALL SIGN, SINGLE-SIDED, (1) 60” X 60” & (1) 70” X 10”), ACCESSORY TO AN EXISTING TAKE-OUT RESTAURANT WITH ALL OTHER ACCCESSORY SIGNS AND USES AS PREVIOSLUY APPROVED, SIZE AND LOCATION AS SHOWN ON PLAN.
- Issued Aug 5, 2025
Signs (Accessory / Non-Accessory) · TO REMOVE TWO (2) SINGLE-FACE ILLUMINATED FLAT WALL SIGNS ON EXISTING CANOPIES AND ERECTION OF TWO (2) SINGLE-FACE ILLUMINATED FLAT WALL SIGNS ON THE SAME EXISTING CANOPIES OF AN EXISTING STRUCTURE. SIZE AND LOCATION AS SHOWN ON THE APPLICATION / PLAN.
- Issued Jul 31, 2025
1 units
Addition and/or Alteration · FOR THE REPAIR TO EXTERIOR BUILDING ELEMENTS AS SHOWN ON THE APPROVED PLAN. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS REQUIRED FOR ALL OTHER WORK. **SUBJECT TO THE FOLLOWING CONDITION OF APPROVAL FROM THE PHILADELPHIA HISTORIC COMMISSION: PHC Staff Review of masonry cutout sample in the field required for final approval. PHC Staff Review of masonry pointing sample in the field required for final appro
- Issued Jul 28, 2025
Addition and/or Alteration · Electrical Permit for combo CP-2025-003356 Install all kitchen power ,lighting and receptacles. (FROM EXISTING SERVICE & PANELS) .ALL WORK IS TO BE DONE ACCORDING TO APPROVED DRAWINGS-2017 NEC.
- Issued Jul 25, 2025
Addition and/or Alterations · EZ STANDARD KITCHEN FIRE SUPPRESSION- For the installation of New Wet Chemical Kitchen Fire Suppression System as per attached standard. Deviations from these standards require submission of construction and site plans. INSTALL (1) ONE ANSUL R-102 WET CHEMICAL COMMERCIAL KITCHEN FIRE SUPPRESSION SYSTEM FOR PROTECTION OF KITCHEN EXHAUST HOOD - SEE MECHANICAL PERMIT MP-2025-003558 FOR KITCHEN HOOD.
- Issued Jul 22, 2025
Alterations · INTERIOR ALTERATIONS TO CONVERT STARBUCKS TO SAXBYS. INSTALLATION OF DRAINAGE, WASTE, VENT, AND WATER SUPPLY FOR LISTED IFXTURES CONNECTING TO EXISTING METALLIC PIPING. FOOD PREP FXTURES SHALL BE INSTALLED IN ACCORDANCE WITH INDIRECT WASTE AND INTERCEPTOR REQUIRES AND SHALL BE FITTED WITH BACKFLOW PREVENTERS WHERE REQUIRED. VENTING TO BE DESIGNED AND INSTALLED IN ACCORDANCE WITH SECTION 929 PHIDELPHIA SINGLE STACK VENT SYSTEM. ALL WORK TO BE PERFORMED IN STRICT COMPLIANCE WITH 2018 PPC AND APPRO
Owes the city
2 entries
- 1 yr owed
$187,374
- 5 yrs owed
$28,725
Violations
70 entries
- Violation Jun 29, 2026OPEN
INTERIOR SURFACES
- Violation May 21, 2026OPEN
EQUIPMENT ROOMS
- Violation May 21, 2026OPEN
FIRE COMMAND CENTER STORAGE
- Violation May 21, 2026OPEN
INSPECTION, TESTING & MAINTENANCE
- Violation May 21, 2026OPEN
SUPPRESSION SYSTEM TESTING & MAINTENANCE
- Violation May 21, 2026OPEN
HAZARD IDENTIFICATION SIGNS
- Violation May 21, 2026OPEN
HAZARD IDENTIFICATION SIGNS
- Violation May 21, 2026OPEN
UNAPPROVED CONDITIONS
- Violation May 21, 2026OPEN
UTILITY IDENTIFICATION
- Violation May 21, 2026OPEN
PENETRATIONS MAINTAINING PROTECTION
- Violation May 21, 2026OPEN
LABELING
- Violation May 19, 2026OPEN
PERIODIC TESTING
- Violation May 19, 2026OPEN
EXIT SIGNS
- Violation May 18, 2026OPEN
FIRE EXTINGUISHER CONSPICUOUS LOCATION
- Violation May 18, 2026OPEN
MEANS OF EGRESS CONTINUITY
- Violation May 18, 2026OPEN
COMMERCIAL SYSTEM TEST
- Violation May 18, 2026OPEN
GROUP E ARTWORK IN CORRIDORS
- Violation May 18, 2026OPEN
STORAGE
- Violation Feb 2, 2026OPEN
PERIODIC TESTING
- Violation Oct 24, 2025OPEN
WET CHEMICAL SYSTEMS
- Violation Oct 21, 2025OPEN
PERIODIC TESTING
- Violation Oct 15, 2025OPEN
SUPPRESSION SYSTEM TESTING & MAINTENANCE
- Violation Oct 14, 2025OPEN
SUPPRESSION SYSTEM TESTING & MAINTENANCE
- Violation Oct 9, 2025OPEN
PERIODIC TESTING
- Violation Oct 9, 2025OPEN
SUPPRESSION SYSTEM TESTING & MAINTENANCE
- Violation Oct 7, 2025OPEN
SUPPRESSION SYSTEM TESTING & MAINTENANCE
- Violation Oct 7, 2025OPEN
PERIODIC TESTING
- Violation Oct 6, 2025OPEN
PERIODIC TESTING
- Violation Oct 6, 2025OPEN
SUPPRESSION SYSTEM TESTING & MAINTENANCE
- Violation Oct 6, 2025OPEN
WET CHEMICAL SYSTEMS
- Violation Oct 6, 2025OPEN
FDC SIGNAGE REQUIRED
- Violation Oct 2, 2025OPEN
PERIODIC TESTING
- Violation Oct 2, 2025OPEN
SUPPRESSION SYSTEM TESTING & MAINTENANCE
- Violation Sep 23, 2025OPEN
SUPPRESSION SYSTEM TESTING & MAINTENANCE
- Violation Sep 23, 2025OPEN
PERIODIC TESTING
- Violation Sep 23, 2025OPEN
SUPPRESSION SYSTEM TESTING & MAINTENANCE
- Violation Sep 17, 2025OPEN
PERIODIC TESTING
- Violation Sep 17, 2025OPEN
SUPPRESSION SYSTEM TESTING & MAINTENANCE
- Violation Sep 17, 2025OPEN
SUPPRESSION SYSTEM TESTING & MAINTENANCE
- Violation Sep 17, 2025OPEN
WET CHEMICAL SYSTEMS
- Violation Sep 17, 2025OPEN
SUPPRESSION SYSTEM TESTING & MAINTENANCE
- Violation Sep 17, 2025OPEN
FDC SIGNAGE REQUIRED
- Violation Sep 17, 2025OPEN
SUPPRESSION SYSTEM TESTING & MAINTENANCE
- Violation Sep 4, 2025OPEN
PERIODIC TESTING
- Violation Sep 4, 2025OPEN
EQUIPMENT ROOMS
- Violation Sep 4, 2025OPEN
ILLUMINATION EMERGENCY POWER
- Violation Sep 4, 2025OPEN
POSTING OF OCCUPANT LOAD
- Violation Sep 4, 2025OPEN
UTILITY IDENTIFICATION
- Violation Sep 4, 2025OPEN
HAZARDOUS MATERIALS
- Violation Sep 4, 2025OPEN
INSPECTION, TESTING & MAINTENANCE
- Violation Aug 25, 2025OPEN
PERIODIC TESTING
- Violation Aug 25, 2025OPEN
SUPPRESSION SYSTEM TESTING & MAINTENANCE
- Violation Aug 25, 2025OPEN
SUPPRESSION SYSTEM TESTING & MAINTENANCE
- Violation Jul 21, 2025OPEN
WET CHEMICAL SYSTEMS
- Violation Jul 21, 2025OPEN
PERIODIC TESTING
- Violation Jul 21, 2025OPEN
INSPECTION, TESTING AND MAINTENANCE
- Violation Jul 21, 2025OPEN
SUPPRESSION SYSTEM TESTING & MAINTENANCE
- Violation Jul 21, 2025OPEN
INTERIOR SURFACES
- Violation Jun 18, 2025OPEN
COMMERCIAL SYSTEM TEST
- Violation Jun 18, 2025OPEN
RECORD KEEPING
- Violation Jun 18, 2025OPEN
LOCKDOWN PLAN CONTENTS
- Violation Jun 18, 2025OPEN
GROUP E OCCUPANCIES
- Violation Jun 18, 2025OPEN
FIRE EXTINGUISHER HANGERS & BRACKETS
- Violation Jun 18, 2025OPEN
POSTING OF OCCUPANT LOAD
- Violation Jun 18, 2025OPEN
INSPECTION, TESTING & MAINTENANCE
- Violation Jun 18, 2025OPEN
PERIODIC TESTING
- Violation May 5, 2025OPEN
SUPPRESSION SYSTEM TESTING & MAINTENANCE
- Violation May 5, 2025OPEN
PERIODIC TESTING
- Violation May 2, 2025OPEN
SUPPRESSION SYSTEM TESTING & MAINTENANCE
- Violation Apr 10, 2025OPEN
SUPPRESSION SYSTEM TESTING & MAINTENANCE
Track this owner
We'll flag their next deal, permit, or filing — usually before the neighbors know.
Entities are grouped by a normalized name from the public record; a separate legal entity per building is common, so some portfolios span several related names. Sources: Phila. Dept. of Records (deeds), L&I (permits & violations), Dept. of Revenue (tax delinquencies), reflecting the record as of our last weekly ingest. Verify independently before relying on it.
Last generated July 15, 2026.