Entity File · The Public Record
Company / LLC
Grosso Concrete LLC
92 permits
- Records on file
- 92
Permits (as owner)
1 entry
Built (as contractor)
91 entries
- Issued Jun 12, 2026
Addition and/or Alteration · For the addition of an exterior deck at the rear and for interior and exterior alterations to an existing attached single-family dwelling per plans. Separate permits are required for all associated Mechanical, Electrical, and Plumbing work.
- Issued Mar 13, 2026
1 units
Excavation · Site / Utility Permit for RP-2025-013189 FOR EXCAVATION WORK ASSOCIATED WITH NEW CONSTRUCTION OF A THREE (3) STORY SINGLE-FAMILY DWELLING AS PER APPROVED PLANS. WORK TO INCLUDE TEMPORARY EXCAVATION SUPPORT SYSTEM AND UNDERPINNING. NO BUILDING CONSTRUCTION APPROVED ON THIS PERMIT. *2018 IRC REVIEW* **SEPARATE PERMITS REQUIRED FOR BUILDING CONSTRUCTION**
- Issued Mar 9, 2026
1 units
Excavation · Amend Permit 4/21/2026 reconfiguration of cellar to work with the existing condition of the adjacent rowhouse. Work to include revised excavation and foundation wall. No Increase in excavation Depth.
- Issued Mar 5, 2026
1 units
Excavation · Site / Utility Permit for RP-2025-010886 FOR EXCAVATION WORK ASSOCIATED WITH NEW CONSTRUCTION OF A THREE (3) STORY SINGLE-FAMILY DWELLING AS PER APPROVED PLANS. WORK TO INCLUDE TEMPORARY EXCAVATION SUPPORT SYSTEM. NO BUILDING CONSTRUCTION APPROVED ON THIS PERMIT. **2018 IRC REVIEW**
- Issued Feb 25, 2026
1 units
Excavation · FOR EXCAVATION ONLY PER APPROVED PLAN. SEPARATE PERMITS REQUIRED FOR BUILDING, MECHANICAL, ELECTRICAL, PLUMBING AND FIRE SUPPRESSION.
- Issued Feb 23, 2026
Excavation · FOR EXCAVATION ONLY. SEPARATE PERMITS REQUIRED FOR BUILDING, MECHANICAL, ELECTRICAL, PLUMBING AND FIRE SUPPRESSION.
- Issued Feb 10, 2026
2 units
Excavation · FOR EXCAVATION ONLY PER APPROVED PLAN. SEPARATE PERMITS REQUIRED FOR BUILDING, MECHANICAL, ELECTRICAL, PLUMBING AND FIRE SUPPRESSION WORK.
- Issued Jan 21, 2026
2 units
Excavation · Site / Utility Permit for RP-2025-004615 3/18/26 AMENDMENT: AMEND PERMIT TO CHANGE SPECIAL INSPECTOR AND INSPECTIONS AGENCY FROM JAMES CLANCY TO SPECIAL INSPECTOR CHRISTOPHER MENNA, CHRISTOPHER MENNA AGENCY AND QUANTUM ENGINEERING CONSULTANCY.
- Issued Jan 12, 2026
Excavation · FOR THE EXCAVATION ASSOCIATED WITH NEW NON-LOAD BEARING WALLS. ALL WORK TO BE DONE PER THE APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT THE DESIGN ENGINEER PRIOR TO THE START OF WORK. SEPARATE PERMITS REQURIED FOR ALL OTHER WORK
- Issued Jan 8, 2026
2 units
Excavation · Site / Utility Permit for RP-2024-004346
- Issued Dec 2, 2025
1 units
Excavation · FOR SITEWORK/EXCAVATION AS PER APPROVED PLANS.
- Issued Nov 5, 2025
Excavation · FOR EXCAVATION AND UNDERPINNING AS PER APPROVED PLANS. SEPARATE PERMITS REQUIRED FOR CONSTRUCTION.
- Issued Oct 24, 2025
1 units
Excavation · Site / Utility Permit for RP-2025-008013 AMENDMENT #1 AMEND TO CHANGE THE DPRC-SI FROM ALEX BRUNO TO JAMES CLANCY AND SPECIAL INSPECTION AGENCY TO JAMES CLANCY.
- Issued Sep 24, 2025
1 units
Excavation · FOR EXCAVATION RELATED TO BUILDING FOUNDATION CONSTRUCTION. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS REQUIRED FOR ALL OTHER WORK. ** SEE BUILDING PERMIT FOR ALL OTHER STRUCTURAL WORK **
- Issued Sep 22, 2025
1 units
Excavation · Amend Permit 7/2/2026 - change the DPRC-SI from Alex Bruno to Jim Clancy. Site / Utility Permit for RP-2025-008405
- Issued Sep 15, 2025
1 units
Excavation · FOR AN EXCAVATION PERMIT FOR A NEW CONSTRUCTION. ALL WORK TO BE DONE PER APPROVED PLANS.** IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK**IBC 2018**
- Issued Aug 12, 2025
1 units
Excavation · TO LEGALIZE EXCAVATION AND UNDERPINNING OF EXISTING ATTACHED BUILDING.
- Issued Aug 7, 2025
1 units
Foundation · FOR THE PARTIAL DEMOLITION OF EXISTING FOUNDATION WALL ALONG THE SIDE OF THE PROPERTY AND TO ERECT NEW FOUNDATION WALL PER APPROVED PLANS.
- Issued Aug 7, 2025
1 units
Foundation · FOR PARTIAL DEMO OF EXISTING FOUNDATION SIDE WALL AND FOR THE CONSTRUCTION OF NEW SIDE WALL FOUNDATION. AS PER APPROVED PLANS.
- Issued Jul 11, 2025
1 units
New Construction · FOR A NEW CONSTRUCTION OF A THREE-STORY WOOD-FRAME ATTACHED STRUCTURE ON REINFORCED CONCRETE FOOTINGS/FOUNDATIONS WITH A ROOF DECK AND A ROOF DECK ACCESS STRUCTURE. FOR USE AS A SINGLE-FAMILY DWELLING THROUGHOUT. BUILDING SHALL BE FULLY SPRINKLERED PER NFPA 13D. MECHANICAL WORK INCKLUDED IN THE REVIEW. SEPARATE PERMITS REQUIRED FOR ALL ELECTRICAL, PLUMBING, AND FIRE SUPPRESSION SYSTEM INSTALLATION. **PROTECTION OF RIGHT-OF-WAY / PEDESTRIANS / ADJACENT PROPERTIES REQUIRED DURING ALL CONSTRUCTION.
Track this owner
We'll flag their next deal, permit, or filing — usually before the neighbors know.
Entities are grouped by a normalized name from the public record; a separate legal entity per building is common, so some portfolios span several related names. Sources: Phila. Dept. of Records (deeds), L&I (permits & violations), Dept. of Revenue (tax delinquencies), reflecting the record as of our last weekly ingest. Verify independently before relying on it.
Last generated August 1, 2026.