13 permits
- Records on file
- 13
Permits (as owner)
13 entries
- Issued Jun 1, 2026
Addition and/or Alteration · Install 264 light fixture, 32 exit, 110 switch, 139 receptacle, 2 floor receptacle, 22 furniture power, 12 equipment power. Fire Alarm: Install 33 speaker/strobe, 2 strobe, 11 smoke detector, 1 heat detector, 1 relay, 1 NAC Panel. Data: Install 176 CAT-6 cables, 2 patch Panels. Security: Install 13 card readers, 12 REX, 4 mag lock, 7 door contact, 7 push button, 9 camera, 1 panic button, 1 video intercom, 1 panel.
- Issued Apr 16, 2026
Addition and/or Alteration · HORIZONTAL CABLING: Cabling will be CommScope Category 6A plenum rated 4-pair and CommScope RG6 quad shield plenum rated coax. • Provide and install two (2) surface mount single Category 6A access control panel locations. • Provide and install twenty-two (22) surface mount single Category 6A camera locations. • Provide and install one (1) surface mount single Category 6A emergency phone location. • Provide and install one (1) surface mount single Category 6A Int DS location. • Provide and instal
- Issued Apr 8, 2026
Alterations · Plumbing per plans installed to the 2018 Philadelphia Plumbing Code section 919. All piping must be metallic
- Issued Apr 2, 2026
Addition and/or Alterations · FOR THE INSTALLATION OF REGISTERS, DIFFUSERS, AND APPLIANCES WITH ASSOCIATED DUCTWORK. APPLIANCES TO BE INSTALLED IN ACCORDANCE WITH THE MANUFACTURER’S SPECIFICATIONS. FOR USE AS PREVIOUSLY APPROVED. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK.
- Issued Apr 2, 2026
Addition and/or Alteration · Install New Lighting, New pathways only for low voltage, Fire Alarm , Receptacles .ALL WORK IS TO BE DONE ACCORDING TO APPROVED DRAWINGS-2017 NEC,2016 NFPA-72.
- Issued Apr 1, 2026
Addition and/or Alterations · FOR THE INSTALLATION OF REGISTERS, DIFFUSERS, AND APPLIANCES WITH ASSOCIATED DUCTWORK. APPLIANCES TO BE INSTALLED IN ACCORDANCE WITH MANUFACTURER'S SPECIFICATIONS. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS REQUIRED FOR ALL OTHER WORK.
- Issued Mar 26, 2026
EZ Roof Covering Replacement · For minor construction work at the subject property in accordance with all applicable provisions of the Philadelphia Code, all references codes and standards, and the attached EZ Standard, where included. Deviation from this standard shall result in permit revocation. A separate permit from the Philadelphia Department of Streets is required for any sidewalk and street closures. All means of pedestrian protection required at the site in accordance with the Philadelphia Building Code Chapter 33 sh
- Issued Mar 18, 2026
Addition and/or Alterations · EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the relocation of sprinkler heads as per attached standards. Deviations from these standards require submission of construction and site plans. Relocate 179 existing sprinkler heads
- Issued Mar 18, 2026
1 units
Addition and/or Alteration · FOR LEVEL II ALTERATIONS TO INCLUDE STRUCTURAL WORK, NEW PARTITIONS, FIXTURES, FURNISHINGS, FINISHES AS PER APPROVED PLANS. SEPARATE PERMITS REQUIRED FOR MEP AND FIRE SUPPRESSION WORK. 2018 IEBC
- Issued Mar 4, 2026
Addition and/or Alterations · EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the relocation of sprinkler heads as per attached standards. Deviations from these standards require submission of construction and site plans. Relocate (96) sprinklers to accommodate interior alterations for police station relocation
- Issued Feb 27, 2026
Alterations · to install 7 new fixtures, including new piping from the mains. 1 water closet, 1 lavatory, 1 kitchen sink, 1 sewage pump, 1 water heater and 2 ice maker boxes.
- Issued Feb 25, 2026
1 units
Addition and/or Alteration · FOR LEVEL II ALTERATIONS TO RELOCATE JEFFERSON POLICE STATION TO INCLUDE NEW PARTITIONS, FIXTURES, FURNISHINGS, FINISHES AS PER APPROVED PLANS. SEPARATE PERMITS REQUIRED FOR MEP AND FIRE SUPPRESSION WORK. *2018 IEBC*
- Issued Jan 29, 2026
EZ Interior Non-Load-Bearing Wall Demo. · For minor construction work at the subject property in accordance with all applicable provisions of the Philadelphia Code, all references codes and standards, and the attached EZ Standard, where included. Deviation from this standard shall result in permit revocation. A separate permit from the Philadelphia Department of Streets is required for any sidewalk and street closures. All means of pedestrian protection required at the site in accordance with the Philadelphia Building Code Chapter 33 sh
Track this owner
We'll flag their next deal, permit, or filing — usually before the neighbors know.
Entities are grouped by a normalized name from the public record; a separate legal entity per building is common, so some portfolios span several related names. Sources: Phila. Dept. of Records (deeds), L&I (permits & violations), Dept. of Revenue (tax delinquencies), reflecting the record as of our last weekly ingest. Verify independently before relying on it.
Last generated July 15, 2026.