Entity File · The Public Record
Company / LLC
Fiduciary CORP, Phila Yrly Meet Friends
17 permits
- Records on file
- 17
Permits (as owner)
17 entries
- Issued Apr 21, 2026
Addition and/or Alteration · Provide and install two (2) wall-mounted fire alarm strobe notification appliances in the jeans X-ray replacement area. Work includes all required wiring, mounting, terminations, and connection to the fire alarm system. All work to be done according to the 2017 NEC, 2016 NFPA 72 and per approved plans.
- Issued Apr 21, 2026
Addition and/or Alteration · STATEMENT OF WORK: HORIZONTAL CABLING: Cabling will be Superior/Essex Category 6A plenum rated 4-pair and CommScope RG6 quad shield plenum rated coax.. • Provide labor to demo/remove all Category 5/6/6A cables in scope area. Demo scope for this project includes removal of existing wall mount bracket and surface mount boxes for existing horizontal cabling in the existing IDF. • Provide and install two (2) flush mount quad Category 6A locations. • Provide and install nine (9) flush mount
- Issued Apr 1, 2026
Alterations · ALTERATIONS TO EXISTING OFFICE SPACE. INTERIOR INSTALLATION OF DRAINAGE, WASTE, VENT, AND WATER SUPPLY FOR LISTED FIXTURES. ALL MATERIALS SHALL BE METALLIC TO ROOF EXTENSION. VENTING TO BE DESIGNED AND INSTALLED IN ACCORDANCE WITH SECTION 919 PHILADELPHIA SINGLE STACK VENT SYSTEM. ALL WORK TO BE INSTALLED IN STRICT COMPLIANCE WITH 2018 PPC AND APPROVED PLANS
- Issued Feb 26, 2026
Addition and/or Alteration · install 13 light fixtures, 6 switches, 9 receptacles and raceways for xray ***NO FIRE ALARM ON THIS PERMIT***
- Issued Feb 17, 2026
Rough-In · Rough-In Permit for EP-2026-001254 Install (13) Light fixtures (6) switches, (9) receptacles and raceways for X-ray machine
- Issued Feb 11, 2026
Addition and/or Alterations · FOR THE INSTALLATION OF REGISTERS, DIFFUSERS, AND APPLIANCES WITH ASSOCIATED DUCTWORK. APPLIANCES TO BE INSTALLED IN ACCORDANCE WITH THE MANUFACTURER’S SPECIFICATIONS. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS REQUIRED FOR ALL OTHER WORK. **AMENDMENT (4-23-2026) ADDING A FUEL GAS PIPING SYSTEM PER THE APPROVED AMENDED CONSTRUCTION DOCUMENTS.
- Issued Feb 11, 2026
Addition and/or Alteration · Provide demolition and temporary power and lighting as required for construction activities. Install new branch circuitry, new permanent lighting and lighting control systems, including exit signs and emergency lighting. Install telecommunication wiring and receptacle outlets throughout the space. Furnish and install one (1) 100-amp subpanel and one (1) 225-amp subpanel, including feeders, overcurrent protection, grounding, and bonding, All work to be done according to the 2017 NEC and per app
- Issued Jan 28, 2026
1 units
Addition and/or Alteration · FOR LEVEL II ALTERATIONS TO AN EXISTING STRUCTURE AT SUITE 106 & 108 ON GROUND FLOOR. ALTERATIONS TO INCLUDE PARTIAL DEMOLITION AND THE ERECTION OF PARTITION WALLS, PROVIDE FINISHES/FURNISHINGS AND ACCESSIBILITY IMPROVEMENTS THROUGHOUT. FOR USE AS PREVIOUSLY APPROVED. ALL WORK TO BE DONE PER APPROVED PLANS AND DOCUMENTATION. ***************** SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK. ******************************************
- Issued Dec 31, 2025
Addition and/or Alteration · Electrical demolition of an existing ceiling and install new lighting and make electrical connections on an operating boom. We are to run one new circuit in type EMT conduit for a boom light and it's associated control panel. We are also running type EMT conduit for(10) new downlights using the existing circuits.-2017 NEC.
- Issued Dec 17, 2025
Addition and/or Alterations · FORA MECHANICAL SYSTEM UPGRADE TO AN EXISTING STRUCTURE. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK.
- Issued Dec 15, 2025
Addition and/or Alterations · FOR THE INSTALLATION OF REGISTERS / DIFFUSERS TO BE INSTALLED IN ACCORDANCE WITH THE MANUFACTURER’S SPECIFICATIONS. FOR USE AS PREVIOUSLY APPROVED. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK.
- Issued Dec 3, 2025
1 units
Addition and/or Alteration · FOR LEVEL II ALTERATIONS TO AN EXISTING STRUCTURE. ALTERATIONS TO INCLUDE THE ERECTION OF PARTITION WALLS, PROVIDE FINISHES/FURNISHINGS AND ACCESSIBILITY IMPROVMENTS THROUGHOUT. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK. ASBESTOS ABATEMENT REQUIRED PRIOR TO THE START OF WORK. DOH APPROVAL UNDER DWG. INDEX H-25-0369 AND ID #200701-21.
- Issued Nov 17, 2025
1 units
Addition and/or Alteration · FOR LEVEL I ALTERATIONS PER APPROVED PLANS. SEPARATE PERMITS REQUIRED FOR MECHANICAL, ELECTRICAL AND PLUMBING WORK.
- Issued Sep 25, 2025
Addition and/or Alteration · Upgrade the fire alarm system including NAC devices and Initiating devices in Founders Building, Patient Care Center, Heart and Surgery Center as per 2016 NFPA 72.
- Issued Aug 4, 2025
Addition and/or Alteration · INSTALL TELECOMMUNICATION WIRING. ALL WORK TO BE DONE ACCORDING TO THE 2017 NEC.
- Issued Jul 10, 2025
Addition and/or Alterations · FOR THE INSTALLATION OF REGISTERS AND DIFFUSERS WITH ASSOCIATED DUCTWORK. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS REQUIRED FOR ALL OTHER WORK. *NO APPLIANCES ON THIS PERMIT.
Track this owner
We'll flag their next deal, permit, or filing — usually before the neighbors know.
Entities are grouped by a normalized name from the public record; a separate legal entity per building is common, so some portfolios span several related names. Sources: Phila. Dept. of Records (deeds), L&I (permits & violations), Dept. of Revenue (tax delinquencies), reflecting the record as of our last weekly ingest. Verify independently before relying on it.
Last generated July 15, 2026.