Entity File · The Public Record
Company / LLC
Franzini Electrical Systems LLC
29 permits
- Records on file
- 29
Built (as contractor)
29 entries
- Issued Jul 7, 2026
Addition and/or Alteration · INSTALLATION OF ROOFTOP MOUNTED 6.02 KW SOLAR PHOTOVOLTAIC PV SYSTEM ACCORDING TO THE 2017 NEC AND PER EZ STANDARD.
- Issued Jun 26, 2026
Addition and/or Alteration · Installation of a 6.88KwDC Solar PV system according to the 2017 NEC In Accordance with attached EZ standard
- Issued Jun 25, 2026
Addition and/or Alteration · Installation of solar array in accordance with signed standard
- Issued Jun 20, 2026
Addition and/or Alteration · INSTALLATION OF ROOFTOP MOUNTED 3.44KW SOLAR PHOTOVOLTAIC PV SYSTEM ACCORDING TO THE 2017 NEC AND PER EZ STANDARD.
- Issued Jun 20, 2026
Addition and/or Alteration · INSTALLATION OF ROOFTOP MOUNTED 3.87 KW SOLAR PHOTOVOLTAIC PV SYSTEM ACCORDING TO THE 2017 NEC AND PER EZ STANDARD.
- Issued Jun 20, 2026
Addition and/or Alteration · INSTALLATION OF ROOFTOP MOUNTED 5.16KW SOLAR PHOTOVOLTAIC PV SYSTEM ACCORDING TO THE 2017 NEC AND PER EZ STANDARD.
- Issued Jun 20, 2026
Addition and/or Alteration · INSTALLATION OF ROOFTOP MOUNTED 5.16 KW SOLAR PHOTOVOLTAIC PV SYSTEM ACCORDING TO THE 2017 NEC AND PER EZ STANDARD.
- Issued Jun 20, 2026
Addition and/or Alteration · INSTALLATION OF ROOFTOP MOUNTED 3.87 KW SOLAR PHOTOVOLTAIC PV SYSTEM ACCORDING TO THE 2017 NEC AND PER EZ STANDARD.
- Issued Jun 18, 2026
Addition and/or Alteration · Installation of a 8.17KwDC Solar PV system according to the 2017 NEC and in accordance with attached standard.
- Issued Jun 18, 2026
Addition and/or Alteration · Install a 8.17KwDC Solar PV system installation according to the 2017 NEC and with the attached signed EZ Standard.
- Issued Jun 18, 2026
Addition and/or Alteration · Installation of a 4.73KwDC Solar PV system according to the 2017 NEC and attached Ez - Standard
- Issued Jun 18, 2026
Addition and/or Alteration · Installation of a 4.30KwDC Solar PV system according to the 2017 NEC and attached EZ Standard
- Issued Jun 17, 2026
Addition and/or Alteration · Installation of new wiring , back boxes , switches, receptacles, lighting, GFI`s and arc fault protection were needed based off the 2017 NEC. The work will take place on the first living room, dining room and kitchen. Existing 200amp SP service 120/240v will be utilized.
- Issued Jun 16, 2026
Addition and/or Alteration · Install all new wiring, back boxes, switches, receptacles and lighting based on the MEP drawings Pages E-01 and E-02. Work based off the 2017 NEC. Utilizing existing 400amp 208/120v Service. No Fire Alarm No Data or Coaxial cabling
- Issued Jun 2, 2026
Addition and/or Alteration · Installation of new lighting, switches, receptacles and GFI`s
- Issued Jun 2, 2026
Addition and/or Alteration · Basement Bathroom Install one dedicated 20 amp 120v circuit for Bathroom GFI Install one 20 amp 120v circuit to feed lighting, exhaust fan and hand dryer.
- Issued May 15, 2026
Addition and/or Alteration · Install all new wiring, back boxes, switches, receptacles, and lighting, HVAC power. Installation of show window receptacles. Existing service. All work per approved plans. NEC 2017 ***NO FIRE ALARM ON THIS PERMIT***
- Issued Mar 25, 2026
Addition and/or Alteration · Install all new wiring, switches, receptacles, back boxes, and lighting according to the 2017 NEC. The work will take place on the basement and First floor only. Existing 200 amp Electrical service
- Issued Oct 30, 2025
Addition and/or Alteration · INSTALL WIRING, LIGHTING, SWITCHES AND RECEPTACLE OUTLETS TO TENANT SPACE. ALL WORK TO BE DONE ACCORDING TO THE 2017 NEC AND PER PLANS. *************************** FIRE ALARM SYSTEM IS NOT INCLUDED IN THE SCOPE OF WORK********************
- Issued Oct 28, 2025
Rough-In · Rough-In Permit for EP-2025-010128 Install all new wiring, back boxes, switches, lighting and GFI`s were needed according to the 2017 NEC. Locations are depicted on the submitted MEP drawings. Existing 400amp 3 phase 208/120 Service No fire alarm or data wiring.
- Issued Oct 15, 2025
Addition and/or Alteration · Install a 5.51KWAC Solar PV system on the roof of the dwelling according to the 2017 NEC
- Issued Sep 2, 2025
Addition and/or Alteration · Installation of a 2.32KW Solar PV system according to the 2017 NEC
- Issued Aug 21, 2025
Addition and/or Alteration · INSTALLATION OF ROOFTOP MOUNTED 6.48 KW SOLAR PHOTOVOLTAIC PV SYSTEM ACCORDING TO THE 2017 NEC AND PER PLANS.
- Issued Aug 20, 2025
Addition and/or Alteration · Installation of 4.06KW Solar PV system according the 2017 NEC
- Issued Aug 20, 2025
Addition and/or Alteration · INSTALLATION OF ROOFTOP MOUNTED 6.15 KW DC SOLAR PHOTOVOLTAIC PV SYSTEM ACCORDING TO THE 2017 NEC AND PER PLANS.
- Issued Aug 1, 2025
Addition and/or Alteration · Install new 400 amp service with grounding. Install all new wiring, back boxes, switches, lighting, receptacles and GFCI(s) where needed as per 2017 NEC.
- Issued Jul 16, 2025
Addition and/or Alteration · Install all new wiring, back boxes, switches, receptacles, lighting and service equipment based of the current MEP`s new 200amp service to serve the restaurant space on basement and first floor
Track this owner
We'll flag their next deal, permit, or filing — usually before the neighbors know.
Entities are grouped by a normalized name from the public record; a separate legal entity per building is common, so some portfolios span several related names. Sources: Phila. Dept. of Records (deeds), L&I (permits & violations), Dept. of Revenue (tax delinquencies), reflecting the record as of our last weekly ingest. Verify independently before relying on it.
Last generated August 1, 2026.