- Issued Jun 25, 2026
New Construction or Additions · Install yard drain S-19 and connect to City main
- Issued Jun 17, 2026
New Construction or Additions · INSTALATION OF 2" WATER DISTRIBUTION, HOUSE DRAIN, CURB TRAP, FRESH AIR INLET New main drain and waterlines. New WATER CLOSETS, SUMP PUMPS, SHOWER/TUBS, ROOF DRAINS, LAVATORIES, KITCHEN SINKS, HOT WATER HEATERS, HOSE BIBS, AREA DRAIN
- Issued Jun 17, 2026
New Construction or Additions · INSTALLATION OF 2" WATER DISTRIBUTION, HOUSE DRAIN, CURB TRAP, FRESH AIR INLET New main drain and waterlines. New WATER CLOSETS, SUMP PUMPS, SHOWER/TUBS, ROOF DRAINS, LAVATORIES, KITCHEN SINKS, HOT WATER HEATERS, HOSE BIBS, AREA DRAIN
- Issued Mar 23, 2026
Signs (Accessory / Non-Accessory) · FOR THE INSTALLATION OF ONE (1) NON-ILLUMINATED DIRECTIONAL SIGN. SIZE AND LOCATION AS SHOWN ON PLANS.
- Issued Jan 30, 2026
New Construction · FOR THE INSTALLATION OF REGISTERS, DIFFUSERS, AND APPLIANCES WITH ASSOCIATED DUCTWORK. APPLIANCES TO BE INSTALLED IN ACCORDANCE WITH THE MANUFACTURER’S SPECIFICATIONS. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS REQUIRED FOR ALL OTHER WORK. **AMENDMENT (2-19-2026) FOR CHANGES AS PER THE APPROVED AMENDED CONSTRUCTION DOCUMENTS. **AMENDMENT (3-31-2026) FOR CHANGES AS PER THE APPROVED AMENDED CONSTRUCTION
- Issued Jan 20, 2026
New Construction · EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES- For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. Additional permits may be required.
- Issued Jan 20, 2026
New Construction · EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES- For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. Additional permits may be required. 90k btuh heating and cooling, high efficiency, new ductwork. Same applies to both units
- Issued Jan 20, 2026
New Construction · EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES- For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. Additional permits may be required. 90k btuh heating and cooling, high efficiency, new ductwork. Same applies to both units
- Issued Jan 20, 2026
New Construction · EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES- For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. Additional permits may be required. 90k btu heating and cooling, 92% efficiency furnace, all new ductwork. Same applies to both units
- Issued Jan 14, 2026
Addition and/or Alterations · EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES - For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. 90K BTU 92% furnace, AC, new ductwork, and 6 diffusers
- Issued Jan 14, 2026
New Construction · EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES- For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. Additional permits may be required. 90k btuh heating and cooling, high 92% efficiency furnace 6 Diffusers/Registers connected to new ductwork
- Issued Jul 18, 2025
Fences Only · FOR THE INSTALLATION OF 4 FT. HIGH FENCE (NO MORE THAN 50% OPAQUE). SIZE AND LOCATION AS SHOWN ON PLANS.
- Issued Jul 10, 2025
New Construction · EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES- For Mechanical Work to include the installation as per attached standards. Deviations from these standards require submission of construction and site plans. EACH HVAC UNIT TO BE SELF-CONTAINED WITHIN EACH DWELLING UNIT. NO PENETRATIONS OF RATED ASSEMBLIES.
- Issued Jul 10, 2025
New Construction · EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES- For Mechanical Work to include the installation as per attached standards. Deviations from these standards require submission of construction and site plans. EACH HVAC UNIT TO BE SELF-CONTAINED WITHIN EACH DWELLING UNIT. NO PENETRATIONS OF RATED ASSEMBLIES.
- Issued Jul 10, 2025
New Construction · EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES- For Mechanical Work to include the installation as per attached standards. Deviations from these standards require submission of construction and site plans. EACH HVAC UNIT TO BE SELF-CONTAINED WITHIN EACH DWELLING UNIT. NO PENETRATIONS OF RATED ASSEMBLIES.
- Issued Jul 10, 2025
New Construction · EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES- For Mechanical Work to include the installation as per attached standards. Deviations from these standards require submission of construction and site plans. EACH HVAC UNIT TO BE SELF-CONTAINED WITHIN EACH DWELLING UNIT. NO PENETRATIONS OF RATED ASSEMBLIES.
Track this owner
We'll flag their next deal, permit, or filing — usually before the neighbors know.
Entities are grouped by a normalized name from the public record; a separate legal entity per building is common, so some portfolios span several related names. Sources: Phila. Dept. of Records (deeds), L&I (permits & violations), Dept. of Revenue (tax delinquencies), reflecting the record as of our last weekly ingest. Verify independently before relying on it.
Last generated July 15, 2026.