Entity File · The Public Record
Contractor
Gazi Ataseven
3 permits
- Records on file
- 3
Built (as contractor)
3 entries
- Issued Mar 5, 2026
2 units
New Construction · FOR NEW CONSTRUCTION OF A THREE (3) STORY WOOD-FRAME ATTACHED STRUCTURE ON REINFORCED CONCRETE FOOTINGS/FOUNDATIONS WITH A ROOF DECK. FOR USE AS A TWO-FAMILY DWELLING THROUGHOUT. BUILDING SHALL BE FULLY SPRINKLERED (13D), SEPARATE PERMITS REQUIRED FOR ALL MECHANICAL, ELECTRICAL, PLUMBING, AND FIRE SUPPRESSION SYSTEMS. *PROTECTION OF RIGHT-OF-WAY / PEDESTRIANS / ADJACENT PROPERTIES REQUIRED DURING ALL CONSTRUCTION.*ENERGY CODE COMPLIANCE IN ACCORDANCE WITH 2015 IECC. PRIOR TO ISSUANCE OF C.O SUBM
- Issued Dec 27, 2025
4 units
New Construction · FOR THE ERECTION OF AN ATTACHED STRUCTURE AS PER APPROVED PLANS. BUILDING TO BE FULLY SPRINKLERED PER NFPA 13. SEPARATE PERMITS REQUIRED FOR MEP & FP WORK.
- Issued Dec 27, 2025
4 units
New Construction · FOR NEW CONSTRUCTION OF A THREE-STORY WOOD-FRAME ATTACHED STRUCTURE ON REINFORCED CONCRETE FOOTINGS/FOUNDATIONS WITH A ROOF DECK AND. FOR USE AS A MULTI-FAMILY HOUSEHOLD LIVING FOR FOUR (4) DWELLING UNITS THROUGHOUT. BUILDING SHALL BE FULLY SPRINKLERED PER NFPA13. ** SEPARATE PERMITS REQUIRED FOR ALL MECHANICAL, ELECTRICAL, PLUMBING, AND FIRE SUPPRESSION SYSTEMS. *PROTECTION OF RIGHT-OF-WAY / PEDESTRIANS / ADJACENT PROPERTIES REQUIRED DURING ALL CONSTRUCTION.*ENERGY CODE COMPLIANCE IN ACCORDAN
Track this owner
We'll flag their next deal, permit, or filing — usually before the neighbors know.
Entities are grouped by a normalized name from the public record; a separate legal entity per building is common, so some portfolios span several related names. Sources: Phila. Dept. of Records (deeds), L&I (permits & violations), Dept. of Revenue (tax delinquencies), reflecting the record as of our last weekly ingest. Verify independently before relying on it.
Last generated August 1, 2026.