Entity File · The Public Record
Company / LLC
Esm Productions, LLC
12 permits
- Records on file
- 12
Built (as contractor)
12 entries
- Issued Jul 2, 2026
1 units
Addition and/or Alteration · INSTALLATION OF EXTERIOR TEMPORARY EVENT STRUCTURES (UNENCLOSED) AS PER APPROVED PLANS AND PHC APPROVAL. STAIRWAYS TO COMPLY WITH SECTION 1011 OF 2018 IBC AND RAMPS TO COMPLY WITH SECTION 405 OF ICC A117.1-2009 STANDARD. *2018 IBC REVIEW* **SEPARATE PERMIT REQUIRED FOR ANY ELECTRICAL WORK**
- Issued May 29, 2026
1 units
Addition and/or Alteration · **2021 IBC REVIEW** FOR THE ERECTION OF A TEMPORARY TWO-STORY (MAXIMUM OCCUPANT LOAD OF 29 PEOPLE ON SECOND FLOOR LEVEL) COMMERCIAL STRUCTURE TO BE OCCUPIED BY THE GENERAL PUBLIC. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMIITS TO BE OBTAINED FOR ALL OTHER WORK.
- Issued May 29, 2026
1 units
Addition and/or Alteration · **2018 IBC REVIEW** FOR THE ERECTION OF A TEMPOARARY SINGLE-STORY COMMERCIAL STRUCTURE TO BE OCCUPIED BY THE GENERAL PUBLIC. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMIITS TO BE OBTAINED FOR ALL OTHER WORK.
- Issued May 29, 2026
1 units
Addition and/or Alteration · **2021 IBC REVIEW ** FOR THE ERECTION OF A TEMPOARARY SINGLE-STORY COMMERCIAL STRUCTURE TO BE OCCUPIED BY THE GENERAL PUBLIC. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMIITS TO BE OBTAINED FOR ALL OTHER WORK.
- Issued May 28, 2026
1 units
Addition and/or Alteration · **2018 IBC REVIEW** FOR THE ERECTION OF A TEMPORARY SINGLE-STORY COMMERCIAL STRUCTURE NOT OCCUPIED BY THE GENERAL PUBLIC. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMIITS TO BE OBTAINED FOR ALL OTHER WORK.
- Issued May 28, 2026
1 units
Addition and/or Alteration · **2018 IBC REVIEW** FOR THE ERECTION OF A TEMPOARARY SINGLE-STORY COMMERCIAL STRUCTURE NOT OCCUPIED BY THE GENERAL PUBLIC (STAFF ONLY). ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMIITS TO BE OBTAINED FOR ALL OTHER WORK.
- Issued May 28, 2026
1 units
Addition and/or Alteration · INSTALLATION OF TEMPORARY TENT STRUCTURE FOR 5/30/2026 & 5/31/2026 AS PER APPROVED PLANS. TENT AND ACCESSORIES MUST MEET FLAME PROPOGATION PERFORMANCE CRITERIA IN NFPA 701.
- Issued May 28, 2026
1 units
Addition and/or Alteration · **2018 IBC REVIEW** FOR THE ERECTION OF A TEMPORARY SINGLE-STORY COMMERCIAL STRUCTURE TO BE OCCUPIED BY THE GENERAL PUBLIC. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMIITS TO BE OBTAINED FOR ALL OTHER WORK.
- Issued May 28, 2026
1 units
Addition and/or Alteration · **2021 IBC REVIEW** FOR THE ERECTION OF A TEMPORARY MULTI-STORY COMMERCIAL STRUCTURE TO BE OCCUPIED BY THE GENERAL PUBLIC. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMIITS TO BE OBTAINED FOR ALL OTHER WORK.
- Issued May 28, 2026
1 units
Addition and/or Alteration · **2021 IBC REVIEW** FOR THE ERECTION OF A TEMPORARY TWO-STORY COMMERCIAL STRUCTURE TO BE OCCUPIED BY THE GENERAL PUBLIC. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMIITS TO BE OBTAINED FOR ALL OTHER WORK. **OCCUPANT LOAD NOT TO EXCEED 100 PERSONS**
- Issued May 28, 2026
1 units
Addition and/or Alteration · INSTALLATION OF TEMPORARY TENT STRUCTURE FOR 5/30/2026 & 5/31/2026 AS PER APPROVED PLANS. TENT AND ACCESSORIES MUST MEET FLAME PROPOGATION PERFORMANCE CRITERIA IN NFPA 701.
- Issued May 27, 2026
1 units
Addition and/or Alteration · FOR THE ERECTION OF A TEMPOARARY COMMERCIAL STRUCTURE NOT OCCUPIED BY THE GENERAL PUBLIC. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMIITS TO BE OBTAINED FOR ALL OTHER WORK.
Track this owner
We'll flag their next deal, permit, or filing — usually before the neighbors know.
Entities are grouped by a normalized name from the public record; a separate legal entity per building is common, so some portfolios span several related names. Sources: Phila. Dept. of Records (deeds), L&I (permits & violations), Dept. of Revenue (tax delinquencies), reflecting the record as of our last weekly ingest. Verify independently before relying on it.
Last generated August 1, 2026.