16 permits
- Records on file
- 16
Built (as contractor)
16 entries
- Issued Oct 6, 2026
Alterations · Installation of commercial kitchen plumbing fixtures per plans, (2) tankless hot water heaters, new bathrooms on 1st and 2nd floor per plans All piping must be metallic. 2021 PPC sec 919
- Issued Oct 6, 2026
Alterations · - Approved plumbing work associated with an (Addition or Alteration) per EZ Permit Standard for Plumbing. REPLACE 3/4" BACKFLOW DEVICE.
- Issued Oct 2, 2026
Alterations · Approved plumbing work associated with an (Addition or Alteration) per EZ Permit Standard for Plumbing.
- Issued Oct 2, 2026
Alterations · Approved plumbing work associated with an (Addition or Alteration) per EZ Permit Standard for Plumbing.
- Issued Sep 29, 2026
Alterations · 3-comp sink/ 1 mop sink/ 1 comp sink /1 hand sink/ 1 floor drain / 1 comp pre sink
- Issued Sep 28, 2026
Addition and/or Alterations · FOR THE INSTALLATION OF A TYPE I COMMERCIAL KITCHEN HOOD (16'-0") AND FOR THE INSTALLATION OF A TYPE II COMMERCIAL KITCHEN HOOD (4'-0") TO INCLUDE ASSOCIATED DUCTWORK, FANS AS PER APPROVED PLANS. ***********************SEPARATE PERMITS REQUIRED FOR ELECTRICAL AND FIRE SUPPRESSION WORK. **IMC 2018*************
- Issued Sep 24, 2026
Addition and/or Alterations · FOR A MECHANICAL INSTALLATION TO ACCOMMODATE A RESTAURANT. APPLIANCES TO BE INSTALLED IN ACCORDANCE WITH THE MANUFACTURER’S SPECIFICATIONS. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK.
- Issued Aug 27, 2026
1 units
Addition and/or Alteration · FOR A LEVEL II INTERIOR ALTERATIONSTO INCLUDE A CHANGE IN OCCUPANCY. FOR A BUSINESS OCCUPANCY . ALL WORK TO BE DONE PER APPROVED PLANS.** IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK**IEBC 2021**EXISTING BUILDING FULLY SPRINKLERED** SEPARATE PERMITS REQUIRED FOR ALL OTHER WORK**
- Issued Dec 6, 2025
New Construction or Additions · Install 4 toilettes, 4 lavs, 2 sinks, drain for washer
- Issued Nov 13, 2025
Addition and/or Alterations · FOR THE INSTALLATION OF ONE (1) TYPE I COMMERCIAL KITCHEN HOOD (12'-0") AND ASSOCIATED DUCTWORK, EXHAUST FAN, AND MAKEUP AIR UNIT AS PER APPROVED PLANS. SEPARATE PERMITS REQUIRED FOR FIRE SUPPRESION WORK.
- Issued Nov 13, 2025
Addition and/or Alterations · FOR THE INSTALLATION OF ONE (1) 10' 0" TYPE I KITCHEN EXHAUST HOOD AND ONE (1) 4' 0" TYPE II KITCHEN EXHAUST HOOD WITH EXHAUST FANS AND A MAKE UP AIR FAN. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN PROFESSIONAL PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK.
- Issued Nov 13, 2025
1 units
Addition and/or Alteration · FOR CHANGE OF OCCUPANCY (GROUP B) AND LEVEL II ALTERATIONS TO INCLUDE NEW EQUIPMENT AND ADA COUNTER AS PER APPROVED PLANS. SEPARATE PERMITS REQUIRED FOR MEP WORK. *2018 IEBC*
- Issued Nov 13, 2025
Alterations · Interior installation of drainage, waste, vent, and water supply for listed fixtures connecting to existing metallic piping. ALL piping utilized on this project shall be metallic to roof extension. venting to be designed and installed in accordance with section 919 Philadelphia single stack vent system. ALL food prep fixtures will be provided with air gaps and backflow preventers where required by code. All work shall be performed in strict compliance with 2018 PPC and approved plans. Deviation
Track this owner
We'll flag their next deal, permit, or filing — usually before the neighbors know.
Entities are grouped by a normalized name from the public record; a separate legal entity per building is common, so some portfolios span several related names. Sources: Phila. Dept. of Records (deeds), L&I (permits & violations), Dept. of Revenue (tax delinquencies), reflecting the record as of our last weekly ingest. Verify independently before relying on it.
Last generated October 29, 2026.