Entity File · The Public Record
Company / LLC
Fastrack Construction, INC.
6 permits
- Records on file
- 6
Built (as contractor)
6 entries
- Issued Jun 22, 2026
1 units
Addition and/or Alteration · LEVEL II EXTERIOR ALTERATIONS TO INCLUDE RENOVATIONS TO BUILDING ENTRY AREA AND ROOF LEVEL TO CREATE ROOF DECKS AND DOG PARK AND TO EXTEND ELEVATOR TO ROOF LEVEL AS PER APPROVED PLANS. SEE PERMIT CP-2024-006451 FOR BASE BUILDING WORK. EXISTING BUILDING FULLY SPRINKLERED. *2018 IEBC REVIEW*
- Issued Apr 27, 2026
165 units
New Construction · NEW CONSTRUCTION OF A FIVE (5) STORY STRUCTURE TO INCLUDE HORIZONTAL EXITS FOR USE AS ONE HUNDRED SIXTY-FIVE (165) DWELLING UNITS (INCLUDING FORTY (40) AGE-RESTRICTED UNITS) WITH ACCESSORY PARKING GARAGE AS PER APPROVED PLANS. BUILDING TO UTILIZE HORIZONTAL SEPARATIONS TO CREATE TWO (2) SEPARATE BUILDINGS WITH TWO (2) DIFFERENT CONSTRUCTION TYPES (BASEMENT - TYPE IA AND 1ST THROUGH 5TH FLOORS - TYPE IIIB). FIRE RETARDANT TREATED STUDS AND SHEATHING REQUIRED FOR TYPE III CONSTRUCTION. BUILDING TO
- Issued Mar 8, 2026
1 units
Addition and/or Alteration · FOR A LEVEL II INTERIOR ALTERATIONS TO AN EXISTING TENANT SPACE ON THE 1ST FLOOR LEVEL OF AN EXISTING STRUCTURE. ALTERATIONS TO INCLUDE THE ERECTION OF PARTITION WALLS, PROVIDE FINISHES/FURNISHINGS, AND ACCESSIBILITY IMPROVEMENTS THROUGHOUT. BUILDING IS FULLY SPRINKLERED. **ALL WORK TO BE DONE PER APPROVED PLANS. **IF FIELD CONDITIONS VARY CONTACT DESIGN PROFESSIONAL PRIOR TO THE START OF ANY WORK. **SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK.**
- Issued Feb 6, 2026
1 units
Addition and/or Alteration · FOR LEVEL II ALTERATIONS AND CHANGE OF OCCUPANCY AT PORTION OF GROUND FLOOR PER APPROVED PLANS. WORK AREA TO BE FULLY SPRINKLERED WITH NFPA 13. SEPARATE PERMITS REQUIRED FOR MECHANICAL, ELECTRICAL, PLUMBING AND FIRE SUPPRESSION WORK.
- Issued Oct 27, 2025
Addition and/or Alterations · FOR MECHANICAL SYSTEM UPGRADE. APPLIANCES TO BE INSTALLED IN ACCORDANCE WITH THE MANUFACTURER’S SPECIFICATIONS. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS REQUIRED FOR ALL OTHER WORK.
- Issued Jul 15, 2025
1 units
Addition and/or Alteration · FOR PARTIAL CHANGE OF OCCUPANCY AT LOWER LEVEL AND LEVEL II ALTERATIONS TO INCLUDE STRUCTURAL WORK, NEW POOLS, SAUNAS, PARTITIONS, FIXTURES, FURNISHINGS, FLOORING, FINISHES AS PER APPROVED PLANS. SEPARATE PERMITS REQUIRED FOR MEP AND FIRE SUPPRESSION WORK. *2018 IEBC* AMENDMENT 8/20/25 TO INCLUDE POOL DRAWINGS.
Track this owner
We'll flag their next deal, permit, or filing — usually before the neighbors know.
Entities are grouped by a normalized name from the public record; a separate legal entity per building is common, so some portfolios span several related names. Sources: Phila. Dept. of Records (deeds), L&I (permits & violations), Dept. of Revenue (tax delinquencies), reflecting the record as of our last weekly ingest. Verify independently before relying on it.
Last generated August 1, 2026.