Entity File · The Public Record
Owner of record
Enon Tabernacle Baptist Church
5 permits · 9 violations
- Records on file
- 14
Permits (as owner)
5 entries
- Issued Jul 2, 2026
Retaining Wall · EZ PERMIT STANDARDS RETAINING WALLS - For New Retaining Walls as per attached standard. Deviations from these standards require submission of construction and site plans.
- Issued May 18, 2026
Major Demolition · MAKE SAFE PERMIT FOR THE COMPLETE DEMOLITION OF THE SEMI-DETACHED TWO-STORY STRUCTURE BY HAND AND HAND HOLD DEVICES. PEDESTRIAN PROTECTION TO BE IN PLACE PRIOR TO START OF WORK AND TO BE MAINTAINED DURING ALL DEMOLITION ACTIVITIES. *SEPERATE STREETS DEPARTMENT PERMIT REQUIRE FOR CLOSURE OF RIGHT OF WAY. *21 DAY POSING AND NOTICE WAIVED PER A-303.2 *A COVERED WALKWAY OR SIDEWALK CLOSURE SHALL BE REQUIRED WITHIN MIN. 7 FEET OF BUILDING FACADE IN ACCORDANCE WITH SECTION 3306 OF THE IBC.
- Issued Jul 29, 2025
Fence · FOR THE CONSTRUCTION OF A FENCE AROUND PERIMETER OF PROPERTY TO INCLUDE PILLARS AND FOUNDATIONS. AS PER APPROVED PLANS.
Violations
9 entries
- Violation Apr 21, 2025OPEN
RUBBISH & GARBAGE
- Violation Apr 21, 2025OPEN
EXTERIOR AREA WEEDS
- Violation Sep 19, 2024OPEN
CARBON MONOXIDE ALARMS
- Violation Sep 18, 2024OPEN
SMOKE ALARM LOCATION
- Violation Sep 18, 2024OPEN
PLUMBING SYSTEMS- WATER SUPPLY
- Violation Sep 18, 2024OPEN
EXTERIOR STRUCTURE ROOF DRAINAGE
- Violation Sep 18, 2024OPEN
UNFIT STRUCTURE
- Violation Sep 18, 2024OPEN
PLUMBING SYSTEMS- WATER GENERAL
- Violation Sep 18, 2024OPEN
INTERIOR SURFACES
Track this owner
We'll flag their next deal, permit, or filing — usually before the neighbors know.
Entities are grouped by a normalized name from the public record; a separate legal entity per building is common, so some portfolios span several related names. Sources: Phila. Dept. of Records (deeds), L&I (permits & violations), Dept. of Revenue (tax delinquencies), reflecting the record as of our last weekly ingest. Verify independently before relying on it.
Last generated July 15, 2026.