Entity File · The Public Record
Company / LLC
Harrison INC
1 sold · 7 permits · 1 violation
- Records on file
- 9
Sold
1 entry
Permits (as owner)
7 entries
- Issued Aug 5, 2026
3 units
New Construction · FOR THE ERECTION OF A THREE (3) STORY ATTACHED STRUCTURE WITH BASEMENT AND REAR DECKS FOR USE AS THREE (3) DWELLING UNITS (GROUP R-2). BUILDING TO BE FULLY SPRINKLERED PER NFPA 13R. ALL WORK TO BE DONE PER APPROVED PLANS AND IN ACCORDANCE WITH 2018 IBC. SEPARATE PERMITS REQUIRED FOR MECHANICAL, ELECTRICAL, PLUMBING, FIRE SUPPRESSION, AND EXCAVATION WORK.
- Issued Aug 5, 2026
3 units
New Construction · FOR THE ERECTION OF A THREE (3) STORY ATTACHED STRUCTURE OF TYPE V-B CONSTRUCTION WITH BASEMENT AND REAR DECKS FOR USE AS THREE (3) DWELLING UNITS (GROUP R-2). BUILDING TO BE FULLY SPRINKLERED PER NFPA 13. ALL WORK TO BE DONE PER APPROVED PLANS AND IN ACCORDANCE WITH 2018 IBC. SEPARATE PERMITS REQUIRED FOR MECHANICAL, ELECTRICAL, PLUMBING, FIRE SUPPRESSION, AND EXCAVATION WORK.
- Issued Jan 13, 2026
New Construction · Scope of Work (Supply & Install) Electrical Service & Distribution • New 200A electrical service • New 40-circuit panel • Complete grounding and bonding • AFCI and GFCI protection per NEC and local code Interior Lighting • 4” LED recessed lighting throughout hallways, stairs, bedrooms, living room, kitchen, and garage Devices • Outlets and switches throughout per code • All white Decora devices Closets & Bathrooms • Motion sensor lighting in all closets • Bathrooms to include recessed lightin
- Issued Nov 12, 2025
New Construction · FOR THE INSTALLATION OF A 2-INCH FIRE SERVICE LINE FOR AN AUTOMATIC FIRE SUPPRESSION SPRINKLER SYSTEM WITH A 2 INCH WILKINS 950XLT2 BACKFLOW PREVENTION ASSEMBLY IN ACCORDANCE WITH NFPA 13R. ALL WORK SHALL BE DONE IN ACCORDANCE WITH APPROVED PLANS/HYDRAULIC CALCULATIONS.
- Issued Sep 24, 2025
1 units
Excavation · FOR EXCAVATION RELATED TO BUILDING FOUNDATION CONSTRUCTION. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS REQUIRED FOR ALL OTHER WORK. ** SEE BUILDING PERMIT FOR ALL OTHER STRUCTURAL WORK **
Violations
1 entry
- Violation Aug 10, 2026OPEN
EXTERIOR AREA WEEDS
Track this owner
We'll flag their next deal, permit, or filing — usually before the neighbors know.
Entities are grouped by a normalized name from the public record; a separate legal entity per building is common, so some portfolios span several related names. Sources: Phila. Dept. of Records (deeds), L&I (permits & violations), Dept. of Revenue (tax delinquencies), reflecting the record as of our last weekly ingest. Verify independently before relying on it.
Last generated November 7, 2026.